ML19332C680

From kanterella
Jump to navigation Jump to search
Discusses 891107 Mgt Meeting W/Util in Region IV Ofc Re Activities Authorized by License NPF-38.Meeting Beneficial & Provides Better Understanding of Performance During Past SALP
ML19332C680
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/15/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8911280414
Download: ML19332C680 (5)


Text

..

y;e g 9 - s;

(

^

2"

>,pc -

NOV 15 MB 4.

In Reply Refer To:

Docket: S0-382 e,

Louisiana Power & Light Company ATTN:

J. G. Dewease, Senior Vice President Nuclear Operations e

317 Baronne Street' New Orleans, Louisiana 70160 s

Gentlenen:

This refers to the Management Meeting conducted at your request in the NRC Region lY office on November 7, 1989. This meeting related to activities authorized by NRC License No NPF-38 for Waterford Steam Electric Station,

]

Unit 3, and was attended by those on the attached Attendance List.

The subjects discussed at this meeting are described in the enclosed Meeting Sunenary.

It is our opinion that this meeting was beneficial and has provided a better understanding of your performance during the past Systematic Assessment of Licensee Performance (SALP) period, in accordaace with Section 2.790 of the NRC's " Rules of Practice " Part 2. Title 10. Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions concerning thir, matter, we will be pleased to discuss them with you.

Sincerely, 5

Samuel J. Collins, Director Division of Reactor Projects

Enclosure:

Meeting Summary w/ettachments cc w/ enclosure:

Louisiana Power & Light Company ATTN:

R. P. Barkhurst, Vice President Nuclear Operations P.O. Box B Killona Louisiana 70066

  • RIV:DRP/A
  • C:DRP/A
DRP ATHowellidf DDChamberlain g-SJCol) ins 11/ /89 11/ /89 U 11//5/89 g
  • previously concurred

\\

e,21 - 14 ee111s PDR ADOCK 05000 3e2 PDC

a i

V

c i,,,
n. G,...

y Louisiana Power &' Light Company 'j e

Louisiana Power & Light Company ATTN:. J. R. ' McGaha, Jr., Plant Manager 7

F P.O. Box B Killona, Louisiana 70066,

im I;

Louisiana, Power & Light Company I

ATTN:: L. W. Laughlin, Site Licensing Support Supervisor.

P.O. Box B.

Killona, Louisiana 70066 Louisiana Power & Light Company 1 ATTN:

G. M. Davis, Manager, Events Analysis Reporting & Response

'j P.O. Box B.~

~

Killona, Louisiana-70066

+

Nonroe & Leman ATTN:' W. Malcolm Stevenson, Esq..

' 201 St. fCharles Avenue, Suite 3300

'T,1

.- New Orleans, Louisiana. 70170-3300

, Shaw. Pittman, Potts & Trowbridge.

,ATTH:- Mr. E. Blake

2300 N Street, NW l

Washington, D.C.

20037 Middle. South Services Inc.

s

  • ATTN:l' Ralph T. Lally, Manager

.g,

of Quality Assurance J

P.O. Box'61000

..J New Orleans. Louisiana 70161-Chairman Louisiana Public Service Consnission

' One' American Place Suite 1630 Baton > R'auge Louisiana 70825-1697 Louisiana Power & Light Company R. F. Burski, Manager, Nuclear

' ATTN:

s l

Safety and Regulatory Affairs 317 Baronne Street

. New Orleans, Louisiana 70112 L

Department of Environmental. Quality ATTN: William H. Spell, Administrator 1-

. Nuclear Energy Division P.O. Box'14690 Baton Rouge, Louisiana 70898 4

r 1:.

n.

?~<

P

[

Louisiana Power & Light Company,

L p

President. Police Jury -

St. Charles Parish Hahnville. Louisiana 70057 i

Mr. William A. Cross-

'l Bethesda Licensing 0ffice 3 Metro Center i

Suite 610 i

Bethesda, Maryland 20814 j

bectoDMB(1E45) bec distrib, by RIV:

R. D. Martin Resident Inspector SectionChief(DRP/A)

DRP j

DRSS-FRPS-MIS System 1

Project Engineer (DRP/A)-

RSTS Operator RIV File

'DRS D. Wigginton,' NRR Project Manager (MS:

13-D-18) Lisa Shea, RM/ALF i

d 4

i h

i

m

(: -

~1

f. I.,

I

=

4 ATTENDANCE LIST

. Attendance at the Mana ement Meeting between Louisiana Power & Light Company and NRC on November 7,198,'in the Region IV office:

Louisiana Power & Light Company J. G. Dewease, Senior.Vice President - Nuclear Operations R.- P. Barkhurst, Vice President - Nuclear Operations J. R. McGaha, Plant Manager - Nuclear Operations R. F. Burski, Manager, Nuclear Safety & Regulatory Affairs D. F. Packer, Assistant Plant Manager, Operations and Maintenance R. W. Lailheugue, Manager, Plant Administration F. J. Englebracht, Manager, Nuclear Emergency Planning & Records D. Haase, Security Superintendent - Nuclear NRC Region IV S. J. Collins, Director, Division of Reactor Projects (DRP)

L. J. Callan Director, Division of Reactor Safety (DRS)

T. P. Gwyr.n Deputy Directer, DRP J. P. Jaudon, Deputy Director, DRS L. A. Yandell, Deputy Director, Division of Radiation Safety and Safeguards D. D. Chamberlain,. Chief, Project Section A, DRP A. T. Howell, Project Engineer, DRP W. F. Smith, Senior Resident Inspector, DRP S. D. Butler, Resident Inspector, DRP NRC Office of Nuclear Reactor Regulation l

F. J. Hebdon, Director, Project Directorate IV l

l l

1 i

l l

i I

n

[e e

i f>

p r

MEETING

SUMMARY

l Licensee:

Louisiana Power & Light Company (LP&L)

Fac'111ty:

Waterford Steam Electric Station Unit 3 (Waterford 3) l License No.:

NPF-38

+

i Docket No.:

50-382

[,

Subject:

MANAGEMENT. MEETING CONCERNING LP&L'S ASSESSMENT OF ITS PERFORMANCE AT WATERFORD 3 DURING THE PAST SALP PERIOD I

On November 7,1989, representatives of LP&L met with Region IV personnel in Arlington, Texas, to discuss LP&L's assessment of its performance at Waterford 3 in each of the seven SALP functional areas during the past SALP i

period. This assessment was for the period August 1,1988, through October 31, 1989. The Attendance List and licensee presentation are attached to this surwa ry.

Attachments:

i 1.

Attendance List 2.

Licensee presentation (NRC distribution only) i i

,4.

O h

h.

6

_