Text
fk,
,
s..
.
- pW "%c4,
UNITED STATES
4
k
NUCLEAR REGULATORY COMMISslON
k
)* ) S
REGION 1
(*
E
sai ,ARx AvsNuc
f
KING OF PRUS$lA, PENNSYLVANI A 19406
,
.....
Docket No. 50-213
gg
Connecticut Yankee Atomic Power Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-213/80-06
This refers to the routine inspection conducted by Mr. J. Serabian of this
office on April 9-11, 1980 of activities authorized by NRC License No. OPR-61
and to the discussions of our findings held by Mr. J. Serabian with Mr. R.
Graves and others of your staff at the conclusion of the inspection, and to a
subsequent telephone discussion between Mr. J. Serabian and Mr. J. Ferguson on
April 14 and 15 and July 16, 1980.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such informati0n from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
80100204A9
G
,.
.
Connecticut Yankee Atomic Power
2
.
Company
JUL 2 9 IMO
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
!
.
,
Cr
e
'
Geo ge
. Smith, Chief
Fue l F cility and Materials Safety
Br anch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-213/80-06
cc w/ encl:
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
!
-.