Ack Receipt of Requesting Extension of Completion Date for Root Cause Analysis Program from 891031-1231. Requested Change Acceptable
ML19332F046
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/30/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8912130319
Download: ML19332F046 (2)


Text

y :,r v.

,it y

m

.? s c,

p

\\

p 30h

"}i y-p.

'jh;,

[f3

'3 s g.,

j.

+,

+'

~

i Epp]}j7 nJ 4

,g s

g'

-(

t (C -

In, Raply-P.sfer To:;

i.

+

7 Locket:- 50-298/89 a t" '

l Nebraska, Pub 11c' Power District

j..

cATTN:' George A. Trevors L

Division Manager - Nuclear Support E

4 LP.O. Box 499 g

Columbus,-Nebraska-68602-D499 l

c Gentlemen

.t cThis letter acknosledges the receipt of your November 3,1989, letter which requestid extending the completion date for your root cause a'nalysis' j

program from October 31, 1989 - to December 31, 1989.

In accordance with *

. previous discussions with your staff, the requested change is considered' I

acceptable.. We will review the implementation of your root:cause analysis
program during future-inspections to detennine that full compliance has been, x>

'1

. achieved and will be maintained.

Sincerely, l

0

.e

'?

Samuel J. Collins, Director Division of Reactor Projects te cc:

Nebraska-Public Power District ATTN:-LG.:D.' Watson, General Counsel.

+

P.O.4 Box,499,

' Columbus, Nebraska '68601-

. Cooper-Nuclear Station, ATTN:. Guy R. Horn, Division Manager of Nuclear Operations P.O.! Box'98

~ Brownville, Nebraska 68321 fel RIV:DRP/Ci$ A C:[

P 0:D hI

-GLMadsen;df GLC table 5 J 11 s 11/y/89' 11/yt/89 1

9 s

'o 8912130319 891130

._1. C._____ _K 05000298_. _ _ _,_

l RDR ADOC PNU

5

  • a f '^

/

R$ll:gg ?.

~

f.x?$Wnjf s s ~ 2 n

x i

m A re, y m

!ij,.9 M j'.

g, fi f '!

Nebraska Public' Power District

2-t-

g' s

o N'

+

w p

N

. Nebraska Department'of: Environmental

/ Contml : '

W

~ ATTN:. Dennis Grams, Director P

'P.0.1 Box 98922L 1

Lincoln, Nebraska 68509-8922-

Nemaha: County Board of Connissioners

' ATTN: ; Larry Bohlken, Chairman 6

Nemaha County Courthouse la L1824 N Street.

' Auburn,: Nebraska 68305 2

o Department of" Health s

' '; qq3 2 Division off Radiological' Health' 0 " ATTN: LHarold Borchart.l Director

-y301' Centennial: Mall, South

,P.0ABox?950074

. Lincoln', Nebraska 68509-5007

' Kansas Radiation Control Program Director 3

.;4 s

t u.S; Nuclear Regulatory Connission ATTN:L.t enior Resident: Inspector S

J.

P.O. Box 218

'Brownville,. Nebraska 68321

- U.S. : Nuclear Regulatory Connission.

, NATTN:: Regional Administrator, Region IV g

61TAyan~ Plaza Drive, Suite 1000-C Arlington, Texas-76011:

. 'b'cc'.t[0MB l(IE01) i y

1 y

fbccdistrib.byRIV:

.R. D.: Martin Resident Inspector Section Chief (DRP/C).

Lisa Shea, RH/ALF-1 N

DRSS-FRPS MIS System l

s Project Engineer (DRP/C)

M RIV' File..,

DRP RSTS Operator-P.30'Connor', NRR Project Manager (MS:

13-D-18)

DRS

+

a L

s I q ;.

u-i

),',

[,

i np; W.;

g

':lk '

3 Nebraska Public Power District

" ' *Y' hd$o5!Nfff$h""

Macu_m CNSS893249 November 3. 1989 Nl4N

)

U.'S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC-20555

Reference:

1) Letter from G. A. Trevors (NPPD) to U. S. NRC dated May 17, 1989; subject: NPPD Response to Notice of Violation - NRC Inspection Report No. 89-09

~2) Letter from R. D. Martin (U.S. NRC) to G. A. Trevors (NPPD) dated June 20, 1989; subject: Systeuatic Assessment of Licensee Performance l

3) Letter from G. A. Trevors (NPPD) to R. D. Martin (U.S.'NRC)

-dated August 11,'1989; subject: Systematic Assessment of Licensee Performance Gentlemen:

'This letter documents recent discussions with NRC Region IV regarding the District's request for a time extension for completion of a portion of the corrective action response contained in Reference 1.

The District committed to complete four corrective steps in the Reference 1 letter; and three of these'have been'successfully accomplished. However, Otep four was to make certain changes to the Root Cause Analysis Program, and had a commitment completion date of October 31, 1989.

The District is undertaking a comprehensive upgrade of the Root Cause Analysis Program at Cooper Nuclear Station as a result of our 1989 SALP Report

'(Reference 2). A detailed, independent review of.the existing program is being conducted by a leading expert in Root Cause Analysis. The recommendations of this' recognized specialist are being reviewed in depth and will be incorporated, as appropriate, into the Cooper Nuclear Station program

.by December 31, 1989. This upgrade will be more comprehensive than, and will include the= commitments (corrective action step 4) of, our-Reference 1 letter.

'In co'nsideration of the benefits that will be realized by the more in-depth review and resulting upgrades to the Root Cause Analysis Program at Cooper Nuclear Station, the District requests the scheduled completion date of Item 4 in Reference 1 (October 1989) be modified to coincide with the scheduled completion date of December 1989 committed to in the District's SALP response (Reference 3).

l 1c-g % W ff m mww m v m m v,memaux w wm. m y g w w wm m u l

> +wz, +c 1

e

,i,v hiki T

e!-

~

i;

-.-- O.S;[ NEc10 r RIgulatory Commissitn

[:;

'. November '3, '1989;-

"6,Page 2 If you'have aay questions regarding this response, please contact me or q

ll C. R. Horn at'the site.

j 1;

l'

~ Sincerely, g-M4k j

4 G. A..Trevors

. Division Manager Nuclear Support GATsjs/sg cc:/U.S. Nuclear Regulatory Commission

\\

Region IV' Arlington, TX NRC Resident Inspector Cooper' Nuclear Station 1

i s

f.

j i

I 3

l 6

l i

i L

j 1

l 1-L c

]