Forwards IE Insp Rept 50-346/80-22 on 800722-24.No Noncompliance Noted
ML19337A489
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/19/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19337A490 List:
References
TAC-40076, NUDOCS 8009290097
Download: ML19337A489 (2)


See also: IR 05000346/1980022

Text

I

~

7/C

fnm

,

gj

jo,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

,

e

o

$

E

REGION lll

q

-

b[

9

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

% . .U

o

...

AUG 19 1980

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President - Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. I. T. Yin of this office

on July 22-24, 1980, at Bechtel Power Corporation in Gaithersburg,

Maryland, on July 13, 1980, at Davis-Besse Nuclear Power Station, and

at your corporate office on August 1,1980, authorized by NRC License

No. NPF-3 and to the discussion of our findings with Mr. C. R. Domeck

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items cf noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the en-

closed inspection report will be placed in the NRC's Public Document Room,

except as follows.

If this report contains information that you or your

contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclorure to the application.

!

!

8009200 897

,.

SOO I O LW)

2-

Toledo Edison Company

-

,

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

G. Fiore111, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-346/80-22

cc w/ enc 1:

Mr. T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, Rill

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State

of Ohio

!

i

--,,4.-

..s-

2

-

-

,,-