Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000317/LER-1999-006, :on 990922,manual Reactor Trip Was Noted.Caused by Inadequate Electrical Current Determination.Evaluated Trip Risk Assessment Process for Enhancements.With1999-10-22022 October 1999
- on 990922,manual Reactor Trip Was Noted.Caused by Inadequate Electrical Current Determination.Evaluated Trip Risk Assessment Process for Enhancements.With
ML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With 05000317/LER-1998-011, :on 980428,prematurely Released Fire Watch Was Noted.Caused by Inadequate Cure Time Communications.Revised Configuration Control Documents.With1999-09-20020 September 1999
- on 980428,prematurely Released Fire Watch Was Noted.Caused by Inadequate Cure Time Communications.Revised Configuration Control Documents.With
ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20211J3531999-09-0101 September 1999 Safety Evaluation Supporting Amends 231 & 207 to Licenses DPR-53 & DPR-69,respectively ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr 05000317/LER-1999-004, :on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With1999-08-23023 August 1999
- on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With
05000317/LER-1999-005, :on 990720,corrosion Behavior & Onset of Oxide Spalling of High Duty Fuel Noted on Fuel Assemblies.Caused by Normal Phenomenon.Operability Evaluation for Current Cycle Operation Will Be Performed.With1999-08-23023 August 1999
- on 990720,corrosion Behavior & Onset of Oxide Spalling of High Duty Fuel Noted on Fuel Assemblies.Caused by Normal Phenomenon.Operability Evaluation for Current Cycle Operation Will Be Performed.With
ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with 05000317/LER-1999-003, :on 990701,recognized That Unapproved Methodology Was Used to Allow CREVS to Remain Operable in accept-as-is Condition.Regulatory Notification Required in 10CFR50.72(b)(1)(ii)(A) Performed.With1999-07-30030 July 1999
- on 990701,recognized That Unapproved Methodology Was Used to Allow CREVS to Remain Operable in accept-as-is Condition.Regulatory Notification Required in 10CFR50.72(b)(1)(ii)(A) Performed.With
ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-039, Part 21 Rept Re Defect of ABB 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of ABB 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified LD-99-035, Part 21 Rept Re ABB 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re ABB 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with 05000317/LER-1999-002, :on 990401,discovered That Radioactive Sources Were Lost.Caused by Inadequate Control.Searched Storage Locations on Three Separate Occasions,Including Document Storage Locations.With1999-05-25025 May 1999
- on 990401,discovered That Radioactive Sources Were Lost.Caused by Inadequate Control.Searched Storage Locations on Three Separate Occasions,Including Document Storage Locations.With
ML20206U7031999-05-18018 May 1999 Rev 1 to Ran 97-031, Main CR Fire Analysis for IPEEE Section 4-1 ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on ABB CE ECCS Performance Evaluation Models ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20205J8331999-04-0707 April 1999 Safety Evaluation Concluding That Security Lighting,Portable Lighting & Helmet Lights,As Described by Licensee Satisfies Underlying Purpose of 10CFR50,App R,Section Iii.J.Grants Licensee Request for Exemption ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20204B5961999-03-17017 March 1999 Corrected Page 7 to SER for Amend 205 for License DPR-69. Staff Deleted Word Not on Line One of Page 7 ML20207L2991999-03-0808 March 1999 Safety Evaluation Supporting Amend 205 to License DPR-69 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons 05000317/LER-1997-010, :on 971210,1B EDG Failed to Start During Performance of Routine Surveillance Test.Caused by Piece of Stainless Steel Foreign Matl in Governor Hydraulic Boundaries.Stainless Steel Replaced.With1999-01-29029 January 1999
- on 971210,1B EDG Failed to Start During Performance of Routine Surveillance Test.Caused by Piece of Stainless Steel Foreign Matl in Governor Hydraulic Boundaries.Stainless Steel Replaced.With
ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 05000317/LER-1998-009, :on 980408,required Hourly Fire Watch Missed, When Contractor Maint Worker Failed to Perform Fire Watch Patrol.Caused by Personnel Error.Plant Mgt Reiterated Expectation to Contractor Personnel.With1999-01-0808 January 1999
- on 980408,required Hourly Fire Watch Missed, When Contractor Maint Worker Failed to Perform Fire Watch Patrol.Caused by Personnel Error.Plant Mgt Reiterated Expectation to Contractor Personnel.With
ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative 05000317/LER-1998-008, :on 981020,reactor Protective Sys Instrumentation TS Error Was Noted.Caused by Incorrect Use of Thermal Power in Ts.Revised TSs 3.3.1 & 3.3.2.With1998-11-11011 November 1998
- on 981020,reactor Protective Sys Instrumentation TS Error Was Noted.Caused by Incorrect Use of Thermal Power in Ts.Revised TSs 3.3.1 & 3.3.2.With
ML20195D4271998-11-0505 November 1998 Safety Evaluation Supporting Amend 203 to License DPR-69 ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With 1999-09-30
[Table view] |
Text
'
g
~ -
E BALTIMORE GASAND ELECTRIC l
CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 LEON B. RUSSELL L
uu,aota
.c.atvt.t etm wuctsan cowtn etant conmuer November 13. 1989 l
U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk SUILTECT:
Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Dockets 50 317 and 50 318 M gr 1989 Oncratine Data Reports Centlemen:
The subject report.s are being sent to you as required by Technical Specification 6.9.1.6.
