Forwards IE Insp Rept 50-213/80-06 on 800409-11.No Noncompliance Noted
ML19337B489
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/29/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19337B490 List:
References
NUDOCS 8010020629
Download: ML19337B489 (2)


See also: IR 05000213/1980006

Text

fk,

,

s..

.

- pW "%c4,

UNITED STATES

4

k

NUCLEAR REGULATORY COMMISslON

k

)* ) S

REGION 1

(*

E

sai ,ARx AvsNuc

f

KING OF PRUS$lA, PENNSYLVANI A 19406

,

.....

Docket No. 50-213

gg

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-213/80-06

This refers to the routine inspection conducted by Mr. J. Serabian of this

office on April 9-11, 1980 of activities authorized by NRC License No. OPR-61

and to the discussions of our findings held by Mr. J. Serabian with Mr. R.

Graves and others of your staff at the conclusion of the inspection, and to a

subsequent telephone discussion between Mr. J. Serabian and Mr. J. Ferguson on

April 14 and 15 and July 16, 1980.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such informati0n from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

80100204A9

G

,.

.

Connecticut Yankee Atomic Power

2

.

Company

JUL 2 9 IMO

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

!

.

,

Cr

e

'

Geo ge

. Smith, Chief

Fue l F cility and Materials Safety

Br anch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-213/80-06

cc w/ encl:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

!

-.