Forwards IE Insp Repts 50-553/80-10 & 50-554/80-09 on 800623-27.No Noncompliance Noted
ML19337A202
Person / Time
Site: Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 07/21/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19337A204 List:
References
NUDOCS 8009090253
Download: ML19337A202 (2)


See also: IR 05000553/1980010

Text

n

I

7/CL

  1. .# %'o,%

.

UNITEJ STATES

i

8

NUCLEAR RECULATCRY COMMISSION

8

I

REGION 11

101 MARIETTA ST

N.W., SUITE 3100

)

0,%

6

-

ATLANTA, GEORGIA 3o303

JUL 211980

In Reply Refer To-

R

RWW

0-553/80-10

50-554/80-09

1

a

-

Tennessee Valley Authority

ATIN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

t

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by R. W. Wright of this office on June 23

through 27, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-162

and CPPR-163 for the Phipps Bend facility, and to the discussion of our findings

held with G. W. Wadewitz at the conclusion of the inspectica.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported unre-

solved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within '20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

.

300909025 3

. . _ _ . _ _

_

':

(-

- o-

_

hh 21 g33

Tennessee-Valley Authority

-2-

..

1

,.

.

' Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,,

C. E. Murphy, Chief

Reactor Construction and Engineering.

Support Branch

Enclosure:

Inspection Report.Nos. 50-553/80-10

and 50-554/80-09

cc w/ encl:

W. P. Kelleghan, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff 1

.

.

t

1

~

.

.

9