Ack Receipt of 800911 Final Deficiency Rept Re Reinforcing Steel.Nrc Will Complete Review During Future Insp
ML19337B241
Person / Time
Site: Marble Hill
Issue date: 09/19/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 8010010691
Download: ML19337B241 (1)


Text

A.

  1. " "8?:y UNIT ED STATES

[

g

'+,

TJCLEAR REGULATORY COMMISSION f

D REGION til o

p U

'f 799 ROOSEVELT RO AD k

cLes cLLyn. Lusois um

....+

'SEP 19 =0

. Docket No. 50-546

~

~

Docket No. 50-547 Public Service of Indiana ATTN:

Mr. S. W. Shitids Senior Vice President Nuclear Division Post Office Box 190 New Washington, IN 47162 Gentlemen:

Thank you for your final report dated September 11, 1980, pu.suant to 10 CFR 50.55(e) regarding deficiencies in reinforcing steel. We will complete our review of this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely, O

6 Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Director, RCI/IE Director, AEOD Chief, OEB/MPA IE Files Mr. G. N. Brown, Proj ect Director i

C. Kammerer, CA cc w/1tr dtd 9/11/80:

Central Files PDR Local PDR NSIC TIC LeBoeuf, Lamb, Leiby & MacRae Mr. Dave Martin, Office of Attorney General Mr. John R. Galloway, Staff Director, Environment, Energy and Natural Resources Subcommittee S010010 N g

l

0911804en"

.~" ~

L_.

l..

PUBLIC SERVICE INDIANA September 11, 1980 S. W. Shields Senior Vice Presdent -

Nuclear Division Docket Nos.: STN 50-546 Mr. James G. Keppler, Director STN 50-547 U. S. Nuclear Regulatory Con: mission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On June 27, 1980, Mr. S. J. Brewer of Public Service Company of Indiana, Inc., (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). During the Construction Verification Program reinforcing steel was inspected in accordance with SPP-2.

This inspection resulted in a number of nonconformances in the generic areas of clear cover, member thickness, size of reinforcing bar, number of bars and bar spacing.

In the interim report dated July 24, 1980, PSI committed to performing an engineering evaluation of these nonconformances and also described the manner in which any necessary repairs would be made to the affected structural elements.

It was also indicated that a more detailed description of these concerns and corrective actions would be available in Section 2.0 of the report on the Construction Verification Program which has since been submitted to your office.

In that report PSI determined, based upon engineering evaluations, that corrective measures would be necessary to meet the design requirements of a number of equipment pads which had dowels missing. Were these dowels to have remained missing, failure of the pads in question may have resulted if subjected to the extreme loadings which may occur during certain design basis events. Repair of these pads and other corrective measures which are being taken to prevent reoccurence are described in more detail in Section 2.0 of the report on the Construction Verification Program.

0,

fl / /

l s'

l

I h V, ' Ll

/! p

,}!(

/

, W.j/p a1 (V(L/D;

/

yp 3r "A

\\

, j, -

/

/

/

o i P.O. Box 190, New Washington, Indiana 47162 812. 293.4441

o.

ad 4.i PUBLK:

SERVICE INDIANA Letter: James G. Keppler.

This letter is intended to fulfill the requirements of a final report

,as defined in 10 CFR 50.55(e). If you have any questions on this report, please feel free to contact nr.

Sincerely, S. W. Shields TDG/cg cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.