ML19337A124
| ML19337A124 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 07/29/1980 |
| From: | Moody D YANKEE ATOMIC ELECTRIC CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-80-16, WYR-80-91, NUDOCS 8009080522 | |
| Download: ML19337A124 (2) | |
Text
,
fn Telephone 617 366-9011 Twx 710-390 0739 YANKEE ATOMIC ELECTRIC COMPANY a.a.1.1
- m.
WYR 80-91 pt,,j,
20 Turnpike Road Westborough, Massochusetts 01581
.Yeasixse July 29, 1980 United States Nuclear Regulatory Commission Office of In;pection and Enforcement Region I 63L Park Avenue King of Prussia, Pennsylvania 19406 Attention:
Mr. Boyce H. Grier, Director Office of Inspection and Enforcement
References:
(a) License No. DPR-3 (Docket No. 50-29)
(b) USNRC Letter to YAEC dated June 27, 1980
Dear Sir:
Subject:
Response to IE Bulletin 80 Rosemount Model 1151 and~1152 Pressure Transmitters We have determined that the subject pressure transmitters with output codes "A" or "D" are installed in safety related applications at Yankee Rowe.
However, we have also determined that these transmitters, or those that are planned for installation, would not be exposed to input pressures that could result in anomalous signals during normal operation, anticipated transients, or design accidents; therefore, no further action is necessary.
The following information is submitted in response to your request for estimates of manpower expended in the research and subsequent performance of actions associated with this letter / bulletin / document:
Manpower Requirements Hours i
Bulletin Response 80 Corrective Actions None required It should be clearly understood that this information is not adequate to enable a value/ impact assessment, the cost of equipment, the cost of additional resources to perform additional work, and cost of installation are also necessary.
In addition, an adequate determination of the safety improvement as a result of this document needs to be included.
6000080t;S4
l' r
Mr. Boyce H. Grier, Director Office of Inspection and Enforcement July 29, 1980 Page 2 If you have any questions or desire additional information, please contact us.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY 1
C D. E. Moody Manager of Operations JAK/ dis J
1 i
4 4
4 I
J
_, _ _ _.. _ - _