Text
p,1
-p#
y m,
L ffW y
1 yl Southern California Eclison Company SCE i
SAN ONOFRE NUC LE AR GENERATING $T A TION u
R.o..O. u.
S AN C LEMENT E. C ALIFORNI A 97473 November 30, 1989 c
+
. Mr. Ladin Delaney, Executive Officer i
California Regional: Water Quality Control Board l
_ San'Diego-Region:.
9771 Clairemont. Mesa Boulevard, Suite B' San' Diego, California 92124-1331 a
L.
Dear Mr. Delaney:
Subject:
NPDES Monitoring Report San Onofre Nuclear Generating Station, Unit 1 The S0'NGS monitoring report covering the month of October is submitted in accordance with~the requirements of CRUQCB Order 88 001 (NPDES Parmit No.
B "CA0001228). A summary of the generating unit's status and significant analytical results is provided below.
t.
LThe'unitLwasLoperational during October. All sampled water sources were found
- to be within' permit-limits, except the Sewage Treatment Plant. The effluent L ' ".'
- was high-on settleable solids October 20 and low on pH October 26. -It is believed lthat the'settleable solids increased due to the. introduction of an unknown substance into the sewer on October 19 and 20..The low pH occurred during the r covery phase from this upset on a day that, ittis believed, there' i was, another unknown substance in the influent. -In an effort to reduce these e
incidences, the EPA restrictions against introduction of foreign substances into the" sewer are being reemphasized to all site personnel.
Further, the.
, potential sources (a~nd flow paths) of foreign substances in the sewage h
treatment plant ~ are being evaluated.
Pursuant'to Order No.88-001, Reporting' Requirement 12, the following representative is authorized to sign and certify all reports required by this
> order: ~ Arthur Kneisel, Environmental Engineer.
_I certify under penalty of. law that I have personally examined and am familiar
- e
=with the information submitted in the attached document, and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate, and 8912200185 891211 ADOCK 0500 j6 gDR
<;y o.
--4
.. ~.
s
d4 ~$[, c - a,;
J,. '
.- j Mr. Ladin Delaney 2-November 30,-1989 NPDES Monitoring Report Unit 1
)
I i
complete.. I am aware that there are significant penalties for submitting 4
false information. including the possibility of fine and imprisonment, Sincerely, btS B. Katz Manager, Site Support Services L
Enclosure cc:
Environmental Protection Agency, Region IX h
i d f r-