Forwards Response to NRC Re Violation Noted in IE Insp Repts 50-259/80-24,50-260/80-18 & 50-296/80-19. Corrective Actions:Outdated Surveillance Instruction Sheets Replaced W/Current Revisions
ML19337A748
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/19/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19337A747 List:
References
NUDOCS 8009300067
Download: ML19337A748 (2)


Text

- - - _ -. _ - - _ _ _ _ _ _ - _

o' TENNESSEE VALLEY AUTHORITY 8 CHATTANOOGA. TEN #ES$EE 374ot 1

400 Chestnut St M t,Tbwer'II 5

3 AUS2@@ 19', $1$8g 3 i

Mr. James P. O'Reilly, Director.

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Enclosed is our response to R. C. Lewis' July 24, 1980, letter, RII:RFS 50-259/80-24, -260/80-18, and -296/80-19, concerning activities at Browns Ferry Nuclear Plant which appeared to be in i

noncompliance with NRC requirements.

We have reviewed the abeve inspection report and find no proprietary information in it.

If you have any questions, please call Jim Domer at FTS 857-2014.

Very truly yours, TENNESSE VALLEY AUTHORITY L. M. Mills, Ma ager Nuclear Regulatioh and Safety Enclosure l

8009300 An Equal Opportunity Employer

+

l

ENCLOJURE e

RESPONSE TO R. C. LEWIS' LETTER TO H. G. PARRIS DATED JULY 24, 1980

.)

BROWNS FERRY NUCLEAR PLANT (50-259/80-24, -260/80-18, -296/80-19)

Appendix A of the referenced letter identified activities which were apparencly in noncompliance with NRC requirements.

The following are those activities and our response.

Infraction As required by technical'apecification 6.3.A, detailed written procedures shall be prepared, approv,ed, and adhered to for surveillance and testing requirements.

Contrary to the above, on May 6,1980, units 1,. 2, and 3

. control room operators were performing surveillance instruction 2 instrument checks and observations, using a section which had been superseded by an approved revision dated July 10, 1979.

Response

Corrective Steps Taken and Results Achieved The outdated surveillance instruction data sheets were promptly removed from the control room files and replaced with current revisions. Additionally, the responsibility for upkeep of the surveillance instruction data sheet file has been assigned to specific individuals that are more experienced in filing procedures.

, Corrective Steps Which Will Be Taken To Avoid Further Noncompliance An experienced clerk will be assigned regularly to audit the surveillance datasheetfilesandmainh.aintheinventoryofcurrentdatasheetsas required.

The Date Full Compliance Will Be Achieved Full compliance was achieved by May 30, 1980, in that the files had been audited and updated. Maintenance of the file is a continuous effort as l-outlined in plant procedures.