OPERATING DATA REPORT DOCKET NO. 50-333 DATE JAFNPP COMPLETED BY R-71Twim TELEPilONE 315-34? 3840 OPERATING STATUS Notes
- 1. Unit Name:
Pi empn evi,+
- 2. Reporting Period:
800801 800891
- 3. Licensed Thermal Power (MWt):
2476
- 4. Nameplate Rating (Gross MWe):
RR3 5._ Design Electrical Rating (Net MWe):
891
- 6. Maximum Dependable Capacity (Gross MWe): 830
- 7. Maximum Dependable Capacity (Net MWe):
800
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:
NOIE
- 9. Power Level To Which Restricted,If Any (Net MWe):
MOW
- 10. Reasons For Restrictions,If Any:
This Month Yr. to-Date Cumulative i1. Ilours In Reporting Period 7hh RRRR hh6AR
- 12. Number Of flours Reactor Was Critical 494 9415.1 70065.1
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Ilours Generater On-Line 435 3328 29066
- 15. Unit Reserve Shutdown Hours 0
0
- 16. Gross Thermal Energy Generated (MW!!)
532200 6394224 _
0 57582418
- 17. Gross Electrical Energy Generated (MWII) 171470 21o0400 log 44100
- 18. Net Electrical Energy Generated (MWil) 1647Rn
?l181 Rn 1RonR72R
- 19. Unit Service Factor 68.6T 56.8%
69.0"
- 20. Unit Availability Factor 58.5%
56.8%
65.0%
- 21. Unit Capacity Factor (Using MDC Net) 27.7%
45.2%
57.7%
- 22. Unit Capacity Factor (Using DER Net) -
27.0%
44.1%
51.5%
- 23. Unit Forced Outage Rate 0%
4.8%
19.5%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
Schev3uled snubber insnection and maintenance cutam in January. 1981.
f'or anoroximately 10 days.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIA L OPERATION 8 009 0 9 03OD 9
g==-e./
-y-a
-+.MU,_.
~-
..essereeww we -
mt
D
..+
AVERAGE DAILY UNIT POWER LEVEL.
4fC yp
~
DOCKET NO.
50-337 UNIT
.TA MF__P DATE W M 1480 COMPLETED BY E. ZUF2LT TELEPilONE 315_3hp_3Ah0
. August, 1980 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 283 2
0 18 397 3
0 19 979 4
0 20 292
~5 0
21 400 6
0 22 460 7
n 23 hh6 8
0 24 449
_, 0 25 441 10 0
26 496 11 96 433 27 12
'O 28 h30 29 528 13 0
103 591 14 3o
.I5 169 31 560 16 295
'SUR1ARY: ' Unit was returned to service at 1700 on September 11, 1980 following the thini refueling outage. 'Ihe unit was renoved from service at 2200 for scram testing and turbine overspeed testing wb-: <4 lasted for 52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br />. Unit was returned to nervice or deptember ~14,1980.
4 E e p
e d
d
.e =j.x 'gjj y;. 3,i-w;;pg7 7
... :. w
.. &.._c. m
..m_.
. _ c
.u.a= _
- w. -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-333 UNIT NAME JAMIPP DATE SFT'P. 1080 COMPLETED BY F ' NW REPORT MONTli ATTGTIS'P TELEPIIONE
?75-?h9-?Qho i
r.
.! E 3
.Eh Licensee
,E v.
Cause & Corrective -
N.
D.it e g
3g g
,g g 5 Event 3?
S3 Action to o
5 5; =g Report
!O Prevent Recurrence l
-$2 5
u e
o 14' 800507 S
2'37 c
4 NA RC Fuel XX Refueling Outage (Cumulative Hours 2309)
I.
15 800811 S
52 H
2 NA NA NA Scram Test and Turbine Test Per-NRC Bulletin 80-17 i
E-I
- s I
' ^
l 2
3 4
..q -
F: Forced Reason:
Method:
Exhibit G - Inst ructions C' ' ;,
S: Scheduled A Equiprnent Failure (Esplain)
I Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee t..
C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-
- 1 D Regulatory Restriction 4-Other (Explain) 0161)
~.V E-Operator Training & License Examination F-Administrative 5
,"~[..
G-Operational Ea ror (Explain)
Exhibit 1 - Same Source 1
Il-Other (Explain) 7.f [ c!
