Text
y
,, =.
%,s.
. dMdht/
x a,
!!?%.7
.NOV 2 91989 s
i k
1 Docket Nos. 50-424 50-425:
l License Nos. NPF-68. NPF-81 t
1
- Georgia Power Company-ATTN
- _Mr. W. G.-Hairston, III Senior Vice President -
i:,
Nuclear Operations P. O. Box'1295 Birmingham, AL 35201 0
Gentlemen:
SUBJECT:
V0GTLE STEAM ELECTRIC PLANT EMERGENCY PLAN REVIEW, REVISION 11:
i.
.Thank you ' for your. response of September 25, 1989, to our concerns-regarding Revision '11 'to the Vogtle Steam Electric Plant Emergency Plan which were transmitted to you on August 13, 1989.
-Based on your written response, Region II continued to have several concerns related to the changes made to Section 0, Item 0.1. Training.
Further
. discussions between J. Roberts of your staff and-A. Boland of Region II on November 3 and 16.1989, resulted in the following commitment.
Effective
.imediately, Vogtle will discontinue crediting managers for annual Emergency
. Plan requalification training when they participate in an integrated drill, and the. training requirements of Section 0, Revision 10 will be fully reinstated for all managers. As an exception,-the General Manager will be allowed to take credit for annual requalification training by participation in an integrated drill.
This exception is noted due to this position's significant involvement in emergency planning activities (i.e., approval of Emergency Plan and Procedure changes, and approval of exercise critique corrective actions).
The Emergency Plan changes resulting from this commitment will be incorporated into the next routine revision to the Emergency Plan which is planned to be l
submitted to the NRC during March 1990.
If you have any questions regarding this matter, or your understanding of this commitment differs from the above, please contact Mr. William H. Rankin at 404-331-5518.
Sincerely, C"EM SIGNED FY D' USLt5 M. CO':" 9 J. Philip Stohr, Director Division of Radiation Safety and Safeguards cc:
(See page 2) 8912140096 891129 PDR ADOCK 05000424 (n
F PNV s
yg-
,,, +.
p
p:my V
n; m r-g-3
.g_
%{
4 pp s.-
2
- Georgia Power Company 3 6
',.Lb cc:
R. P. McDo'nald Executive.Vice President-Nuclear-Operations:'
g Georgia' Power' Company P. 0. Box 1295 Birmingham, AL',35201-C. K. McCoy Vice President-Nuclear E
Georgia Power Company.
ie P. O. 1295 Birmingham, AL 35201
~
~
G~ Bockhold, Jr.
General Manager, Nuclear Operations Georgia' Power Company P. O.-1600
. Waynesboro, GA 30830 J..A. Bailey-Manager-Licensing Georgia. Power Company P. O. Box 1295 i
Birmingham, AL 35201
-B. W. Churchill Esquire Shaw, Pittman, Potts, and Trowbridge 2300 N Street, NW Washington, D. C.
20037 J. E. Joiner,' Esquire Troutman, Sanders, Lockerman, and Ashmore 1400 Candler Buildir.g 127 Peachtree Street, NE Atlanta, GA 30303 j
D. Kirkland, III, Counsel l*
Office of the Consumer's I'
Utility Council Suite 225, 32 Peachtree Street, NE Atlanta, GA 30302 Office of Planning and Budget Room 615B 270 Washington Street, SW Atlanta, GA 30334 cc:
(Continued on page 3) l
f!:lg:,Lo; a;
~ Georgia Power Company 3
j.;
0ffice of the County Commissioner Burke County Commission-Waynesboro, GA 30830 J. Leonard Ledbetter, Director Environmental Protection Division Department of Natural Resources 205 Butler Street SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 State of Georgia bec: E. Reis. 0GC J. Hopkins, NRR K. Brockman, RII Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 572 Waynesboro, GA 30830 RI s0RA R
DRSS RII:
S RII:D P AB and WR$nkin DCol nh k Fdckman 11/p/89 11/pf//89 11/
89 11(f/89 1
1