ML19336A451

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-336/80-10 on 800728-30.No Noncompliance Noted
ML19336A451
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/26/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19336A452 List:
References
NUDOCS 8010230153
Download: ML19336A451 (2)


See also: IR 05000336/1980010

Text

- .

.

.

%e

UNITED STATES

'y

- "g

NUCLEAR REGULATORY COMMISslON

j

,j.

REGION I

e

g

631 PARK AVENUE

KING OF PR USSI A, PENNSVI,.V ant A 19406

.....

-

.

.

Docket No. 50-336

1

AUG 2 61980

,

l

Northeast Nuclear Energy Company

2

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations

'

P. O. Box 270

e

Hartford, Connecticut 06101

i

Gentlemen:

Subject:

Inspection No. 50-336/80-10

This refers to the routine inspection conducted by Mr. A. E. Finkel of this

4

office on July 28-30, 1980, at the corporate office in Berlin, Connecticut

.

of activities authorized by NRC 1.icense No. DPR-65 and to the discussions of our

i

findings held by Mr. A. ' E. Finkel with Mr. A. Roby of your staff at the conclu-

sion of the inspect 1on.

!

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

'

these areas, the inspection consisted of selective examinations of procedures

i

and representative records, interviews with personnel, and observations by the

-

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor)_ believe to be

proprietary, it is necessary that you make a written application within 20 days

,

to this office to withhold such information from public disclosure. Any such

i

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

'

which will be considered by the Commission as listen in subparagraph (b) (4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of.the affidavit.

If we do not hear from

you in' this regard within the specified period, the report will be placed in the

Public Document Room.

4

a

e

80102308

,

_J

a

.

AUG 2 61980

Northeast Nuclear. Energy Company

2

No reply to this letter-is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

Udt

obert T. Car son, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement

Inspection Report No. 50-336/80-10

cc w/ encl:

J. F. Opeka, System Superintendent Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Marager of Quality Assurance

J. R. Hiranelwright, Licensing Safeguards Engineer

V. Thomas, HQ, EW