ML19332E478
| ML19332E478 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/22/1989 |
| From: | Gibson A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W ALABAMA POWER CO. |
| Shared Package | |
| ML19332E479 | List: |
| References | |
| NUDOCS 8912070275 | |
| Download: ML19332E478 (3) | |
See also: IR 05000348/1989026
Text
.
,
,, ,_
.
.-
- .
.
.
-
.
~
.
.:
.
j
l_
p f ? . :-
l
-
o
7 jj
1'1 db
,
1
3
- <
November 22' 1989
,
,
,
4>
(
,
t
..
y.
,
DocketNos[50-348,'50-364
'
'
,
License'Nos. NPF-2, NPF-8-
>
,
( ;
l
,
$
' Alabama: Power Company
- .
5
_ Senior: Vice President
- AT1N:
Mr.'W. G. Hairston, III
,
>
p
.
.
NuclearL0peration's .
-
40 Inverness Center Parkway-
- P. O. Box-1295
g
JBirmingham,:ALi:35201
.
_
"
-Gentlemen:s
l SUBJECT: NOTICE OF VIOLATION-
' (NRC: INSPECTION- REPORT NOS. 50-348/89-26AND50-364/89-26)
-
,
- This hefersito.the Nuclear Regulatory Commission (NRC) inspection conducted by
+
.S.-G. Tingen on October 2-6,l1989?and October 16-20,:1989, and to the related
telephone conference on November 17,:1989. The~1nspection included:a review of
'
activities authorized for your- Farley facility. . At the . conclusion:of the
inspection. the findings ~ were discussed with those members of your staff
.
fidentified in the enclosed Inspection Report.-
"
1
Areas 1 examined during- the inspection are identified in the report.
Within
- these areas, the inspection consisted of selective examinations. of procedures
~
o is
f and representative records, interviews with personnel, and observation- of
9
activities in: progress.
H
~ "TheTinspectionLfindings indicate that certain activities appeared to violate
1
-NRC requirements. .The . violations, references to pertinent requirements, and
.
elements to be included in your response are described in the enclosed Notice
ofLViolation.
,.!w
17' 1989, a telephone conference was conducted between Region II,
On " November
,'
-
LNRR, Plant .Vogtie, -Plant- Farley, Georgia Power Corporate and- Alabama Power
- , ,
Corporate ' personnel .
The topic - of this conference was to discuss the
. November 15, 1989, memorandum from'R. C. Jones to D. B. Matthews concerning the
>
,
- Vogtle (and Farley) Interpretation of Technical Specification (TS) 3.4.4
'
Limiting Condition. for- Operation, Relief ~ Valves and its applicability.
This
m
memorandum is enclosed as Enclosure 3.
Based on this conference it is our
'
L ;,
. understanding that Plants ' Vogtle and Farley committed to conduct at power
'
' testing of the' power operated relief valves (those not previously tested) on
,
-NovemberJ17, -1989.
On November 17, 1989, this testing was performed
satisfactorily.
.-
The enclosure presents the NRR staff position that the satisfactory testing of
.
'the automatic function of the relief valves is required to prove that these
'
relief valves are operable.
8912070275 891122
ADOCK 05000348
g
O
/
,4
m
pm
m,
. . .
.
_
_
.
. .
.
.
.
_ _ _ . . _ , _ _ _
.
. .
.
K
1
,)-
,
.
'
p.
-
.
.
,
.. ..
4
, '
!
Ala'bama Power Company
2
November 22, 1989
f
v
i
Since the corrective actions for this issue have been fully discussed and were
,
satisfactorily completed, a response to the Notice of Violation, Violation B,
is not required.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2
Title 10 Code of Federal Regulations, a copy of this letter and its enclosures
.will be.placed in the NRC Public Document Room.
'The responses directed by this letter and its enclosures are not subject to the
clearance procedures 'of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
,
'
Should you. have any questions concerning this letter, please-contact us.
Sincerely,
Original Signed by
'
Albert F. Gibson
Albert F. Gibson, Director
Division of Reactor Safety
Enclosures:
1.
Notice of-Violation
2.
NRC Inspection Report
3.. Memorandum from R. C. Jones to
l
-
D. B. Matthews
cc w/encls:
B. L. Moore
. Manager, Licensing
i
Alabama Power Company
l
P. O. Box 1295-
l:
Birmingham, AL 35201
l
R. P. Mcdonald
Executive Vice President
Alabama Power Company
P. O. Box 1295
Birmingham, AL 35201-
J. D. Woodard
Vice President
' Nuclear Farley Project
A a ama Power Company
lb
.P. O. Box 1295
Birmingham, AL 35201
f
g
^
?
~
^
,
s
.
..
b.
,~.
<
4
W ,-
.
p'.
- - , .
.,?
^I
'
2 Alabama Power Company
3
November 22, 1989
)
.
4 .-
)
n>
p
i
b
D.<N.' Morey-
General Manager
Farley- Nuclear Pl~ nt
a
.
..
Drawer 470;
Ashford,:AL 36312
Louis B. Long, General Manager'
'
'
- Southern Company Services, Inc.
' P. O.-Box'2625 ~
.
a
~ Birmingham,:AL T35202
'
Claude Earl Fox. M.D.
State Health: 0fficer -
-
State Department of Public Health
-State' Office Building
.
Montgomery. AL1 36130
'
Chairman.
Houston County Comission
- Dothan,AL;e36301
1
State'of Alabama-
.bcc w/encls:
E. Reeves, Project Manager, NRR
Document Control Desk
.NRC~ Resident Inspector
^-
U.S.; Nuclear ~ Regulatory Comission
Route-2,1 Box-24
a
~ Columbia', AL 36319-
'
.F.:Cantrell-
,
J
A. Belisle
S._Tingen
-S?-Sparks-
,
i.:
s
RII: /
RII:DRS
e
ses
A
c7
eW
-RII:DRS
RII:DRS
RII D S
'
FCantrell
,
~STingen-
SSparks
sie
CJulian
11g /89, tl, p
11/')s /89'
11/2i/89
11/g/89
11/2//89
'
s
,
,
--
. . , _
_,.-s.,
.
- -
. . - . .
_
- , - .
. - - . , _