Text
L f..
l i
l PHILADELPHIA ELECTRIC COMPANY l
2301 MARKET STREET l
P.O. BOX 8699 i
PHILADELPHI A. PA.19101 SHIELDS L. D ALTROFF EMe"5EUic.
October 6, 1980 Re:
Docket Nos.: 50-277 50-278 IE Bulletin 79-26 l
l Mr. Boyce H.
Grier, Director Office of Inspection & Enforcement Region I U.S.
Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Dear Mr. Grier:
This letter is in response to IE Bulletin 79-26, Revision 1, forwarded to us on August 29, 1980, concerning boron loss from BWR control blades.
I l
Action to be Taken LZ Licensee In order to assist the NRC in evaluating the value/ impact of each Bulletin on licensees, it would be helpful if you would provide 1
an estimate of the manpower expended in conduct of the review and l
preparation of the report (s) required by the Bulletin.
Please l
estimate separately the manpower associated with corrective l
actions following identification of problems through the Bulletin.
Response
l The manpower expended on items 1,2, and 3 of the Bulletin is estimated to be two aan-days per nonth.
Item 4 requires the services of an outside vendor estimated at thirteen man-months and $313,000 for computer time.
These
.8 01023 0/dY
a yk. ;.
Mr. Boyco H.
Grior Page 2 October.6, 1980 services are being expended on' behalf.of approximately ten utilities who are jointly participating in the preparation of a j
response to item 4'.
Corrective ~ actions associated with this Bulletin fall into two categories, additional safety analyses (e.g.,
shutdown margin adder) and control blade. replacements.
Approximately forty man-days were expended for control blade replacements during Peach Bottom Unit 2's most recent refueling outage.
A similar man power expenditure is expected during Peach Bottom Unit 3's next outage in the spring of 1981.
}
If you require any additional information or have any i
questions, please contact us.
1 i
Very truly yours, d
,(
i ec:
U.S.
Nuclear Regulatory Commission j
Office of Inspection & Enforcement Division of Reactor Operations Inspection i
Washington','DC 20555 l