Forwards IE Insp Repts 50-259/80-30,50-260/80-23 & 50-296/80-24 on 800701-31.No Noncompliance Noted
ML19336A506
Person / Time
Site: Browns Ferry  
Issue date: 09/12/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19336A507 List:
References
NUDOCS 8010230479
Download: ML19336A506 (2)


See also: IR 05000259/1980030

Text

-

I

?

!b

/

'o,,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

3

n

D

ae

REGION ll

e

8

101 MARIETTA ST., N.W., SUITE 3100

g

ATLANTA. GEORGIA 303o3

SEP 121990

In Reply Refer To:

-

RIbJWC~

-259/80-30

50-260/80-23

50-296/ p

<

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by R. F. Sullivan of this office on

July 1 through July 31, 1980 of activities authorized by NRC Operating License

Nos. LPR-33, DPR-52 and DPR-68 for the Browns Ferry facility, and to the discus-

sion of our findings held with H. L. Abercrombie and J. L. Harness at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulation.2, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

$ C.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

(See Page 2)

901023 0

L.79

-

,

a

c-

,

SEP1

ggg

Tennessee Valley Authority

-2-

.

Enclosure:

1.

Inspection Report Nos. 50-259/80-30,

50-260/80-23 and 50-296/80-24

cc w/ encl:

H. L. Abercrombie, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

l

[

l

l

/

/

/

.