Urges Expeditious Restarting of Facility.Cost of Buying Electricity by Util Is Being Passed on to Ratepayers
ML19337A149
Person / Time
Site: Crane 
Issue date: 08/15/1980
From: Itschner L
AFFILIATION NOT ASSIGNED
To:
NRC COMMISSION (OCM)
Shared Package
ML19337A148 List:
References
NUDOCS 8009090024
Download: ML19337A149 (1)


Text

/f

.,=.s Augtist 15,198C.

U. 3. ReZilartery Co=ission Washington, D. C. 20555 Gentlemen I an a resident of Florida and get ty electeicity frem Florida Fewer corporation. Inst Feburary the Florida Fewer Crystal Plant which was built by Babcock de Wilcox was shut down when pcwer falure resulted in the spill of 43,772 gallons of radio active water inside reactor centai:=ent building.

Since then there has been nodificatiens and re-fueling. New after $ montha The Crystal River Plant is now operating.

I just returned frca a visit to Eastern Pennsylsania where I have relatives and friends receiving their electricity fhra Metropolitan Idison Ccmpany. They cannot understand and neither can I why your Coc:nissien : dees not release the undamagtd Unit I at The Three Mile Island for :.arvice.

It is coating Met. :3.

untold millions of dollars to buy electricity to supply this area with electricity and the cost is passed en to the constners. This Unit I was supposed to go into service January lat,1980, then it was pushed up to May, now it is January 1,1981.

It is unfair to the consumers in this area to be draging your feet on this issue.

You released Florida Power Corporation Crystal River Flant after % months and it had a malfunction, and still there sits Med. Ed. Three Island thit I which has never had any operation trouble sitting idle. I can't understand your l v=M reasoning,

', f;g I am making an appeal. for my relative s and fri. ends in this area to review the situation and the date for starting Unit I.

i Sincerely,

'lA Y 90 0.

MA g..,

5725 - 12th Ave., N., Apt. 10hD St. Petersburg, Fla. 33710 8009090 024

,