I Should you have any further questions regarding this matter, please contact Lloyd Wenger at (301)260 4867.
Very truly yours,
'LBR/CB/peu
\\
m j
f)
-Attachments L ()
cc:
D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC S. A.-McNeil, NRC W. T.. Russell, NRC D. F. Limroth/.1. A. Colla, Jr., NRC I
T. Magette, DNR.
W.11. Lovelace, NRC R. Cibbard, DOE J. Wheelock, INPO J. E. Baum, CE C
0 7
M k
R l
I a
3_
s l
H l
0006"'ee*****Ce******************************************w******************
l UNIT 1 OPERATING DATA REPORT COG**w**be***6*****s********************************************************
)
Docket No. 50-317 November 13, 1989 Prepared by Carl Behnke Telephone:(301)260-4871 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 1
+
- 2. REPORTING PERIOD.
OCTOBER 1989
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
'5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMGM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS none
- 9. POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative
- This monthYear-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 745 7,296 126,973
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1,806.6 94,592.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 0.0 1,729.1 92,448.6
- 15. UNIT RESERVE SHUTDONN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 4,227,084 232,691,250
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 1,410,290 77,419,117
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,345,618 73,545,810
'19. UNIT SERVICE FACTOR 0.0 23.7 72.8 i
- 20. UNIT AVAILABILITY FACTOR 0.0 23.7 72.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 22.4 70.2
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 21.8 60.5
- 23. UNIT FORCED OUTAGE RATE 0.0 2.9 9.5
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
December 29, 1989 L
a
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCRET NO. 50-317 UNIT NAME Calvert Cliffs-U1 DATE November 13. 1989 COMPLETED BY Carl Behnke REPORT MONTH October 1989 TELEPHONE (301)260-4871 i
METHOD OF DURATION' SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE I
2 NO.
DATE TYPE (HOURS)
REASON DOW EVENT ACTION TO 4
S REACTOR REPORT #
CODE CODE PREVENT RECURRENCE 89-13 891001 S
745 B
N/A N/A CA HEATER Continued shutdown. Completing investigation of leakage from Unit 2 Pressurizer Heater Sleeves and an Instrument Nozzle.
- 1. Axial through wall. cracks were identified in Unit 2 sleeves and a nozzle.
2.. Cracks were2 characterized as Primary Water Stress Corrosion Cracks initiated by high stress imposed in the material during fabrication of the pressurizer.
- 3. Submitted and presented an analy M.s to NRC which states thar <he material defects in Unit _ may be applicable to Unit 1, but Unit 1 can be safely operated.
1 2
0 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras.
Entry Sheets for License C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NUREG-Ol61)
E-Operator Training & License Examination F-Administrative Edit it I - Ss.ne Source G-Operational Error (Explain)
H-Other (Explain)
4 i
- -J p
AVERAGE DAILY UNIT POWER LEVEL
i Docket No. 50-337 Calvert Cliffs Unit No. 1 November 13, 1939 Completed by Carl Behnke Telephone: (301) 260-4871 OOTOBER 1989
Average Daily Power level Average Daily Tower Level Day (MWe-Net)
Day (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
+
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
2S O
10 0
26 0
11 0
27 0
12 0
28 0
13 t
29 0
14 0
30 0
15 0
31 0
16 0
i
b-
,t, i
n k
4..
j-s' t
+
{
x i
l i
DOCKET # $0-317 i
CALVERT CLIFFS - UNIT.1
(
November 13, 1989 f
-StMMARY OF OPERATING EXPERIENCE October 1989
'I Unit 1'bagan the month in a maintenance shutdown pending NRC agreement with the analysis presented to NRC Staff on September 25.
This analysis stated that the
-l material defects in Unit 2 were applicable to Unit 1, but Unit I could be safely operated.
I Numerous maintenance activities, including pressurizer close out, are currently in progress.
The' unit is expected te begin heat-up in mid December for a
[
start up on December 29, 1989.
j i
P I
k Y
l t
1 l..
t e
i k
i I:
i-L
~
~
+
November 6, 1989 r
REFUELING INFORMATION REQUEST l
1.
Name of facility:
Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
Scheduled date for next rcfueling shutdown:
March 15, 1991 3.
Scheduled date for restart follnwing refueling: May 26, 1991 4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other licenst anendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a higher enriched (4.3%) reload batch and reshuffled core for Unit l's next 24 month cycle, 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
November 1,.1990
( reload submittal )
6.
Important licensing considerations associated with the refueling.
