Forwards Requalification Program Evaluation Rept 50-423/89-09(OL-RQ) of Exam Administered on 890918-22
ML19332D456
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/22/1989
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19332D457 List:
References
NUDOCS 8912010226
Download: ML19332D456 (4)


See also: IR 05000423/1989009

Text

,

.

,

4

+'

NOV 221989

Docket'No. 50-423

Northeast Nuclear Energy Company

4

'ATTNi Mr. E. J. . Mroczka

Ti

= Senior Vice President - Nuclear

-

'

'

Engineering and Operations Group

P.O. Box 270

i

. Hartford, Connecticut 06141

',

,'

Gentlemen:

.

SUBJECT: REQUALIFICATION PROGRAM EVALUATION REPORT NO. 50-423/89-09(OL-RQ)

OnLSeptember 18 - 22, 1989, the NRC administered requalification examinations

- to employees of your company who operate the Millstone Nuclear Power Station,

-

. Unit No. 3. .The' evaluation was conducted in-accordance with NUREG-1021, Opera-

tor.' Licensing Examiner Standards, ES-601, " Administration of' NRC' Reque.lifica-

s

t

tion. Program Evaluations." The evaluation had two purposes, evaluation of!the

,

' effectiveness on=the licensed' operator requalification training program at

naintaining the' competency of the licensed operators, and examination of the

individual' operators to determine-if they would satisfy the regulatory require-

'

_

,

ment of-. passing-an NRC administered examination prior to license renewal.

At-

l

the conclusion of.the evaluation, any generic findings'that evolved as a result

'of the evaluationLwere discussed with those members of your staff identified =in

thr. Closed report.

.

<

As evaluated =by the NRC, six of twelve operators failed one or more segments-of

,

the examination, and one crew failed the simulator portion of the examination.

'

,

As a result of this evaluation, your requalification program has been assigned-

an overal1 }rogram rating of " unsatisfactory." The evaluation was conducted in

accordance with the criteria of NUREG-1021, ES-601, noted above. The six'

)

operators and one crew who failed the examination were immediately removed.from

.

shift operational duties and assigned to an upgrade training program designed

-

L

ito-address individual or crew specific needs.

Return to licensed duties shall

not-occur until after satisfactory reexamination by the NRC.

By letter dated September. 22, 1989, the licensee.provided to the NRC a basis

.

'

for continued operation.in response to the unsatisfactory requalification

'

= program evaluation. This letter addressed several interim measures implemented

Lby the: licensee to justify continued operation. These measures included brief-

ing all' operating crews on -oroper Emergency Operating Procedure (EOP) usage;

l

designating the Shift . Supervisor as the primary person responsible for assuring

4

-Technical Specification compliance; and assigning to each shift a management

representative with licensed operator training to ensure crew performance

>

consistency and verify proper E0P and procedure usage.

'

U

8912010226 891122

PDR

ADDCK 05000423

V

PNV

0FFICIAL RECORD COPY

PRELL/REQUAL RPT./10/24/89 - 0001.0.0

1

11/16/89

tl9 g

a

x

.

..

( .-

s

[

.

.

[

' Northeast Nuclear Energy-Co.

'2

i

L

-Following the completion of the examination, a meeting was held on September

"

25, 1989, at the NRC Region 1 office in King of Prussia, Pennsylvania to

-

discuss the results of the evaluation and various courses of-actions resulting

from the unsatisfactory program evaluation.

Results of this meeting are

.

t-

detailed in the enclosed report.

- During the September 25, 1989 meeting in Region 1, Northeast Nuclea'r Energy

Company (NNECO) committed.to provide a letter to the NRC identifying additional-

-I

actions =taken or planned to justify continued safe-operation of Millstone Unit

'

3..

On September 28 - 29, 1989, the NRC conducted performance assessments of two

other operating crews on the simulator to verify that the interim measures

implemented by the licensee would assure continued safe operation of Millstone,

Unit 3.

As a result of these assessments, the interim measures were found to

be satisfactory for continued operation as detailed in the enclosed report.

