ML19337A760
| ML19337A760 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/18/1980 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Oprea G HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML19337A761 | List: |
| References | |
| NUDOCS 8009300098 | |
| Download: ML19337A760 (2) | |
See also: IR 05000498/1980020
Text
--
7 L <~ '
%sa rtog*,o
30
UNITED STATES
y
,g
y y y eq , g
NUCLEAR REGULATORY COMMISSION
G l' s '~s/
E
REGION IV
3, ' 0
[
611 RYAN ?LAZA DRIVE, SulTE 1000
%, ' '.,#
,#
- . ..
'
In Reply Refer To:
RIV
'.
D:cket No. 50-498/Rpt. 80-20
50-499/Rpt. 80-20
Houston Lighting and Power Company
ATTN: Mr. G. W. Oprea, Jr.
Executive Vice President
Post Office Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Mr. D. P. Tomlinson of our staff
during the period July 28-29, 1980, of activities authorized by NRC Construc-
tion Permits No. CPPR-128 and 129 for the South Texas Project, Units No. I and
2, and to the discussion of our findings with Mr. L. D. Wilson and other members
)
of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of the inspection, one item of noncompliance was reviewed.
This item was identified through your internal audit program, properly
reported, and corrected in a timely manner as discussed in the attached
report. Consequently no additional information regarding this item of
noncompliance is needed at this time.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
-
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public~ disclosure. The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do cot hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
8009300GMg4
.- _
'
,
l
Houston Lighting and Power
2
August 18, 1980
Company
Should you have any questions concerning this inspection we will be pleased
to discuss them with you.
Sincerely,
k
r-
&
W. ': . Sei lk, Chief
Reactor Co struction and
Engineering Support. Branch
Enclosure:
IE Inspection Report No. 50-498/80-20
50-499/80-20
-
..
_ . _
_
.-