ML19338B977

From kanterella
Jump to navigation Jump to search
Forwards Util Interim & Final Deficiency Repts
Date released: 12/18/2019 Download: ML19338B977


Interim Deficiency Rept Re Diesel Generator Foundation & Bldg Settlement.Interim Rept to Be Forwarded by 790713
ML19338B988
Person / Time
Site: Midland
Issue date: 04/30/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML19338B988 (2)
Final Deficiency Rept Re Reactor Bldg Spray Piping Supports. Reactor Bldg Spray Piping Support Design Adequacy Verified & ASME Section 3 Code Allowable Stresses Met
ML19338B979
Person / Time
Site: Midland
Issue date: 05/01/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML19338B979 (18)
Forwards Util Interim & Final Deficiency Repts
ML19338B976
Person / Time
Site: Midland
Issue date: 05/04/1979
From: Gibbs M
ISHAM, LINCOLN & BEALE
To: COWAN F P, KORNBLITH L, SMITH I W
Atomic Safety and Licensing Board Panel
References
Download: ML19338B976 (1)