.uau
..xy.
-s.-
=.
~
+
1
~
4 m
4
~
POWER'AUIHORITY OF TIE STATE OF NEW YORK
-JAMES Ai FITZPATRICK NUCIEAR' POWER PLANT NARRATIVE SUlHARI OF OPERATING' EXPERIENCE TAUGUST, 1980
.The refueling outage was completed on August 11,-1980'and the unit was. returned.to service at approximately 1700 hon"s, oat'.2200
. hours, the unit was _taken off line for scram testing and turbine overspeed testing.
Upon ecmpletion of the test, the unit:was placed on line at 0130
' hours on-August-14,11980.-
At the end.of the reporting period the unit is cperating at approxhnately -
~~
570 Mde and increasing power.at the preconditioning rate.
E L
)
r s
w+.r g
afge
$ e Mt.-
- i r
?, y.
,.. s., v> +p fw V 're -
. 7$. [, ;
- _ YM('.9ff;[-k$3Y5 -hN[Tb n,. ' :.z.:a.;.dGJp-rf nu.maxce.,gn.ns t -
Vu'
. :ac..; - r g
L. 7.
2:
. r *7;;' - A.G 2 &..Q: ~4;.L?N;2.3,w ;,w,;
y*
-??f:jn 1"Ws?Q W l.l7! 1-3
,~
.e.^.,._Q& n ~ ',.
..: y f;, 5f 4
-?:.
>..x
, ~.. -, + _
<., ~s e 4
,e, e-5.
cee n e Q g w'.no y z<-.,.
-m.
, y ;.
u m
% A C 451.w & aNA M g4kir.Q M E.JJ G mb M Ets
,l. Q A;;.,Jaks A.M M M L
. i ; ~m46 :'
' ' ~
'"2 53 h
& L'2
~
~
.._L
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE
SUMMARY
ST DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME HOURS 30 July 23 8055 Ops Broken electrical terminal Replaced coruector 1
MOV-16 connector in control room panel resulted in loss of position indication.
26 July 71 7285 Ops Breaker housing out of Adjusted housing and breaker to allow 10 Breaker 10630 adjustment.
proper breaker insertion.
l 25 July 15 5227 Visual NRC Bulletin 79-02 Modified H15-168 143 H15-168 Inspection.
28 July' 70 5896 Visual NRC Bulletin 79-02 Modified BFSK 548 124 1/4 BFSK 548 Inspection.
26 July 10 5743 Visual Leakage Repacked MOV-66A 73 MOV-66A 30 July 03 3608 Ops /PM's Preventive Maintenance /
CRD changeouts 4866 CRD Mechanismo SIL-139 29' July 10 7033 Ops Leakage Repaired P-3C 24 P-3C j
29 July 10 7991 Ops Auxiliary contact binding Loosened aux. contact and replaced 80 p
MOV-25A pitted main contacts.
! 20 July 10 6618 Ops Val've pressure seal leak Fixed valve leak, rebuilt valve notor 200
{
MOV-18 over a period of time operator arrl replaced motor.
caused motor failure.
i-l 31~ July 02 6551 Visual None. Solenoid Valves sent None.
18 SOV-71A-L to valve vendor for special inspection.
~
l i
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT
' SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
ST DATE-SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
28.Jul3 02 4770 Environmental None Replaced solenoids 6
AOV-17 & 18 Qualification 28 July 03 7910 Ops Ieaking valve packing Replaced valve 2
HCU 30-23 28 Ju13 03 7823 Ops Leaking cylinder ' piston Replaced cylinder 6
HCU 30-23 28 July 03 7913 Ops Icaking valve packing Replaced valve 2
HCU 42-11 28 July 03 7708 Ops leaking cylinder piston Replaced cylinder 4
HCU 38-47 28 Jul3 10 7802 ST System flow low due to Removed R105A orfice 3
Flow Orfice fouling for FT 97A
& FI 132A 28 July 10 7389 Visual Icaking fitting Disassembled fittings, cleaned, 6
P-3C reassembled 25 July 15 7736 Visual Bent pipe nipple - hitting Cut off nipple arrl plugged 28 Supply to penetration when pipe e
A&C EDG moved.