1 Reload fuel will be similar to reload fuel inserted into the previous cycle except for the higher enrichment ( 4.3% ).
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1543 Spent fuel pon1s are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size l
of any increase in licensed storage capacity that has been requested or is l
planned, in number of fuel assemblics.
(a) 1830 (b) 2880 9.
The projected date of the last refueling that can be discharged to the Spent Feel Pool assuming the present licensed o.pacity and maintaining j
space for one full core off-load.
Spring 1993
- has changed since last report L
l L
p-
~
c ccoo*****************************+****************=****we*******************
UNIT 2 OPERATING DATA REPORT coco ************************************************************************
Docket No. 50-318 November 13, 1989 Prepared by Carl Behnke Telephone: (301) 260-4871 OPERATING STATUS b
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD OCTOBER 1989
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 l
- 5. DESIGN ELECTRICAL RATING (HET MWe)-
845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS none
- 9. POWER LEVEL TO WHICH RESTRICTED n/a i
- 10. REASONS FOR RESTRICTIONS n/a Cmaulative
- This monthYear-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 745 7,296 110,328
.12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1,766.4 87,437.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 0.0 1,732.1 86,228.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH)'
O 4,530,744 218,389,418
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 1,512,000 72,294,632
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,448,457 69,042,571
- 19. UNIT SERVICE FACTOR 0.0 23.7 78.2 20.-UNIT AVAILABILITY FACTOR 0.0 23.7 78.2
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 24.1 75.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 23.5 74.1
- 23. UNIT FORCED OUTAGE RATE 0.0 11.2 5.3-
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
Spring 1990 T
UNIT SHUTDOWNS AND POW 5R REDUCTIONS DOCKET NO. 50-318 UNIT NAME Calvert Cliffs-U2 DATE November 13. 1989 COMPLETED BY Carl Behnke REPORT MONTH October 1989 TELEPHONE (3011260-4871 METHOD OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE I
2 NO.
DATE TYPE (HOURS)
REASON DOWN EVENT ACTION TO 3
b S
REACTOR REPORT #
CODE CODE PREVENT RECURRENCE 89-11 891001 S
745 C
N/A N/A Completing investigation of leakage from Unit 2 Pressurizer Heater Sleeves and an Instrument Nozzle.89-007 CA FEATER
- 1. Axial through wall cracks were identified in Unit 2 sleeves and a nozzle.
- 2. Cracks were characterized as Primary Water Stress Corrosion Cracks initiated by high stress imposed in the material during fabrication of the pressurizer.
- 3. Replacement of 120 heater sleeves is in progress.
1 2
3 0
F:
Forced Reasor.:
Method:
Exhibit G-Instructions 5:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for License C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NUREG-0161)
E-Operator Training & License Exac.ination 5
F-Administrative Exhibit I - Same Source G-Operational Error (Explain)
H-Other (Explain)
r I
- e AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 November 13, 1989 Completed by Carl Behnke Telephone: (301) 260-4871 OCTOBER 1989
Average Daily Power Level Average Daily Power Level Cay (MWe-Net)
Day (MWe-Net) 1 0
1*/
0 2
0 18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
'8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
~
.Q ~~
?,y o;r h - ;, f '
p-l:
r I-.
.I
-DOCKET f 50-318
[
CALVEKT CLIFFS - UNIT 2
[
November 13, 1989-t i
SUMMARY
OF OPERATING EXPERIENCE I.
October 1982
[
t" r.
U
- Unit 2 was shutdown for the month for the 8th cycle scheduled refueling on age.
[
c i-I 13us pressurizer investigation identified cracks or crack indications in 18 of 28 I-pressurizer heater sleeves that were initially designated as leaking. All l
i: ~
cracks were axial and confined to the top 2 inches of the-sleeves. Three axial i
+
cracks were identified in the leaking pressurizer instrument nozzle at the insido of pressurizer.
The cracks were characterized as Primacy Water Stress Corrosion Cracks since the material microstructure and fabrication history i
suggests a susceptibility to this form of attack.
All 120 pressurizer heater sleeves are currently being replaced.
The Unit is scheduled to return to service in the Spring of 1990.
j
[
t 1
i i
t f
O i
I L
1.'
4 i
November 6, 1989 l
REFUELING INFORMATION REQUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2.
Scheduled date for next refueling shutdown: March 20, 1989 **
kcheduled date for restart following refueling: Spring 1990 3.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical l
Specifications. The changes will be such as to allow operation of the plant with a reload batch and reshuffled core at a higher enrichment.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
February 9, 1989
( reload submittal )
April 21, 1989
( updated reload submittal )
6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to reload fuel inserted into the previous cycle except for the 4.3% enrichment, debris resistant fuel design, and four fuel assemblies containing an alternative burnable absorber.
Changes will be made to the on line incore monitoring program.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 0 (b) 1543 Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b) 2880 The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load, spring 1993
- entry has changed since last reported Unit currently in refueling shut down
-.