Forwards Insp Rept 50-461/89-36 on 891002-26 & ll08.No Violations Noted
ML19332C856
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/21/1989
From: Cooper R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hall D
ILLINOIS POWER CO.
Shared Package
ML19332C857 List:
References
NUDOCS 8911290085
Download: ML19332C856 (2)


See also: IR 05000461/1989036

Text

Eo,p.

Ot

. _.

_

-

t

,

...

4

i

NOV 211989

'

i;

Docket No. 50-461

l

-Illinois Power Company

ATTN:-- Mr. D.;P. Hall

Senior Vice President

Clinton Power Station

-

Mail Code V-275

P. O. Box 678

'

'Clinton, IL 61727

Gentlemen:

This refers to'the routine inspection conducted by Mr. M. P. Huber of this

office on October 2 through 26 and November 8, 1989, of activities at Clinton

the Power Station, authorized by NRC Operating License No. NPF-62 and to the

discussion of our findings with Mr. J. Weaver at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

'

examination of procedures and representative records, observations, and

interviews _with personnel.

This inspection was conducted to review testing

of Standby Liquid Control System (SLCS) components.

,

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this 1~etter and the enclosed inspection report will be placed in the NRC

Public Document Room.

..

We will gladly discuss any questions you have concerning this inspection.

'

Sincerely,

,

Original signed by D. H. Danielson (for)

R. W. Cooper, II, Chief

Engineering Branch

-Enclosure:

Inspection Report

No. 50-461/89036(DRS)

Sa_e Attached Distribution

'

yn

RIII

R

RIII

m

,

1'

C4U}n

W

b

l

Hub / jaw

Ring

&nielson

robe

Avcoopgr

Ji.t ].h

suje?

l

to}2.*/<ff

?

8911290083 991121

)x

PDR2 ADOCK.05000461

l-

PDC {

V {]

O

,_

..

,

s ,9

,,

,

L

.

.

.

Illinois. Power Company _

2

NOV 211989

Distribution

cc w/ enclosure:

J.-S.PerryIdent

Assistant

Vice Pres

F..A. Spangenberg,, Manager

_

.

i.

Licensing and Safety Department-

.DCD/DCB (RIDS)

Licensing Fee Management Branch

-Resident Inspector, RIII-

L

J. W. McCaffrey, Chief, Public

. Utilities Division

H. S. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers

David Rosenblatt,' Governor's

-

!

..

Office of Consumer Services

-

'

Sheldon Zabel, Esquire,

. Schiff, Hardin, & Waite

L. Larson, Project Manager,

General Electric Company

,

Chairman of DeWitt County

. Illinois Department of

Nuclear Safety

'

D. Schopfer, Project Manager,

'

-Sargent & Lundy Engineers

~

L

!-