Ack Receipt of 800929 Interim Deficiency Rept Re Questionable Weld Filler Matl in Category I Piping
ML19336A682
Person / Time
Site: Marble Hill
Issue date: 10/08/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 8010300467
Download: ML19336A682 (1)


Text

. 'a r.: oc pf o,

UNITED STATES NUCLEAR REGULATORY COMMISSION e

3 y, o

f f{

>< E REGION lli 5,.

3 799 ROOSEVELT ROAD

/

0, g

b GLEN ELLYN,ILLINOls 60137 o

OCT B 1980 Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATTN:

Mr. S. W. Shields Senior Vice President Nuclear Division Post Office Box 190 New Washington, IN 47162 Gentlemen:

Thank you for your interim report dated -

-29, 1980, pursuant to 10 CFR 50.55(e) regarding questionable vcid filler material in Category 1 pipe. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely,

[ * < Mf r

G. Fiore11i, Chief Reactor Construction and Engineering Support Branch ec:

Mr. G. N. Brown, Proj ect Director C. Kammerer, CA Director, RCI/IE Director, AEOD Chief OEB/MPA IE Files cc w/1tr dtd 9/29/80:

Central Files PDR Local PDR NSIC LeBoeuf, Lamb, Leiby & MacRae Mr. Dave Martin, Office of Attorney General Mr. John R. Galloway, Staff Director, Environment, Energy and Natural Resources Subcommittee i

6 I

I i

)

\\

o(,10300yf7

b j

7/

.!. /

PUBLlC SERVICE INDIANA S. W. Shields Senior Vice President.

Nuclear Division September 29, 1980 Mr. James G. Keppler, Director Docket Nos.: STN 50-546 U. S. Nuclear Regulatory Commission STN 50-547 Region III Construction Permit Nos.:

799 Roosevelt Road CPPR - 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On March 28, 1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc., (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). This item was described in more detail in an interim report to your office dated April 25, 1980 (DSN 0425804002).

As discussed in the interim report, PSI has obtained an ASME interpretation of code requirements regarding Certified Material Test Reports (CKrR's).

The ASME confirmed that for the applicable edition of the Code, weld filler material used on the spool pieces in question could be furnished with only a Certificate of Compliance and a CMTR was not required. Other questions pertaining to these Certificates of Compliance require additional surveillance of vendor facilities and this surveillance is not yet complete. PSI anticipates this surveillance will be complete and the results available on or before December 15, 1980.

If you have any questions on this matter, please feel free to contact me.

Sincerely, W

pQ..c S. W. Shields TDG/cg cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Cor: mission Washington, D. C.

20555 E. R. Schweibinz, P. E.

J. J. Harrison 1

ll k 00IC 0hb f

o l

P.O. Box 190, New Washington, Indiana 47162 812. 293.4441 I