Forwards 800929 Rept, Preliminary Assessment Human Factors Review of Lasalle County Station Control Room, Per NUREG-0694 Requirements.Meeting Tentatively Scheduled 801015 to Discuss NRC Recommendations
ML19337B442
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/29/1980
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML19337B443 List:
References
RTR-NUREG-694 NUDOCS 8010020435
Download: ML19337B442 (1)


Text

s o Commonwealth Edison '

O on7 First N~t on1 Plats. CNeago, t!hnois Address Reply to: Post Ofhce Box 767 Chicago, lihnois 60690 September 29, 1980 Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Units 1 and 2 Control Room Human Factors Review NUREG-0694 Task I.O.1 NRC Docket Nos. 50-373 and 50-374

Dear Mr. Youngblood:

Enclosed for your use is the Commonwealth Edison

" Preliminary Assessment human Factors Review of the LaSalle Cour..y Station Control Room (29 September 1980)". This report was prepared to satisfy the requirement of Task I.D.1 in NUREG-0694 and was provided in draft form to your staff on September 8, 1980.

The NRC Human Factors Branch conducteo an on-site partial review of the LaSalle County Station Unit 1 control room design and operation on September 15-19, 1980. A separate review of the computer will be conducted on September 29-30, 1980. The on-site review last week, included comments from the NRC on a draf t of the enclosed report. Where appropriate, NRC comments have been included. It is our understanding that the NRC review team did not identify any significant safety concerns that would delay the fuel loading of LaSalle County Unit 1.

A meeting has been tentatively scheduled, by the NRC review team for October 15, 1980 to oiscuss the NRC recommendations on the LaSalle County control room. It is our understanding that we will receive the team inspection report prior to that meeting.

One (1) copy of tne subject report is ceing submitted now your your information. Additional copies will be provioed to you and your consultants upon receipt. If you nave any questions, please direct them to this office.

Very truly yours, L. O. De1 George Nuclear Licensing Administrator Enclosure cc: Mr. R. Walker (NRC - RIII)