ML19337B191
| ML19337B191 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 08/04/1980 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Pasternak R POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML19337B192 | List: |
| References | |
| NUDOCS 8010010396 | |
| Download: ML19337B191 (2) | |
See also: IR 05000333/1980011
Text
4
Y%
O
c,J
Nop
UNITED STATES
NUCLEAR REGULATORY COMMiss!ON
-'
g*
g
j
REClON I
g
631 PARK AVENUE
KING OF PRUSSI A, PENNSYLVANI A 19406
~~
m wm
Docket No. 50-333
Power Authority of the State of New York
James A. FitzPatrick Nuclear Power Plant
ATTN: Mr. R. J. Pasternak
.
Resident Manager
'
P. O. Box 41
Lycoming, New York 13093
Gentlemen:
Subject:
Inspection No. 50-333/80-11
)
This refers to the routine inspection conducted by Mr. R. A. McBrearty of this
office on June 23-27, 1980 at the James A. FitzPatrick Nuclear Power Plant,
Scriba, New York of activities authorized by NRC License No. DPR-59 and to the
discussions of our findings held by Mr. McBrearty with Mr. R. J. Pasternack at the
'
conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
j
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) ~believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
i
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
l
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
i
this regard within the specified period, the report will be placed in the Pub?ic
Document Room.
4
&D30030 N
_-
_
__
.
.
Power Authority of the State
of New York
2
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
1
\\ Yl\\
l
Robert T. Carls
ef
,
'
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-333/80-11
cc w/ encl:
George T. Berry, President and Chief Operating Officer
J. P. Bayne, Senior Vice President-Nuclear Generation
A. Klausmann, Director, Quality Assurance
M. C. Cosgrove, Site Quality Assurance Engineer
J. F. Davis, Chairman, Safety Review Committee
C. M. Pratt, Assistant General Counsel
'
G. M. Wilverding, Manager-Nuclear Licensing
y
,,