ML19337A527
| ML19337A527 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 08/19/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19337A528 | List: |
| References | |
| NUDOCS 8009290188 | |
| Download: ML19337A527 (2) | |
See also: IR 05000454/1980014
Text
\\
4
UN.TED STATES
[
g
NUCLEAR REGULATORY COMMISSION
TIQ
j
g
, , , ,
g
REGION lli
m
~r
'99 ROoSEVEL7 ROAD
<
o
GLEN ELLYN, ILLINOIS 60137
. . . . . ' '
e
SUG 1 9' 080'
i
Docket No. 50-454
Docket No. 50-455
i
Commonwealth Edison Company
l
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by Messrs. C. E. Jones and
C. M. Erb of this office on July 28 and 29, 1980, of activities at Byron
Nuclear Power Plant, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-130 and No. CPPR-131 and to the discucsion of our findings with
Mr. G. Sorensen and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
Within these areas, the inspection consisted of
during the inspe.ction.
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
If this report contains information that you
Room, except as follows.
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in an enclosure to the
application.
8 0 0 9 2-9 0ls
g
J
__
_
-_
_ _ _ -
--
.
Commonwealth Edison Company
-2-
g 1 9 G60;
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Reports No. 50-454/80-14
and No. 50-455/80-13
,
cc w/ encl:
Mr. J. S. Abel, Director
of Nuclear Licensing
Gunner Sorensen, Site
Project Superintendent
Central Files
l
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
Myron M. Cherry, Chicago
1