ML19332F985
| ML19332F985 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/15/1989 |
| From: | Warnick R Office of Nuclear Reactor Regulation |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19332F986 | List: |
| References | |
| NUDOCS 8912200005 | |
| Download: ML19332F985 (4) | |
See also: IR 05000445/1989085
Text
PE N
i
4
' ' En
d
kh
' <,
'I
'
~,
,'",'c
, t.
.
,
<
I
',1%.'
DEC i 51939
' '
' In Reply Refer To:
'
l Dockets:
50-445/89-85
'
50-446/89-85
,
m
l
Mr;
W.'J.
Cahill, Jr.
.
. Executive {Vice President
TU-Electric'
400' North Olive Street, Lock Box 81.
i
- Dallas, Texas:
75201'
+
Dear Mr.;Cahill:
'
ThisE refers 'tcr the inspection conducted by Mr. M. Runyan and NRC.-
(consultants during the period November 8 through December 5, 1989, of'
- activities authorized.by NRC Construction' Permits CPPR-126 and.
H
CPPR-127.for the Comanche. Peak Steam ElectricLStation, Units 1 and 2,
'
and to the-discussion of our findings;with you and membersiof your.
-
i
- ,. staff 1at.the conclusion of the inspection.
The enclosed copy of our. inspection report identifies. areas examined.
during.the' inspection.
Within these areas, the inspection consisted;
,
,
i=
of-selective examination of' procedures and representative. records,
interviews with personnel', and observations by the inspectors.
pg
.Within:the: scope of.the inspection,eno violations or deviations were-
'
"Jidentified.
4
^
~
1
In accordance with 10.CFR12.790 of the Commission's regulations, a
copy'of this11etter: and the: enclosed inspection report will be placed
I
in'the NRC'Public Document Room.:
Should-youthave any questions concerning this inspection, we wil1~be
i
pleased.to! discuss them wi.th.you.
Sincerely,
URICDTAL SIGNED BY i F. WhRincK
i
R. F. Warnick, Assistant. Director
for Inspection Programs
Comanche. Peak Project Division.
.
Office of Nuclear Reactor Regulation.
-
Enclosure:
Inspection Report 50-445/89-85;~50-446/89-85
occ w/ enclosure:
,
See_next page
h
RFU)
CPPD:NRRgt-
CPPD:NRR 7p
AD:CPPD:NRR
-MRunyan:ww
HLivefmore
RWarnick
112/15 /891
12/t3/89
12//f/89
$$
8912200005 891215
,
g(/l
ADOCK 05000445 a'
O
.-
. .-
..
.
..
.
- -
.
-
.
--
-
..
-.
~
r .
,
,.
hY* , ,
'
q
C,
- ' m,*C%
71 - k
- .
- UNITED STATES -
g . gs .
c'
7
NUCLEAR REGULATORY COMMISSION
,
[
i'
- WASHINGTON, D. C. 70696
'
!
DEC 151989
'
-*c .*,
<s
i
+
L
.In Reply P4fer To:
,
Dockets: :50-445/89-85
50-446/89-85
[
.Mr. W. J. Cahill, Jr.
'
Executive Vice President
"
,
m
TU Electric.
'
400 North Olive' Street, Lock Box 81
Dallas, Texas
75201-
Dear Mr. Cahill:
9
1:
Th'is; refers to the-inspection conducted-by-Mr. M. Runyan and NRC
consultants <during the-period November 8 through December 5, 1989, of
activities authorized by NRC Construction Permits CPPR-126 and-
CPPR-127 -for the Comanche . Peak Steam Electric Station,- Units 1 and' 2,
and to..the discussion of our findings with you and members of your.
Ll
staff at the-conclusion of the inspection.
>
y
K-
.The enclosed copy of our-inspection report identifies areas examined
2
4during the inspection.
Within these areas, the inspection consisted.
,
of, selective examination of-procedures.and representative records,
interviews with personnel, and observations by the inspectors.
Within'the scope of the-inspection, no violations or deviations were_
"
' identified.-
s
In accordance with 10-CFR 2.790 of'the Commission's regulations, a
E
copy of this' letter and the enclosed inspection report will be placed.
in:the~NRC Public. Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
,
&
RFLO&
'
R. F. Warnick, Assistant Director
'for Inspection Programs
Comanche Peak. Project Division
Office of Nuclear Reactor Regulation
Enclosure:
Inspection Report 50-445/89-85; 50-446/89-85
cc.w/ enclosure:
See next page
.
.
r
_.
.
_
-
. ..
_
_
. _ _ _ _ _ . _ .
,
~
%
,[-* '
J.'Cahill, Jr.
DEC i 51989
;.
,
'cc w/ enclosure:.
'
Roger D. Walker
TU Electric
Manager, Nuclear Licensing
c/o Bethesda Licensing
TU Electric
3 Metro Center,. Suite 610
'440. North Olive Street, L.B. 81.
Bethesda, Maryland
20814
Skyway Tower
.
>
riallas ,100 75201
E. F. Ottney
P. O. Box.1777
Juanita Ellis
Glen Rose, Texas
76043
- President
. CASE
1426 South Polk Street
Jack R. Newman
d
Dallas, TX
75224-
Newman & Holtzinger
U
__
1615.L Street, NW
'
Texas Radiation Control
Suite 1000
' Program Director
20036
-
-Texas Department of Health
' 1100 West 49th. Street
George R. Bynog
Program Mgr./ Chief Inspector
i
Texas Dept. of Labor & Standards
GDS Associates, Inc._
.
Boiler Division
1850 Parkway Place, Suite'720
P.O. Box 12157,-Capitol Station
i
l
. Marietta,-GA
30067-8237
78711
Honorable George Crump
County Judge
Glen Rose,-Texas
76043
Ms., Billie Pirner Garde, Esq.
I
Robinson,JRobinson, et.al.
~
103-East College Avenue
Appleton, WI-
54911-
- Regional Administrator, Region IV
l
- U.S. Nuclear Regulatory Commission
. 611 Ryan Plaza Drive, Suite 1000
Arlington, Texas
76011
L
' William A. Burchette, Esq.
-
Counsel for Tex-La' Electric
Cooperative of Texas
Heron, Burchette, Ruckert & Rothwell
1025 Thomas Jefferson St., NW
-
20007
.
<
-
-
-
--
.,
- _ ,
. _ ,
,
'
,
4
<
(
t
,
'
- .
50-445/ff-f$s - 50-446/$9-8$
'
.
- DISTRIBUTION:
NMMSMddMT;$3MMMYi
NRC PDR
<
+
LPDR-
JCPPD-LA.-
..
CPPD' Reading-(HQ)
'ADSP
Reading.-
-
. Site Reading File
L
- R.-Warnick
'
- J..Wiebe
- H.- Livermore
- MIS System,-RIV'-
- RSTS Operator,,RIV
RPB, RIV.
RIV Docket File
J. Gilliland, RIV
,
- L..-Shea, ARM /LFMB'-
C.
I. Grimes
~
JJ. H.= Wilson
J.~Lyons.
. M . - ' Malloy
J. Moore, OGC
M. Fields
D. Crutchfield;
.T.-Quay
E.-Jordan
.B. Grimes:
'%
B. Hayes
C.:Vandenburgh-
J.
Partlow
- w/766'
1
.
..
.-
ill
.