7 /O
a atow
o
UNITED STATES
j * ", s g ,i
NUCLEAR REGULATORY COMMISSION
k [ d'
[
611 RYAN PLAZA DRIVE. SUITE 1000
-
c
REGION IV
% . . .' [. ,o#
S,
ARLINGTON, TEXAS 76012
August 19, 1980
In Reply Refer To:
bocket No. 50-285/80-12
Omaha Public Power District
ATTN:
Mr. W. C. Jones, Division Manager -
Production Operations
1623 Harney Street
Omaha, Nebraska
68102
Gentlemen:
This refers to the inspection conducted by Messrs. J. P. Jaudon and L. A.
Yandell of this office during the period of July 28-31, 1980, of activities
authorized by NRC Operating License DPR-40, and to the discussion of the
findings with members of your staff at the conclusion of the inspection.
Principal areas examined during the inspection were the licensee's:
(1)
organizational structu
nd the qualifications /expcrience of personnel in
key management positions and (2) 1.ne calibration program for safety-related
instrument systems.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspectors.
1
'
During this inspection, members of the Region IV staff and a representative
of NRR's Division of Project Management met with you and your staff on July 31,
1980. The purpose of this meeting was to discuss the region's first annual
evaluation of OPPD activities at the Fort Calhoun Station.
This evaluation was
made in accordance with the requirements of Task I.B.2 of the "5RC Action Plan
Developed as a Result of the TMI-2 Accident" (NU.2G 0660) and the NRC's program
entitled the Systematic Assessment of Licensee Performance (SALP).
The results
of the evaluation are documented in enclosure 2 to this letter.
There will
be no further changes in the scope or frequency of our inspection activities
at the Fort Calhoun Station as a result of this evaluation.
Within the scope of this inspection, no items of noncompliance were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document Room.
8010010 Of
-
-
.
'
.
Omaha Public Power District
-2-
August 19, 1980
If this report contains any information that you or your contractors believe
to be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure.
Any such application must include a full statement of the
reasons for which it is claimed that the information identified in the
application is contained in a separate part of the document.
If we do
not hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
Should you have any questions concerning this. inspection, we will be pleased
to discuss them with you.
Sincerely,
b 'WG $&v"
G. L. Madsen, Chief,
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
IE Inspection Report No. 50-285/80-12
2.
Performance Evaluation, July 1980
cc w/ enclosures: