Responds to IE Bulletin 79-26,Revision 1, Boron Loss from BWR Control Blades. Corrective Actions Fall Into Categories of Addl Safety Analyses & Control Blade Replacements.Approx 40 man-days Expended for Control Blade Replacements
ML19336A428
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/06/1980
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-26, NUDOCS 8010230104
Download: ML19336A428 (2)


Text

L f..

l i

l PHILADELPHIA ELECTRIC COMPANY l

2301 MARKET STREET l

P.O. BOX 8699 i

PHILADELPHI A. PA.19101 SHIELDS L. D ALTROFF EMe"5EUic.

October 6, 1980 Re:

Docket Nos.: 50-277 50-278 IE Bulletin 79-26 l

l Mr. Boyce H.

Grier, Director Office of Inspection & Enforcement Region I U.S.

Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Grier:

This letter is in response to IE Bulletin 79-26, Revision 1, forwarded to us on August 29, 1980, concerning boron loss from BWR control blades.

I l

Action to be Taken LZ Licensee In order to assist the NRC in evaluating the value/ impact of each Bulletin on licensees, it would be helpful if you would provide 1

an estimate of the manpower expended in conduct of the review and l

preparation of the report (s) required by the Bulletin.

Please l

estimate separately the manpower associated with corrective l

actions following identification of problems through the Bulletin.

Response

l The manpower expended on items 1,2, and 3 of the Bulletin is estimated to be two aan-days per nonth.

Item 4 requires the services of an outside vendor estimated at thirteen man-months and $313,000 for computer time.

These

.8 01023 0/dY

a yk. ;.

Mr. Boyco H.

Grior Page 2 October.6, 1980 services are being expended on' behalf.of approximately ten utilities who are jointly participating in the preparation of a j

response to item 4'.

Corrective ~ actions associated with this Bulletin fall into two categories, additional safety analyses (e.g.,

shutdown margin adder) and control blade. replacements.

Approximately forty man-days were expended for control blade replacements during Peach Bottom Unit 2's most recent refueling outage.

A similar man power expenditure is expected during Peach Bottom Unit 3's next outage in the spring of 1981.

}

If you require any additional information or have any i

questions, please contact us.

1 i

Very truly yours, d

,(

i ec:

U.S.

Nuclear Regulatory Commission j

Office of Inspection & Enforcement Division of Reactor Operations Inspection i

Washington','DC 20555 l

i 2

e a

i e

4-+.m g

--3 r-=yny--

g ve-er*

+,y

,