ML19332C856
| ML19332C856 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 11/21/1989 |
| From: | Cooper R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hall D ILLINOIS POWER CO. |
| Shared Package | |
| ML19332C857 | List: |
| References | |
| NUDOCS 8911290085 | |
| Download: ML19332C856 (2) | |
See also: IR 05000461/1989036
Text
Eo,p.
Ot
. _.
_
-
t
,
...
4
i
NOV 211989
'
i;
Docket No. 50-461
l
-Illinois Power Company
ATTN:-- Mr. D.;P. Hall
Senior Vice President
Clinton Power Station
-
Mail Code V-275
P. O. Box 678
'
'Clinton, IL 61727
Gentlemen:
This refers to'the routine inspection conducted by Mr. M. P. Huber of this
office on October 2 through 26 and November 8, 1989, of activities at Clinton
the Power Station, authorized by NRC Operating License No. NPF-62 and to the
discussion of our findings with Mr. J. Weaver at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
'
examination of procedures and representative records, observations, and
interviews _with personnel.
This inspection was conducted to review testing
of Standby Liquid Control System (SLCS) components.
,
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this 1~etter and the enclosed inspection report will be placed in the NRC
Public Document Room.
..
We will gladly discuss any questions you have concerning this inspection.
'
Sincerely,
,
Original signed by D. H. Danielson (for)
R. W. Cooper, II, Chief
Engineering Branch
-Enclosure:
Inspection Report
No. 50-461/89036(DRS)
Sa_e Attached Distribution
'
yn
RIII
R
RIII
m
,
1'
C4U}n
W
b
l
Hub / jaw
Ring
&nielson
robe
Avcoopgr
Ji.t ].h
suje?
l
to}2.*/<ff
?
8911290083 991121
)x
- PDR2 ADOCK.05000461
l-
PDC {
V {]
O
,_
..
,
s ,9
,,
,
L
.
.
.
Illinois. Power Company _
2
NOV 211989
- Distribution
cc w/ enclosure:
J.-S.PerryIdent
Assistant
Vice Pres
F..A. Spangenberg,, Manager
_
.
i.
Licensing and Safety Department-
.DCD/DCB (RIDS)
Licensing Fee Management Branch
-Resident Inspector, RIII-
L
J. W. McCaffrey, Chief, Public
. Utilities Division
H. S. Taylor, Quality Assurance
Division, Sargent & Lundy
Engineers
David Rosenblatt,' Governor's
-
!
..
Office of Consumer Services
-
'
Sheldon Zabel, Esquire,
. Schiff, Hardin, & Waite
L. Larson, Project Manager,
General Electric Company
,
Chairman of DeWitt County
. Illinois Department of
Nuclear Safety
'
D. Schopfer, Project Manager,
'
-Sargent & Lundy Engineers
~