ML19336A506
| ML19336A506 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/12/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19336A507 | List: |
| References | |
| NUDOCS 8010230479 | |
| Download: ML19336A506 (2) | |
See also: IR 05000259/1980030
Text
-
I
?
!b
/
'o,,
UNITED STATES
NUCLEAR REGULATORY COMMISSION
3
n
D
ae
REGION ll
e
8
101 MARIETTA ST., N.W., SUITE 3100
g
ATLANTA. GEORGIA 303o3
SEP 121990
In Reply Refer To:
-
RIbJWC~
-259/80-30
50-260/80-23
50-296/ p
<
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by R. F. Sullivan of this office on
July 1 through July 31, 1980 of activities authorized by NRC Operating License
Nos. LPR-33, DPR-52 and DPR-68 for the Browns Ferry facility, and to the discus-
sion of our findings held with H. L. Abercrombie and J. L. Harness at the conclu-
sion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulation.2, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
$ C.
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
(See Page 2)
901023 0
L.79
-
,
a
c-
,
SEP1
ggg
Tennessee Valley Authority
-2-
.
Enclosure:
1.
Inspection Report Nos. 50-259/80-30,
50-260/80-23 and 50-296/80-24
cc w/ encl:
H. L. Abercrombie, Plant Superintendent
R. E. Rogers, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
l
[
l
l
/
/
/
.