ML19337B191

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-333/80-11 on 800623-27.No Noncompliance Noted
ML19337B191
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/04/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML19337B192 List:
References
NUDOCS 8010010396
Download: ML19337B191 (2)


See also: IR 05000333/1980011

Text

4

Y%

O

c,J

Nop

UNITED STATES

NUCLEAR REGULATORY COMMiss!ON

-'

g*

g

j

REClON I

g

631 PARK AVENUE

KING OF PRUSSI A, PENNSYLVANI A 19406

~~

m wm

Docket No. 50-333

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. R. J. Pasternak

.

Resident Manager

'

P. O. Box 41

Lycoming, New York 13093

Gentlemen:

Subject:

Inspection No. 50-333/80-11

)

This refers to the routine inspection conducted by Mr. R. A. McBrearty of this

office on June 23-27, 1980 at the James A. FitzPatrick Nuclear Power Plant,

Scriba, New York of activities authorized by NRC License No. DPR-59 and to the

discussions of our findings held by Mr. McBrearty with Mr. R. J. Pasternack at the

'

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

j

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) ~believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

i

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

l

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

i

this regard within the specified period, the report will be placed in the Pub?ic

Document Room.

4

&D30030 N

_-

_

__

.

.

Power Authority of the State

of New York

2

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

1

\\ Yl\\

l

Robert T. Carls

ef

,

'

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-333/80-11

cc w/ encl:

George T. Berry, President and Chief Operating Officer

J. P. Bayne, Senior Vice President-Nuclear Generation

A. Klausmann, Director, Quality Assurance

M. C. Cosgrove, Site Quality Assurance Engineer

J. F. Davis, Chairman, Safety Review Committee

C. M. Pratt, Assistant General Counsel

'

G. M. Wilverding, Manager-Nuclear Licensing

y

,,