ML19338C092

From kanterella
Jump to navigation Jump to search
Memorandum & Order Authorizing Intervenor Discovery of Documents Consulted by Members of ECCS Task Force Re BWR & Addl Documents on Which Util Based Assertion of Compliance W/Commission Regulation
ML19338C092
Person / Time
Site: Midland
Issue date: 09/21/1971
From: Yore J
Atomic Safety and Licensing Board Panel
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML19338C084 List:
References
NUDOCS 8007310672
Download: ML19338C092 (4)


Text

_, ;.

a-

- : APPENDIX B

~.

Q.rN l UNITED STATES.0FI A31 ERICA

~

ATO111C ENERGY C051SIISSION n.

BEFORE THE A'IOMIC SAFETY AND ' LICENSING COARD L

-In the. Matter ofl

)

L)~

LONG TISLAND LIGitTING CO'.lpANY

)

Docket No. 50-322-

)

(Shorehan: Nuclcar-Power St'a tion)

)

llemorandum' and ? Ore'.c On September 16, 197'l. a conference '.of the counscl. for the parties'v>as hold in New York City to discuss procedures and schedules.

Supplementing the discussion a t this. cor.-

forence thc. followiag guidiaco is being set '.forth -by the I

Board to assis t in - the. orderly condu'ct of this proceeding.

-(1 ). The hearing wil1 be reopened on

-November 2, 1971 for the limited purpose 1

.of covoring-the question of the compliance

of the proposed Shorcham emergency core j

cooling system with the Commission ret;u-la'tions.' -

" Interim Acceptance Critoria for Emergency./ Core -Cooling Syctems for Light-h'a ter: power Reactors." '(36 F.R.

g

~

12247). ' The ~ Applicant and. the S taf f will

]

. bc # a f forded.- tho.oppor tunity to of fer ovidence: on this specific ~ subject.

Tho.

exact time.and'-lo, cation'for this-session i

.)

. =g<

h

(

,y

~,

L

}

2;y

+

~

will be: announced in a subsequent order, but this advance notice.is being. furnished in order that all; parties ~will have ample

.timo'to arrange their: schedules and to make-preparation. :The past practice of all parties ' serving all proposed testimony in: writton form a t' lcas t. two wooks prior to'its: offer into evidence will remain in effect for the duration;of.this proceeding.

(2)- On-July 2G,.1971 the Applicant transmitted to all the parties the additional detailed technical data on the'Shoreham ECCS which had been. reques ted by the S ta f f on July 14, 1971.

On-August 18, 1971 :the Staf f forwarded to all the. parties copies of a " Supplement" to the

~

Staf f's Safety Evaluation in.this ma tter con-corning-the Applicant's proposed emergency core cooling system and copics of the Idaho Nuclear' Corporation 201 pageJdocument entitled

Semiscale' Tests 845 Through.851" and tho

. Idaho Nuclear Corporation' monthly reports from November 19.70 through April 1971.

On September 1,

1971Lthe Applicant furnished all parties copics.Lofl the throc General Elec.tric Company

topical reports which vicro referred to in the S taf f 's '.'Supplemen t".

Intervonor, the Lloyd

. Harbor-Study Group, Inc..had filed on July-9, 1971~:a " Motion of-Intorvenor, The-Lloyd~Ilarbor

Study Group, Inc.. Regarding'VisitIto'Hationdi O

i.

l x

.i W

y 4

3 7-

~

.- 3 --

Reactor Tes tit.g S tation, Idaho, and Depositions Ro ECCS Tests" and ' replies L o this motion were t.

filed by' the Staf f on ' July 19, 19'7'1:and by.the Applicant-on July 21, 1971.

In te rvenor 's

. motion at thatitime-was considered prematuro

'by the Boardcidasmuch,ast the reevaluation of

~ the Shorcham ECCS by the Staff, referred to above, was not yet completed.

In light of-the material that has now been furnished to the Study Group and the additional discovery which this. Order covers, the Board rules that

" good cause" as required by the Commission's

, regulations in 10 CFR 52.740 has not been shown for the proposed visit to the National Reactor. Testing Station and for the taking of depositipns.--However, the Board believes that.

intervenor isLentitled to discovery-in two

-additi'onal categories <and rules that intervonor

. expedi.tiously be-furnished :

(a)

Copics of' docunents consulted by.nembersiof the ECCS Task Force which

-specifica11y' relate to boiling wa ter reactors-(b)

Copics of' additional' documents, q

-if any, on which tho-Applicant has based'its assortion of coupliance with

.t the : Cor.imission. regulation

" Interim-P_ A _ ADOM_

h w

....;.x (9

/. :

.s.

- j

. :Y,*,

.v.

,.~

s

-n

~

~

j Acceptance? Criteria for Emergency

~

LCore Cooling Systems For Light-4 Water Reactors".:

LI

~

i l

.l

..I l

For the Atomic Safety and

- LiceirJing. Board

. s.

,. Chairman

. :ic s - It.- Yo

.c.

l Dn ted a t Washington,; D. C..

This 2/44 day - of September,1971 e

4 9

6 4

6 9

e-s j

y

~,

4 J

s

..