ML19332F034

From kanterella
Jump to navigation Jump to search
Exam Repts 50-254/OL-89-03 & 50-265/OL-89-03 on 891106. Exam Results:Written Requalification Exam Administered to One Reactor Operator as Followup to Failure from May 1989 Requalification Exams.Reactor Operator Passed Exam
ML19332F034
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 11/28/1989
From: Bielby M, Jordan M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19332F031 List:
References
50-254-OL-89-03, 50-254-OL-89-3, 50-265-OL-89-03, 50-265-OL-89-3, NUDOCS 8912130301
Download: ML19332F034 (3)


Text

r.

I.-

' U.S. NUCLEAR REGULATORY-C0ffilSSION

' REGION 111 7

Report No. 50-254/0L-89-03_

Docket Hos. 50-254; 50-265 Licensee Nos. DPR-29; DPR-30 j^, '

Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Quad Cities Nuclear Power Station t

Examination Administered at: GE Dresden Simulator; Morris, IL-Examination Conducted: November 6, 1989 k M C.

il/2P/f9 Chief Examiner:

N. E. Bielby

/

Date Approved by: N

  1. /

M.J/J@ dan Date Examination Sumary-Examination administered on November 6, 1989 (Report No. 50-254/0L-89-02))

. A written-requal.ification examination was administered to one Reactor Operator

. (RO) as'a followup to the failure from May 1989 Requalification Examinations.

Results: The R0 passed the examination. The facility result satisfied the

- NRC criteria for parallel grading.

L L-e912130301891%g I

PDR ADOCK 050 p V

l y.--..

,m

'I<'

'g '

k f:

l' I..:

=

~

REPORT DETAILS 1.

Examiner M. E. Bielby, Sr., Chief Examiner, USNRC, Region 11 2.

Exit Meeting An enit meeting was conducted on November 6, 1989, at the General Electric (GE) Dresden Simulator.

Facility Representatives R. Svaleson; Main Instructor, License Retraining l

NRC Representative "H. E. Bielby, Sr., Chief Examiner, USNRC There were no comments at the Exit Interview.

3.

Examination Results Comparison A comparison'of the examination.results between the facility and the NRC grading was within the tolerance allowed by NUREG-1021, ES 601,

' Revision 5.

4.

Overall Requalification Program Evaluation

')

The requalification program was previously assigned an overall program rating of satisfactory (See Report No. 50-254/0L-89-02).

1 i

1

> < :. (.; ;, y Fa'cility: Quad Cities Nuclear Power Station Chief Examiner:

M. E. Bielby, Sr.

. Dates of Evaluation: November 6, 1989 Areas. Evaluated:' Written Examination Results:

R0 SRO Total Evaluation Pass / Fail Pass / Fail Pass / Fail (S, M, or U) 5 :t Written Examination 1/0 0/0 1/0 S

Evaluation-of facility written examination grading: The facility grading was within the tolerance allowed by NUREG-1021, ES-601, REVISION 6.

1 Overall Program Evaluation Satisfactory X

(See Report No.. 50-254/0L-89-02)

~

tted:

For rd Approved:

Bielby Jorda'n / /

W i ht Examiner Section Chief Branch Chief 11/pf/89 11/2 T/89 11/g/89

,-,