. DEC 0 81989
,
P
i
Docket No. 50-456
. Docket No. 50-457
Commonwealth Edison Company
l
ATTN:
Mr. Cordell Reed
r
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
'
.
.This refers to the routine safety inspection conducted by Messrs. W. B. Grant
,
and M. A. Kunowski of this office from September 19-22, and October 23 to
November 3, 1989, and to the special inspection conducted by Mr. M. A. Kunowski
<
on November 3-14, 1989, of activities at Braidwood Station, Units 1 and 2,
authorized by NRC Operating Licenses No. NPF-72 and NPF-77, and to the
discussion of our findings with Mr. R. Querio and others of your staff at
the conclusion of the onsite inspection.
It also refers to the telephone
discussions with Ms. E. Roche and others of your staff on November 14 and
29, 1989, and with Mr. Querio on November 29, 1989.
'
The. enclosed copy of our inspection report identifies areas examined during
<
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
'
interviews of personnel.
The inspection also included a review of your investigation of a possible
overexposure to a radiation protection technician. We concur with your
findings that the technician received no exposure of significance and the dose
registered on his TLD came from its deliberate exposure in the station's gamma
calibrator by someone unknown.
As noted in the exit interview and in
subsequent telephone discussions, we consider tampering with personal
dosimetry devices to be a serious matter which demands firm action and
continuing attention on your part to preclude recurrence.
Our inspection
found that the matter was properly stressed by Mr. Querio and others in
meetings with station personnel.
We also understand that the station has
.
significantly strengthened access control to the calibrator keys by requiring
,
logged issuance by radiation protection supervisors for each use, and by
requiring that neutron badges be returned to the radiation protection office
after each use.
If our understanding of the station's actions in response to
.
-this event are not correct, please inform us immediately in writing.
No violations of NRC requirements were identified during the course of this
inspection.
/, '
\\
8912190363 8912o8
f/
i
mockosoogg6
enn
O
i.
--
--
.
_
f'
.
'^
- .
,
-4
- .
-
- Commonwealth Edison Company
2
DG 0 8 29
l!
- In accordance.with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the' enclosures, and your response.will be p' laced in the
NRC Public Document Room.
~We will gladly discuss any questions you have concerning this inspection.
'
Sincerely,
,
Charles E. Norelius, Director
Division of Radiation Safety and
'-
Safeguards
Enclosure:
Inspection Reports
No. 50-456/89025(DRSS);
No. 50-457/89025(DRSS)
cc w/ enclosure: .
bec w/ enclosure:
T. J. Maiman, Vice President,
D. Funk, Rill
PWR Operations
T. Kovach, Nuclear
'
,
Licensing Manager
S. Hunsader, Nuclear
.
Licensing Administrator
R. E. Querio, Station Manager
.
.
D. E. Cooper, Regulatory
Assurance Supervisor
,
DCD/DCB (RIDS)
.
Licensing Fee Management Branch
!
!
Resident Inspector,_RIII
Braidwood
i
Resident Inspector, RIII Byron
D. W. Cassel, Jr., Esq.
1
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S.. Taylor, Quality Assurance
Division
E. Chan,-0GC
G. Berry, OGC
Stephen P. Sands,-NRR
L
t.p
RIII
R
RIII.,
RIII
RI
RIII
f
Kn s /gd
Grant
S
s$her
ds
6r
N
ts
/2- 7
rgd5]
,