ML19336A411

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/80-26 on 800909-12 & Notice of Violation.Notice of Violation & Details Withheld (Ref 10CFR2.790)
ML19336A411
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/09/1980
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19336A412 List:
References
NUDOCS 8010230049
Download: ML19336A411 (2)


See also: IR 05000346/1980026

Text

gxug

-

.

'g

UNITED STATES

8

8'

NUCLEAR REGULATORY COMMISSION

n

c[E

$

REGION lli

799 ROOSEVELT ROAD

Q

,

e-

GLEN ELLYN,ILLINOls 6o137

l

\\

!

'OCT 0 91980

l

Docket No. 50-346

l

'

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President

'

j

Nuclear

l

Edison Plaza

l

300 Madison Avenue

l

Tolcdo, OH 43652

Gentlemen:

This refers to the special inspection conducted by Messrs. T. J. Madeda

and G. L. Pirtle of this office on September 9 through September 12, 1980,

of activities at the Davis-Besse Nuclear Power Station Unit I authorized

by NRC Operating License No. NPF-3 and to the discussion of our findings

with Mr. D. Huffman and other members of the Toledo Edison Company at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

l

the inspection. Within these areas, the inspection consisted of a selective

l

examination of procedures and representative records, observations, and

interviews with personnel.

t

,

During this inspection, certain of your activities appeared to be in non-

l

compliance with NRC requirements, as described in the enclosed Appendix A.

l

l

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

!

Section 2.201 requires you to submit to this office within twenty days of

your receipt of this notice a written statement or explanation in reply,

c

!

including for each item of noncompliance:

(1) corrective action taken and

j

the results achieved; (2) corrective action to be taken to avoid further

'

noncompliance; and (3) the date when full compliance will be achieved.

Be

sure to address each of these items in your response.

Areas examined during this inspection concern a subject matter which is

exempt from disclosure according to Section 2.790 of the NRC's " Rules of

,

l

Practice," Part 2, Title 10, Code of Federal Regulations. Consequently,

!

the enclosure to this letter, our report of this inspection, and your

!

response to the noncompliance identified in the enclosure to this letter

will not be placed in the Public Document Room. Therefore, your state-

ment of corrective action regarding the noncompliance identified in the

enclosure should be submitted as a separate enclosure to your transmittal

l

letter.

/

-

n*

  • la.

.

)

Ali EOS

-I N

..

--

e

Toledo Edison Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

i

.G. /Af

,

J. A. Hind, Chief

Safeguards Branch

i

l

Enclosures:

l

1.

Appendix A, Notice of

'

Violation

i

2.

IE Inspection Report

!

No. 50-346/80-26

-

(Part 2.790(d) Information)

l

cc w/encls:

l

Mr. T. D. Murray, Station

Superintendent

,

!

Central Files

l

Reproduction Unit NRC 20b

(

AEOD

Resident Inspector, RIII

i

cc w/o encls:

!

PDR

'

Local PDR

NSIC

TIC

l

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State

of Ohio

,

,

l

l

l

l

1

,

^

.!

ATTACl! MENT CONTAINS

'

10 CFR 2.700 (d) lf;f0RMATl0N

..

.

-

-

.

-

-

- . .