1
[!26 July 10 8040 Ops Line plugged Cycled valves-flushed out line 1/2 Service Water High Point Vent i
o 1
s a.
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
WORK RE ST #
DATE SYSTEM HOW DETECTED CAU0E OF MALFUNCTION ACTION TAKEN TO PRECLUDE ' RECURRENCE T ME HOURS u Aug 93 8052 Ops Shorted light balb Replaced bulb 4
EDG-D-31 July 71 3038 Ops cracked battery cell Replaced battery cell 6
SB-2 resulted in snnll electrolyte leakage 31 July 39 6820 LLRT Seat leakage Cleaned and lapped seat 78 1/2 IAS-513 L Aug 23 6598 LLRT Seat leakage Repaired HPI-65 684 HPI-65 30 July 23 4467 ISI Surface indications on Removed indications and reinspected 405 HPI-12 welds satisfactory 31 July 10 7775 LLRT Excess leakage Disassembled, cleaned and lapped 190 FDV 26A &
RHR-52 31 July 10 6817 LLRT Seat leakage Repaired MOV-38B 162 MOV-3M 31 July 10 7776 LLRT Seat leakage Repaired MOV-31A 250 1/4 MOV-31A 30 July 15 5904 Visual NRC Bulletin 79-02 Modified H15-145 165 H15-145 Inspection 4 Aug 10 5908 Visual NRC Bulletin 79-02 Modified H10-173 419 3/4 H10-173 Inspection
. g 'J
+L e
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
0 T
DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME ET HOURS 4 Aug 15 5903 Visual NRC Bulletin 79-02 bbdified H15-148 317.1/2 H15-148 Inspection 4 Aug 76 5233 Visual NRC Bulletin 79-02 Modified H76-30 216 1/2 H76-30 Inspection 4 Aug 15 5226 Visual NRC Bulletin 79-02 Modified H15-194 231 1/4 H15-194 Inspection 4 Aug 10 5197 Visual NRC Bulletin 79-02 Modified H10-498 458 H10-498 Inspection 5 Aug 10 8090 Visual Leaking flange Tightened flange 39 P-3C 5 Aug 10 8091 Visual Packing replacement Tightened packing 18
(
NOV-27A
.f 5 Aug 11 7729 Ops Icose screw in switch Tightened screws 8
- llA-S1
[
6 Aug 11 5397 N/A N/A Performed F-ST-6E - Explosive valve 5
EV-14 A & B testing i
7 Aug 66 8113 Ops Switch actuating arm out Adjusted Actuating Arm 4
i AOV-100A of adjustment
}
p;.
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT
- SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE
SUMMARY
S DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME 3 Aug 03 3607 Ops Preventive Maintenance; Isak test spare CRD's, rebuild CRD's CRD Corrosion products in which were replaced valves which were replaced 3 Aug 11 5444 S.T.
N/A Provided mechanical support for 15 EV-14 A & B F-ST-6D 5 Aug 11 5397 S.T.
N/A Provided mechanical support in 5
EV-14 A & B conjunction with WREQ'd 5444 & 5397-(Recorded above) 5 Aug 27 6993 Ops Broken diaphragns -
Replaced diaphragns 18 27P-llB Cyclic fatigue 4 Aug 29 8098 Visual Improperly packed Repacked 4
AOV-80B 3 Aug 01-125 5461 S.T.
Dirty filter Replaced filter 3
F-2A 3 Aug-01-125 8120 S.T.
Dirty filter Replaced filter 8
F-1B 7 Aug 00 4785 N/A Open for maintenance Closed and torqued door 2
W. Crescent tt torus door
[
3 Aug 03 4808 Maintenance Leaking cylinder piston Rebuilt cylinder 2
A5330 Records I
+
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR PO'#ER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DATE SYSTEM 6
HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
8 Aug 15 5225 Visual NRC Bulletin 79-02 Modified PFSK 812
_180 1/4 PFSK 812 Inspection 8 Aug.