In a letter dated October 3, 1989, NNECO identified long term improvements to

be made in the requalification training program and rules of usage applying to=

<

Emergency Operating Procedures. This letter satisfied the NNECO commitment

made at the September 25,-1989 meeting.

In summary, the interim measures relative to continued safe operation and the

long term improvements identified by NNECO are considered acceptable; however,

the Millstone 3 requalification program rating will continue in an unsatisfac-

tory status until such time. as an NRC administered requalification exam receives

an.overall program rating of satisfactory.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosure will be placed in the NRC Public Document Room.

No reply to this letter is required.

Should you have any questions regarding

)

-this examination, please contact the undersigned at 215-337-5291.

Sincerely,

1

, Original Signod Byr

!

Robert M. Gallo, Chief

i

Operations Branch

Division of Reactor Safety

.

'

Enclosure:

Requalification Program Evaluation Report No. 50-423/89-09

(OL-RQ) w/ Attachments 1, 2, 3, 4, 5, 6, 7 and 8:

!

!

.; ,

^7

- 1

,

,

_

x

'

,

.

.e

!

L

.NortheastNuclearlEnergyCo.

3

-

.

o

cc w/ enclosure; with Attachments 1, 2,-3, 4,.5, 6, 7 and 8:

S. E. Scace,' Station Superintendent'

~

,

_ R. Stotts,-Training Supervisor

,

i'

>

W. Raymond, Senior Resident Inspector

'

Public' Document; Room (PDR)'

-

<

' Local Public Document Room (LPDR)

,

. Nuclear Safety Information Center (NSIC)

'

!

State of Connecticut

1

..

>

F..

-bec w/ enclosure and.' Attachments 1, 2, 3, 4,.5, 6, 7,-:and 8:

Master Exam File

-

II

_

-bec w/ enclosure;'without Attachments 1 through 8:-

"

-

Region 1 Docket Room (w/ concurrences)

<

'

Chief, OLB DLPQE,:NRR-

. Chief, Examination Development Section, OLB

D._.Haverkamp, DRP Section-Chief

P.- Eselgroth, DRS

l

J. Prell' Chief Examiner, DRS

'

,

6-

18. Hughes, Examiner, DRS

N. Jensen, Examiner (EG&G)-

-

B. Picker, Examiner (EG&G)

'.

'

'l

OL File

.DRS Files (3 copies)

bec w/o enclosure and w/o Attachments.1 through 8:

a

Management Assistant, DRMA

~~

,

i L

I

'

. .DRS ': RI

Dr$:

~ Prell/dmg/ajk

th

G 114

.;

'(' y' *

ys2o'f(1

l0

h

bljhlY

'

l!

I

l

L

.*

!

,

,

.~

..

.

.

-

77

-

-~

,

J, . >

^

'

'

,

,

.

.-

.

y.b'

Northeast. Nuclear Energy Company

3

r

u.

,

'

&

'

bec' w/ enclosure and- Attachments .-1, 2, 3, _4, 5, 6,- 7, and 8:

Master Exam File

>

l

bec w/ enclosure; without' Attachments 1_through 8':

. Region 1; Docket Room (w/ concurrences)

Chief., OLB DLPQE,= NRR--

'

Chief, Examination Development Section, OLB

~

D, Havsrkamp, DRP Section Chief

1

P. Eselgroth, DRS-

'

,_

,

'

"

J.-Prell, Chief Examiner, DRS

B, Hughes, Examiner, DRS

.'

',

'

N, Jensen, Examiner (EG&G)

!

B, Picker, Examiner (EG&G).

0L File-

~

1

't

DRS. Files (3 copies)

bec w/o enclosure and w/o Attachments 1 through 8:

' Management Assistant, DRMA-

'

s

9

t-

i

i

/

I

DRS:RIV

FC 4

,,

'f

11/dmg

Eselg oth

p

vf-

/24/89

-: {7 gj M

,

.3\\

i

,

0FFICIAL RECORD COPY

PRELL/REQUAL RPT./10/24/89 - 0003.0.0

10/30/89

~

.

l

.

6

'