ML19337A737

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/80-16 & 50-417/80-11 on 800715-18 & Notice of Violation
ML19337A737
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 08/05/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19337A735 List:
References
NUDOCS 8009300031
Download: ML19337A737 (2)


See also: IR 05000416/1980016

Text

--,:

a

-.u-

-an

a

+

--am.~

a

.-- ,~

,..

.,.

't

g

.#

o

UNITED STATES

>

w

-

8"

^

NUCLEAR REGULATORY COMMISSION

'

n

$

I

REGION 11

r#

101 MARIETTA ST

N.W., SulTE 3100

ATLANTA, GEORGIA 30303

AUG - 51980

.

In Reply Refer To:

RII:BRC

i

50-416/80-16

-

j

50-417/80-11

Mississippi Power and Light Company

.

,

ATTN:

N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

a

This refers to tbc inspection conducted by B. R. Crowley of this office on July 15

through 18, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-118

and CPPR-119 for the Grand Gulf facility, and to the discussion of our findings

held with G. B. Rogers at the conclusion of the inspection.

.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

,

!

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

j

unresolved items. The status of these items is discussed in the enclosed report.

I

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and referecces

j

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

,

2.201 of the NRC's " Rules, of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office, within 20 days of

)

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Ptrt 2, Title

10,- Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, i.t is

necessary that you make a written application t.

u 'n 20 days to this office to

withhold such infonnation from public disclosu'

iny such application must

4

include a full statement of the reasons on the basi, of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

.

nation identified in the application is contained in a separate part of the

,

i

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

l

8009300 031

!

,

- _.

-

.

,

-

-

_._.. _.-

.

- __ _ , ,

.-

,

,

4

.

...e

Mississippi Power and Light Company

--2-

ggG

519E3

.

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

,

Sincerely,

.

s

.

.

C. E. Murphy,' Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-416/80-16

and 50-417/80-11

i

_

!

cc w/ encl:

C. K. McCoy, Plant Manager

.

1

f

l

)

.

9

,

y

a

+4A-+~..#%-

.or.m.-+

eo eae-%e

->--wm-

.-- -

--.. -

v

-

- - - - - = ' - - ~ *

  • --