27 6550 N/A NRC required nodifica-Modified per F1-80-31 404
.OV-111 thru 11 i
tion 8 Aug
-02 8095 Ops Flange leaks Replaced gaskets between pilot base 184 RV-71 E & K and main base 7 Aug 10 8094 Ops Packing leak Tightened packing 36 m m-88 7 Aug 10 7908 Ops Inaking by seat Repaired RHR-42B 378 3/4 m m-42B 8 Aug 23 8093 Ops Seal leak Repaired NV-15 696 MOV-15 11 Aug 02 4408 Ops Seal leak Repaired MOV-43A 200 NOV-43A 12 Aug 27 7420 Ops Midadjustment of valve Adjusted switch 2
MOV-113 operator geared limit switch gave false position indication i
12 Aug 10 8044 Ops Failed position switch-Replaced switch 6
l FCV-69a plunger stuck k
i t
h I
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 MECHANIC,AL MAINTENANCE
SUMMARY
e-DATE-SYSTEM ST HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME HOURS 13 Aug 71 7473 Ops Failed inverter AC Replaced PC logic cord 3
IIN-3B voltage / current logic PC board tripped inverter 13 Aug 23 7471 Ops Improper adjustment of Adjusted handle 2
MOV-57 molded case breaker external operating 3
handle 13 Aug 93
__ 2289 Maintenance Split in cable outer Repaired cable split I
lEDGDBX012 jacked. No electrical malfunction resulted 13 Aug 10 7465 Ops Misadjusted open positior Aljusted position switch 2
' ' t RHR-81A indication on manual valve I
6 Aug 71 5780 Maintenance Sheared bolts on elec-Drilled and tapped for new bolts.
15 JBI-X100G trical penetration box Replaced 6asket.
cover j
11 Aug 66 5907 Visual NRC Bulletin 79-02 Modified H66-6 66 1/2 Ho6-0 Inspection 1
12 Aug 15 5238 Visual NRC Bulletin 79-02 Modified PFSK 811 329 1/2
. f.
PFSK 811 Inspection
- i-12 Aug 10 5913 Visual NRC Bulletin 79-02 Modified H10-700 34 i
H10-70C Inspection
{
t1 12 Aug 15 5215 Visual NRC Bulletin 79-02 Modified H15-105 47
[
H15-105 Inspection
-l
,t i
l
[
y j
i
.w
POVER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE
SUMMARY
DATE SYSTEM S
HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME HOURS 12 Aug 10 5161 Visual IEC Bulletin 79-02 Modified H10-455 302 V2 H10-455 Inspection 14 Aug 10 5927 Visual 1HC Bulletin 79-02 Modified H10-243 80 1/1 H10-243 Inspection 14 Aug 10 5926 Visual IEC Bulletin 79-02 Modified H10-487 4
H10-487 Inspection 14 Aug 76 5201 Visual IEC Bulletin 79-02 Modified H76-33 418 V2 H76-33 Inspection 14 Aug 15 5922 Visual IEC Bulletin 79-02 Ibdified H15-88 36 H15-88 Inspection 14 Aug 10 5902 Visual Imc Bulletin 79-02 Mxlified H10-547 329 1/2 H10-547 Inspection 14 Aug 10 5187 Visual IEC Bulletin 79-02 1bdified H10-499 528 V2 H10-499 Inspection 14 Aug 10 5169 Visual lEC Bulletin 79-02 Modified H10-454 161 V2 H10-454 Inspection i
15 Aug 10 5245 Visual 18C Bulletin 79-02 Modified detail A 97 V2 Detail A Inspection 18 Aug 99 4806 Visual Open for mintenance Closed and torqued door 5
Joor to E Cres-3ent to torus mm A
?
POWER AUTHORITY OF THE STATE OF NEW YORK
[
JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE
SUMMARY
DATE SYSTEM S
HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
18 Aug 03 7483 Visual Kicked g;1ge glass while Replaced glass 1
Scram Inst taking sample Volume 18 Aug 17 7274 Ops Worn belt Replaced belt 4
Rx Bldg Vent Monitor 19 Aug 23 7998 Ops Misadjustment of swtich Adjusted position switch for proper 3
AOV-42 actuating lever valve position in11 cation 18 Aug 03 6242 Ops Failed reed switches in Replaced reed switches and tested 40 PI Probes control rod position indication probes.
l t
a h
i
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
TPP ATTaf TCP 1OQO WORK REQUEST #
CAUSE OF RESULIS OF (T
-lDATE SYSTEM HOW DETECTED COMPONENT #
MALFUNCTION MALFUNCTION E U TIME RECURRENCE HOURS 81.47 Inaccurate Calibrate Timer 8/8/80 02 2E-K5 A & B Ons finJmom Th nit par f'n-9m_9on
?
