ML19332D895
| ML19332D895 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 11/29/1989 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML19332D896 | List: |
| References | |
| NUDOCS 8912060013 | |
| Download: ML19332D895 (2) | |
Text
'
Do
~
a) j ll
[,
~
.,; y;,;
s si Af
)@/ 2 9~ R f-
-s M,..
~ (In Reply Refer To::
a Docket:. 50-285/0L 89-03:
y l
c
)
1
~
~
O
~
g 10mahaL Public Power: District-
' ATTN: -Kenneth1J.1 Morris, Division Manager 7
. Nuclear Operations:
l, 444' South 16th Street Mall-4 0maha, Nebraskai'68102-2247-o Gentlemen:.
[
-r t
- SUBJECTi:EXAMINATIONREPORT,FORTCALHOUNSTATION(FCS)-
lOn" October 2/1989, NRC administered examinaNons to employees of-your; company
- n. 3.
' '~
who had applied for, senior reactor operator '(SRO) licenses to direct operations '
at your-FCS facility. At:the' conclusion'of the examinations, the examination keys were provided to facility; staff personnel'.. All applicants passed.these.
.' J examinations. Overall, written examination results were good and operating j
-test performance was noticeably improved'over that observed during the past' i
4 several examination visits, particularly;in the areas of operator professionalism 1
y :.
and operator. competence.>
+
As.a. result of<the examination review performed by licensee representatives, it was determined that a significant portion of the lesson plans and other training:
material'provided to the NRC for examination preparation was either technically inaccurate or out-of-date. ;This deficiency in submitted material resulted in m
1more than 10 percent,of the written'examinationstest items being deleted after administration.:
, We.have conc'lu'ded that the final, written examination was valid, and followup.
. action has been taken to preclude recurrence. We expect that your. followup 4
action will assure accurateLdevelopment material for future examinations.
Should'you have any questions concerning this. letter,: please contact us.
L' Sincerely, i
Onginal Signed By:
l Samuol J. Collins
,i l
Samuel'J. Collins, Director Division of Reactor Projects.
~'
l"
Enclosure:
j Examination Report 50-285/0L 89-03
- cc w/ enclosure
- .(see next page)
- RIV:0LS
- C:0LS
- D:DRS D:
,j SLMcCrory/lb JLPellet LJCallan S
ns
/' /89-
/ /89
/ /89
$ /p/89 y
i
- Previously concurred gg2060013891129 y
ADock 050002e5 g
PDC e
, ~ w' e
ff/g,g,
i q
l
( _ -fi.
7 1h ;
a-.
.e-j'[.
'c
- r l:
- Omaha'Public Power Dist'ict -
r
- g
- +n
+
s: c y
LhBoeuf Lamb, Leiby-&~MacRae L
ATTN:: Harry H. Voigt,:Esq.-
h a-L
.1333 New; Hampshire Avenue', NW.
Washington, D.C.
20036~
p zWashingtonCountfBoard g,.
o"-
- of ' Supervisors '
~
- ATTN: Jack.Jensen, Chairman
- p '
- Blair, Nebraska 68008 u
nCombustionIEngineering,.Inc..,
1 ATTN:- Charles B.:Brinkman, Manager s
(
J4 Washington, Nuclear Operations :
%.m
'12300 Twinbrook1 Parkway,: Suite 330 f7,'
Rockville, MD; 20852J v.
- Departirent: of H' alth;.
e c" ATTN: 11arold Borchert, Director.
's t
f Division of Radiological Health N'
1.
'301< Centennial Mall South
~
i i 'P.0L Box 95007L..
n Lincolnc Nebraska 68509 y -.
' f'FortLCalhoun Station a
- ATTN:i G. R. Peterson, Manager i
P.O. Box'399~
j
' Fort CalhounL Nebraska 68023
.bccitoDMB(IE42),
m.t bec,distrib Lby,RIV:-
t
- ;'D? Martini Resident' Inspector-R 5
.DRSS-FRPS Section Chief-(DRP/B) w
'-MIS System.
RIV File Project Engineer (DRP/B)
E. Haycraft L S.' :McCrory.
J. Pellet DRS(S.McCrory)
LFMB-Facilities Section
.LLMiller,TTC w
,:A. Bournia, NRR Project Manager (MS: D-18) q a
s
,,e c.'i r j
w l < Q.'
'.,4 yf.'
lj
'e t