| ML19337A462 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/19/1980 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML19337A463 | List: |
| References | |
| NUDOCS 8009290017 | |
| Download: ML19337A462 (2) | |
See also: IR 05000266/1980013
Text
(
. _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
_
_
l
T/C
n
i
pf
UNITED STATES
d
NUCLEAR REGULATORY COMMISSION
o
$
.E
REGION 111
4
d'['
799 ROOSEVELT ROAD
g
GLEN ELLYN, ILLINOIS 60137
%
AUG 191980
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan Avenue
Milwaukee, WI 53201
Gentlemen:
This refers to the routine inspection conducted by Mr. A. G. Januska of
this office on July 17 and 22, 1980, of activities at Point Beach Nuclear
Power Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-24
and No. DPR-27 and to the discussion of our findings with Mr. T. Slack at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. The inspection consisted of telephone discussions and the
closeout of results of Confirmatory Measurements Samples collected during
a previous inspection and of spiked samples submitted subsequent to the
inspection in which samples were collected.
No items of noncompliance with NRC requirements were identified during
the course of this in:pection.
In accordance with Secnion 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Fede:a1 Regulations, a copy of this letter and the en-
closed inspection report will be placed in the NRC's Public Document Room,
except as follows.
If this report contains information that you or your
contractors believe to be proprietary, you must apply in writing to this
office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. The application must include a
full statement of the reasons for which the information is considered
proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the
application.
i
l
80092900l7
Q
,_
_ _ __
. _ _ _
_
- _ _ _ _ - _
Wisconsin Electric Power
-2-
AUG 1 9 SB0
Company
We will gladly discuss any questions you have concerning this
inspection.
Sincer :1y,
lk
___
h&M
A. B. Davis, Chief
Fuel Facility and
Materials Safety Branch
Enclosure:
IE Inspection
Reports No. 50-266/80-13
and No. 50-301/80-13
cc w/ enc 1:
Mr. G. A. Reed, Manager
Central Files
Reproduction Unit NRC 20b
AE0D
Resident Inspector, RIII
Local PDF
Sandra A. Bast, Lakeshore
Citizens for Safe Energy
Mr. John J. Duffy, Chief
Boiler Intpector
i
l
l
l
l
i
_
<