Approves Util 891116 Request for Temporary Waiver of Compliance from Tech Specs for Reactor Head Spray Containment Isolation Valves & Primary Containment Leakage Test Penetrations for Reactor Vessel Head Spray
ML19332D164
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 11/20/1989
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Kovach T
COMMONWEALTH EDISON CO.
References
NUDOCS 8911300103
Download: ML19332D164 (3)


Text

{{#Wiki_filter:, neateg\\ + UNITED STATES f.. NUCLEAR RESULATORY COMMISSION c -{ .j wAsmwovow, n. c. eosos \\ ****f F November 20, 1989 Docket No. 50-254 Mr. Thomas J. Kovech - Nuclear Licencing Manager Commonwealth Edison Company i Post Office Box 767 Chicago, Illinois 60690 l

Dear Mr. Kovach:

SUBJECT:

TEMPORARY WAIVER OF COMPLIANCE FROM TECHNICAL SPECIFICATIONS i FOR REACTOR HEAD SPRAY CONTAINMENT ISOLATION VALVES, AND PRIMARY CONTAIMMENT LEAKAGE TEST PENETRATIONS FOR THE REACTOR VESSEL HEAD SPRAY AND CONTROL ROD DRIVE RETURN LINES AT QUAD CITIES, UNIT 1 Dy letter dated November 16, 1989, Commonwealth Edison Comoany (CECO) requested a temporary waiver of cog 11ance for Quad Cities, Unit 1, from Technical i Specification (TS) 3.7.D.1, related to reactor head spray containment isolation valves and from Technical Specifications 3.7. A.2 and 4.7. A.2 that requires l Type B and C testing for all primary containment valves and penetrations. i Quad Cities TS 3.7.D.1 currently requires that all containment isolation valves listed on Table 3.7-1 (including reactor head spray) to be operable during reactor operations. Reactor head spray valves MD-1001-60 (outboard) and MO-1001-63 (inboard) were removed, and the line blanked, during the current Unit 1 outage. Consequently, the provisions of TS 3.7,0.1 can no longer be met. I Table 3.7.2 of the Quad Cities, Unit 1, Technical Specification contains a listing of primary containment leakage test penetrations, included in this listing are the reactor Tessel head spray and the control rod crive return f line pipe penetrations. During the current outage, the piping for these systems was removed from the corresponding penetration and a welded cap installed on i the interior side of the' containment. The welded caps installed are now the primary containment boundary, and as a result, these penetrations are no longer subject to Type B or C testing as described in Appendix J. Consequently, the provisions of TS 3.7.A.2 and 4.7.A.2 are no longer applicable. l We have reviewed Ceco's request for a temporary waiver of compliance and their application for amending Table 3.7-1 to remove reactor head spray valves from the list of required primary containment isolation valves, and Table 3.7-2 to remove the reactor vessel head spray and the control rod drive return lines I from the list of primary containment leakage test penetrations. Based upon this preliminary review, we concluded that primary containment isolation has not been compromised. -Therefore, compliance with these TS sections and tables for the reactor head spray valves and penetrations for the reactor head spray 8911300103 891120 Y0{ PDR ADOCK 05000254 l P PDC

)L ~ ,e. Mr. Thomas J. Kovach 2 November 20,' 1989 and the control rod drive return lines is no longer germane. On this basis, we approve of CECO's request for a temporary waiver of compliance from TS 3.7.0.1 TS 3.7. A.2, and TS 4.7. A.2 to be in effect for no more than 70 days from the date of this letter. Within the 70 days, we will issue an amendment removing the identified valves and penetrations from the Quad Cities TS. Any potential enforcement action as a result of CECO's failure to obtain prior approval of these modifications pursuant to the requirement of 10 CFR 50.59 will be addressed at a later date. Sincerely, 2o$ik Assistant Directer for Region III Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page Distribution g6 NRC & Local PDRs PDIII-2~r/f GHolahan LLuther TRoss JCraig JZwolinski EJordan ACRS(10) ADavis, RIII WShafer, RIII GHill(4) [1EMPORARYWAIVER] LA:PDIII-2 PM:PD111-2

PDill-2
D-LLutherMA TRoss:t Craig JZwolinski 11/Jo/89 11/w/89 11/2o/89 11/ 1789

)t ~ 9 f l f ' Mr. Thomas J.' Kovach Quad Cities Nuclear Power Station Cosmonwealth Edison Company Units 1 and 2 i cc: i Mr. Stephen E. Shelton i Vice President l Iowa-Illinois Gas and Electric Company f P. O. Box 4350 l Davenport, Iowa 52808 Michael 1. Miller, Esq. Sidley and Austin One First National Plaza i ' Chicago, Illinois 60603 Mr. Richard Bax Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North i Cordova, Illinois 61242 Resident Inspector U. S. Nuclear Regulatory Comission -22712 206th Avenue North j Cordova, Illinois 61242 i Chairman Rock Island County Board i of Supervisors 1 1504 3rd Avenue f Rock Island County Office Bldg. Rock Island, Illinois 61201 Illinois Department of Nuclear Safety f Office of Nuclear facility Safety i 1035 Outer Park Drive Springfield, Illinois 62704 l . Regior.al. Administrator, Region III U. S. Nuclear Regulatory Comission 3 799 Roosevelt Road, Bldg. e4 Glen Ellyn, Illinois 60137 ) b i i e s v .~,.,--e. n. ,..._~,._n-. ,.. -,-..., -.,~, e}}