05000366/LER-1980-136-01, /01T-0:on 800930,Bechtel Notified Util That Psw Div I Line Was Inadequately Supported When Subjected to OBE or DBE Loads.Caused by Failure to Install 3-directional Support.Support Installed

From kanterella
(Redirected from ML19336A330)
Jump to navigation Jump to search
/01T-0:on 800930,Bechtel Notified Util That Psw Div I Line Was Inadequately Supported When Subjected to OBE or DBE Loads.Caused by Failure to Install 3-directional Support.Support Installed
ML19336A330
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/14/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19336A329 List:
References
LER-80-136-01T, LER-80-136-1T, NUDOCS 8010220496
Download: ML19336A330 (2)


LER-1980-136, /01T-0:on 800930,Bechtel Notified Util That Psw Div I Line Was Inadequately Supported When Subjected to OBE or DBE Loads.Caused by Failure to Install 3-directional Support.Support Installed
Event date:
Report date:
3661980136R01 - NRC Website

text

m.u m x g "" **

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATI'l'N)

I 6

l Gl Al El II HI 2l@l0 l0 l-I Ol 01 Ol 01 O l -l Ol O l@l 4 l Il 11 Il ll@l l

l@

0 1 7

9 LICENSEE CODE 14 lb LICENSE NUMBER 25 26 LICENSE TYPE JO

$7 CATb8 c0 IoIiI

$" "' l Ll@l 01 510l 0 l 01 3l 6 l 6 l@l 0 l 91310 l 810 l@lLl0 l1 I 4 l 8 l0 l@

7 8

60 61 DOCKET NUMBER 6d 69 EVENT DATE 14 75 REPORT DATE B0 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 10121 l During routine SU activities the site was notified of a seismic PSW I

lo131Idiv. I line that was inadequately suoported when subjected to 0BE or i

laicilDBE loads.

Assuming catastrophic failure of the subject piping, the I

lo isi i cooling water should be severely compromised, thereby, rendering the I

o e Iassociated equipment (area coolers for RCIC, RHR, CS, jockey pumps and,,j 10171 l DWL chillers) inoperable during a seismic event.

This is a repetitive I

10181ievent as last reported on LER 50-366/1980-100.

l 80 7

8 9 DE CODE S BC E COMPON ENT CODE SUBCOOE SU E

ITTil IW l A l@ W@ l C f@ lS'lU l P l0 lR lT l@ l Bl@ [Zj @

7 8

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LE R/RO EVENT YEAR REPORT NO.

CODE TYPE NO.

.O aE, 18l01 l-l l1l316l y

.l 01 1l l Tl l-l l 0_J su

, 21 22 23 24 26 27 28 29 30 31 32 fj f

AC N

ON PL NT ME HOURS 22 SC IT O FO tb 8.

SLPPLIE MANUFACTURER V W@l_Z_j@

W@

lZl@

l0l0l0l l

l Y l@

l N [@

lAl@

l B l 2 l 0 l 9 l@

33 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h lilOi l The cause of this event was due to the failure to insta'l a 3-direction-1 [TTr1 I al support on the div. I PSW piping.

Upon notification of this f act I

lby the AE action was immediately taken to install the support.

This i

i, i7i y l event does not have generic implication as Units 1 and 2 are not I

m Irouted in a similar manner.

I 7

8 9 80 A

% POWER OTHER STATUS ISCO Y

DISCOVERY DESCRIPTION Q [,C_j@ l 0 l 0 l 1l@l NA l

W @l Notification by AE l

ACTIVITY CO TENT RELE ASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE W @ [Z_,,J@l NA l

l NA l

i G 7

8 9 to 11 44 45 80 PERSONNEL EXPOSURES l0[d"l"0l@lZl@l NA l

i 7 PERSONNEL INJUt 'ES DESCniPriON@

NuMu n l o 1010 l@l NA l

1 a 7

r~

9 11 12 80

( J ',oy o';fs^cg,i, elo r^c" @

liI9ILZ_]@l NA l

H 9 10 80 issuti E SCHiPI BON L.tL 8L_

NA I

lIliIIIIIIIl12 2 a 8oI0220 %.

- e 912-367-7781 a,

C. L. CoGQin. Suot. Plt. Eno. Serv.

P,,oN e Ni,*1E OF PHEPAf tEH

l LER #:

50-366/1980-136 Licensee:

Georgia Power Company Facility Name:

Edwin I.

Hatch Docket #:

50-366

Narrative

Report for LER 50-366/1980-136 i

During routine startup activities, the site was notified by the AE (Bechtel) of a

PSW division I

line that was inadequately supported when subjected to OBE or DBE loads.

l This deficiency revealed piping seismic stresses that exceed l

code allowables and,was, discovered during a

review of l

"as-built" piping data acquired in response to IEB 79-14.

The cause of this high stress condition was due to the f ailure-to install a

3-directional support on the piping.

Assuming catastrophic failure of the subject piping, the cooling water.

(PSW div. I) would be severely compromised thereby renderng

(]

the associated components (area coolers for RCIC,

RHR, CA, L'

jockey pumps and. DWL chillers) inoperable during a -seismic event.

Due to this ' fact, Rx startup activities were suspended, and the unit was _ considered in a

12-hour LCO per Tech Specs section

3. 5.

Upon notification by the AE efforts were begun-immediately to implement the design change necessary to resolve the condition.

This change was satisfactorily implemented within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Similar-PSW piping (div. II) was available-and operable to equipment redundant to the l

inoperable equipment.