Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
e. 4 ',
T -M
-
p[
%
UNITED STATES
N1
NUCLEAR REGULATORY COMMisslON
y
(g
' ')
g
REGION I
O
I g
631 PARK AVENUE
KING OF PRUSSI A. PENN$YLVANI A 19406
.....
Docket Nos. 50-352
50-353
Philadelphia Electric Company
ATTN: Mr. John S. Kemper
Vice President
Engineering and Research
2301 Market Street
.
Philadelphia, PA 19101
Gentlemen:
Sub,iect:
Combined Inspection 50-352/80-04 and 50-353/80-04
This . refers to the inspection conducted by Mr. S. K. Chaudhary of this office on
March 19-21, 1980 and April 2-4, 1980 at the Limerick Generating Station, Limerick,
Pennsylvania of activities authorized by NRC License Nos. CPPR-106 and CPPR-107
and to the discussions of our findings held by Mr. Chaudhary with Mr. J. Corcoran
of your staff at the conclusion of the inspection, and to a subsequent telephone
discussion between Mr. J. Mattia and Mr. J. Corcoran on March 15, 1980.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
However, one activity appears to be a deviation from commitments described in
the Preliminary Safety Analysis Report for Limerick Generating Station Units 1
and 2.
This item involves the acceptance of D-Mixes of concrete on the basis of
different criteria than prescribed by ACI-318.
Details are in paragraph 5 of
sne enclosed Inspection Report.
Please provide this office a description of your plans for resolving this deviation,
including your schedule and measures as appropriate to prevent similar occurrences.
Your response is requested within 30 days of your receipt of this letter.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of. Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any information
that you (or your contractor) believe to be proprietary, it is necessary that
'
you make a written application within 20 days to this office to~ withhold such
800909022.@ '
.
.
-
-
-
?
g
.
.
,
,
.
Philadelphia Electric Company
2
information from public disclosure. Any such application must be accompanied by
an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Comission as listed in subparagraph (b) (4) of Section 2.790.
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
/
f
,
- - _-
Robert T. Carlson, Chief
Reactor Construction and Engineering
Suppcrt Branch
Enclosure:
Office of Inspection and Enforcement Inspection Combined Inspection
Report Numbers 50-352/80-04 and 50-353/80-04
cc w/ enc 1:
V. S. Boyer, Senior Vice President, Nuclear Power
.