ML19337A760

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-498/80-20 & 50-499/80-20 on 800728-29.No Noncompliance Noted
ML19337A760
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/18/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19337A761 List:
References
NUDOCS 8009300098
Download: ML19337A760 (2)


See also: IR 05000498/1980020

Text

--

7 L <~ '

%sa rtog*,o

30

UNITED STATES

y

,g

y y y eq , g

NUCLEAR REGULATORY COMMISSION

G l' s '~s/

E

REGION IV

3, ' 0

[

611 RYAN ?LAZA DRIVE, SulTE 1000

%, ' '.,#

,#

AR LINGToN, TEXAS 76012

  • . ..

'

In Reply Refer To:

RIV

'.

D:cket No. 50-498/Rpt. 80-20

50-499/Rpt. 80-20

Houston Lighting and Power Company

ATTN: Mr. G. W. Oprea, Jr.

Executive Vice President

Post Office Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Mr. D. P. Tomlinson of our staff

during the period July 28-29, 1980, of activities authorized by NRC Construc-

tion Permits No. CPPR-128 and 129 for the South Texas Project, Units No. I and

2, and to the discussion of our findings with Mr. L. D. Wilson and other members

)

of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of the inspection, one item of noncompliance was reviewed.

This item was identified through your internal audit program, properly

reported, and corrected in a timely manner as discussed in the attached

report. Consequently no additional information regarding this item of

noncompliance is needed at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

-

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public~ disclosure. The application must include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do cot hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

8009300GMg4

.- _

'

,

l

Houston Lighting and Power

2

August 18, 1980

Company

Should you have any questions concerning this inspection we will be pleased

to discuss them with you.

Sincerely,

k

r-

&

W. ': . Sei lk, Chief

Reactor Co struction and

Engineering Support. Branch

Enclosure:

IE Inspection Report No. 50-498/80-20

50-499/80-20

-

..

_ . _

_

.-