7421 Logic Board Unable to Perfom Replace Group 8/8/80 02 RSCS Oos Failure Grotm Notch Test Memorv Card 2
7113 Replace Switch 8/10/80 02 PS-12dA I&C Faulty Switch Drifting Perfom ISP 5-1 2
Incorrect Rod l8/3/80 3863 Position Checked R.P. with i
03 PI-06-31 Ops Unknown Indication GE Test Fixcure 2
I 8151 Incorrect Perfom Step 5.4.5 8/26/80 03 PS-230 Ops Unkrxwin Set Point Of IMP 3 3 6
.l 7941 Incorrect Perfom (8/29/80 03 HCU 46-19 Ops Unknown Set Point IMP 3 5 4
42 MSIV Required g$r 1Mles[
kgustgi 8/5/80 05 IE-7 Ops Level Switch m
9930 Perrom 8/6/80 07 IRM
'A' Ops CPA Changeout Spurious Trips F-ISP-71 5
8107 Perfom 8/6/80 07 IB1
'A' Ops Unknown Erratic Response F-ISP-71 5
i 7432 IRM Replace Cable j
8/12/80 07 IRM A,B,H Ons Connector Failure Pailure Connector SP 7433 Drive Mechanism 8/12/80 07 IBi
'D' Ops Gear Box Failure IRM D Inop Replace Gear Box 8
POWER AUTHORITY OF THE STATE OF NEW YORK h
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
I&C AUGUST, 1980 WORK REQUEST #
CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM HOW OETECTED COVPONENT #
MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS Replace Motor 7943 Inoperable Pens 8/28/80 07 RR-45 Ops Normal Wear /Use Reconler 3
me We k Batteries-Replace Battery U28 in Meter Incormet Check Wlring 7/19/80 12-TS-139 A,C,D,E,F Ops 0
g3,3,, %M am Tndication nor F1
'Q 91 8115 Perfo m 4 8/6/80 16 ops Icak Pressure Failure IP-ST-39R 1
v_1 nun 7829 Incormet Calibrate as 8/6/80 17 M-251 Rad. Protection Unknown Indication per ISP-64-1 10 7830 Incorrect Calibrate as 8/6/80 17 A-RE-130 Rad. Protection Unknown Indication per ISP-19 12 7831 Incorrect Calibrate as
'8/6/80 17 B-RE-130 Rad. Protection Unknown Indication oer ISP-19 20 7503 calibrate as 8/20/80 17 M-150B Ops Jnknown Unstable per ISP-19 5
Replace Count 7534 Downscale Rate Card and
- '8/29/80 17 m-431 Ops 31rcuit Board Indication calibmte Monitor 40 l
I:
7535 Incorrect Replace Detector A /?? /An 17 w_h5An Mtoctor Faihire Tndicator Perf'orm ISP-26 6
7934 3roken Pen Recorder Replace Drive
- 8/6/80 17 RR-51 ops Jable Failure Mble and Calib.
5 7517 Drywell Equipm2nt Perform
,8/21/80 20 FQ-530 Ops Jnknown Drain Runs Constant ISP-15 4
o k.
. _ =
POWER AUTHORITY OF THE STATE OF NEW YORK i..
JAMES A. FITZPATRICK NUCLEAR POWER PLANT I
MAINTENANCE
SUMMARY
T&C AUGUST, 1980 REPAIR (TIO WORK REOUEST #
DATE SYSTEM HOW DETECTED CAUSE OF RESULTS OF.
COMPONENT #
MALFUNCTION MALFUNCTION RECURRENCE HOURS 6991 Drifts frcan Calibrate as 8/6/80 23 LT-201C Ops Unknwn Setpoints per ISP-29-2 14 4
5663 Temperature HPCI Steam Leak Replace / Test.
,8/9/80 23-TS-117A & 113 Tech. Services Switch Iogic Failure TS-113 8
7945 Improper Calibrate 27 TD-101C Ops RTD Seat Indication-Reseat RTD 6
i 8/18/80 8135 Inoperable Cleaned 8/6/80 39 Ck Valves B-SRV Ops Unknown Valves Tested 10
(
a 5
l
-)
b e