Forwards IE Insp Repts 50-352/80-04 & 50-353/80-04 on 800319-21 & 0402-04.No Noncompliance Noted
ML19337A188
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/10/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19337A186 List:
References
NUDOCS 8009090229
Download: ML19337A188 (2)


See also: IR 05000352/1980004

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

e. 4 ',

T -M

-

p[

%

UNITED STATES

N1

NUCLEAR REGULATORY COMMisslON

y

(g

' ')

g

REGION I

O

I g

631 PARK AVENUE

KING OF PRUSSI A. PENN$YLVANI A 19406

.....

Docket Nos. 50-352

50-353

Philadelphia Electric Company

ATTN: Mr. John S. Kemper

Vice President

Engineering and Research

2301 Market Street

.

Philadelphia, PA 19101

Gentlemen:

Sub,iect:

Combined Inspection 50-352/80-04 and 50-353/80-04

This . refers to the inspection conducted by Mr. S. K. Chaudhary of this office on

March 19-21, 1980 and April 2-4, 1980 at the Limerick Generating Station, Limerick,

Pennsylvania of activities authorized by NRC License Nos. CPPR-106 and CPPR-107

and to the discussions of our findings held by Mr. Chaudhary with Mr. J. Corcoran

of your staff at the conclusion of the inspection, and to a subsequent telephone

discussion between Mr. J. Mattia and Mr. J. Corcoran on March 15, 1980.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

However, one activity appears to be a deviation from commitments described in

the Preliminary Safety Analysis Report for Limerick Generating Station Units 1

and 2.

This item involves the acceptance of D-Mixes of concrete on the basis of

different criteria than prescribed by ACI-318.

Details are in paragraph 5 of

sne enclosed Inspection Report.

Please provide this office a description of your plans for resolving this deviation,

including your schedule and measures as appropriate to prevent similar occurrences.

Your response is requested within 30 days of your receipt of this letter.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of. Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to be proprietary, it is necessary that

'

you make a written application within 20 days to this office to~ withhold such

800909022.@ '

.

.

-

-

-

?

g

.

.

,

,

.

Philadelphia Electric Company

2

information from public disclosure. Any such application must be accompanied by

an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Comission as listed in subparagraph (b) (4) of Section 2.790.

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

/

f

,

- _-

Robert T. Carlson, Chief

Reactor Construction and Engineering

Suppcrt Branch

Enclosure:

Office of Inspection and Enforcement Inspection Combined Inspection

Report Numbers 50-352/80-04 and 50-353/80-04

cc w/ enc 1:

V. S. Boyer, Senior Vice President, Nuclear Power

.