ML19338B988

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Diesel Generator Foundation & Bldg Settlement.Interim Rept to Be Forwarded by 790713
ML19338B988
Person / Time
Site: Midland
Issue date: 04/30/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML19338B977 List:
References
HOWE-132-79, NUDOCS 8007291137
Download: ML19338B988 (2)


Text

.

CODSumBIS M p0Wer  %-

aj C0mpHDy *3 x : ., -

o,=.., = w... ..~...,...~ s.. =~.. - .4,..c .n 7.. ...

April 30, 1979 sove-132-79 W 6g "3

-3

  1. A Y

Mr J G Keppler. Regional Director Office of Inspectica and Enforcenent M

1 g/

US Nuclear Regulatory Con =issica $bg /V Region III $ vf'<*

799 Roosevelt Road /f -

Glen Ellyn, IL 60137 cs: j%

MIDIAND NUCLEAR PLANT UNIT NO 1, DCCKET NO 50-329 UNIT NO 2, DOCKET NO 50-330 SEITLElEIT OF DTML GENERATOR FCUNDATIONS AND BUILDING

References:

1. S H Howell letters to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Settlement of Diesel Generator Foundations and Building; (a) Seriel Hove-183-78; dated September 29, 1978 (b) Serial Hove-230-78; dated Nove=ber 7,1978 (c) Serial Heve-267-78; dated Dece=ber 21, 1978 -

(d) Serial Hove-1-79; dated January 5,1979 (e) Serial Hove-58-79; dated February 23, 1979

2. G S Keeley letter to J G Keppler; Midland Project -

Docket No 30-329 and 50-330; Response to 10 CFR 50 5h -

Request en Plant Fill; Serial 6925; dated April 2k,1979 ,

This letter, as vere references 1. (a) throu6h (e), is an interim 50.55(e) report en the settlement of the diesel generatcr foundatiens and building.

The enclosure provides the status of the actions being taken to resolve the problem. This enclosure references a 50 5h(f) Report which contains =cre  ;

infor=ation regarding both the diesel generator building foundation and area l fill upon which other Class I structures are built. The 50 5k(f) Reper vas transnitted to you via reference 2. Please consider it as part of cur response on this subject. l l

Another interis report vill be sent en or before July 13, 1979 A.

Enclosure:

MCAR 24, Settlement of the Diesel Generator Foundations and Bu11 din 6, (Insufficient Cc=pacticu in Plant Area Fill Related to Seismic Category I Structures and Facilities), Interim .

Report p5, dated April 16, 1979 1 800729113 7 l

3 3

nove-132-79

\

l CC: Director, Office of Inspection & Enforcement Att: Mr John G Davis, Acting Director, USNRC (15)

Director, Office of Management Information and Program Centrol, USNRC (1) l 1

BCC: JLBacon, M-1085A '

'dRBird, JSC-216B ,

RLCastleberry, Bechtel AA TCCooke, Midland JLCorley, Midland 1ADreisbach, Bechtel-Midland --

DEorn, Midland CAHunt, P14-209B GSKeeley,. Plk-408B 1

MJKoschik, M-890A  ;

3W.argu61o, 1 JSC-22CA l PAMartinez, Bechtel AA D3M111er, Midland JFNevEen, Bechtel-Midland 4 1bbs, II&3 File: 0.4 9 20 4

l

\

1 4

e e

i l

l

- _