ST-HL-AE-3296, Monthly Operating Repts for Oct 1989 for South Texas Units 1 & 2
| ML19332C470 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/31/1989 |
| From: | Kent A, Mcburnett M HOUSTON LIGHTING & POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ST-HL-AE-3296, NUDOCS 8911280168 | |
| Download: ML19332C470 (14) | |
Text
,
4 4
4
.,s i
, The Light 1
P.0, Box 1700 Houston. Thas 77001 (713) 228 9211 E caton Lighting & Power ___._.
L 4
November 15, 1989 ST-HL-AE 3296 File No.: G02 10CFR50.71
^
U. S. Nuclear Regulatory Commission Attention:
Document Control Desk
- Washington, DC--
20555 South-Texas Project Electric Generating Station Units 1 6 2 Docket Nos. STN 50 498'& 50-499 Month 1v Ooerr. ting Reports for October. 1989 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly i
Operating Reports.for October, 1989.
If yoti should have any questions on this matter, please contact -
Mr. C. A. Ayala at (512) 972-8628.
nett Manager Support Licensing i
i MAM/BEM/n1 Attachments:
.1)
STPEGS Unit 1 Monthly Operating Report - October, 1989 2)
STPEGS Unit 2 Monthly Operating Report - October, 1989
.i 1.
l 091'1280168 891031 p).]
DR ADOCK 0500 93 A1/023.NL5 A Subsidiary of Houston Industries incorporated
.ac
c P
L
.1 ST-HL-AE 3296 Houston Lighting & Power Company File No.: CO2 m'"
' South Texas Project Electric Generating Station Page 2 cc:
r Regional Administrator Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel y
611'Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 1700 llouston, TX 77001
- George Dick, Project Manager -
' U.S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 circle 75 Parkway J. I. Tapia.
Atlanta, GA 30339-3064
- Senior Resident Inspector c/o U. S. Nuclear Regulatory Dr. Joseph M. Hendrie Commission 50 Be11 port Lane P. 0.' Box 910 Be11 port, NY 11713 Bay City, TX-77414 D. K. Lacker J. R. Newman, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C.
Texas Departmen* of Ilealth 1615 L Street, N.W.-
1100 West 49th Street Washington, DC 20036 Austin, TX 78704 R. L. Rango/R P. Verret Central Power & Light Company P. 0.' Box 2121 Corpus Christi, TX 78403 J.LC. Lanier Director of Cenerations City of-Austin Electric Utility 721 Barton Springs Road Austin,1DC 78704
- R. J. Costello/M. T. Hardt City.Public Service Board P. O. Box 1771 L
San' Antonio, TX 78296 1'
Revised 11/15/89 i
L4/NRC/
n.
n Q
i.,
' k, ATTACHMENT I
I
. ST HL AE 321/
PAGE_.L-OE,f.-.
u
-i E
t 4
7 SOUTH TEXAS PROJECT p
ELECTRIC GENERATING STATION UNIT 1 i
MONTHLY OPERATING REPORT OCTOBER 1989 HOUSTON-LIGHTING AND POWER CO.
NRC DOCKET NO. 50-498 e
LICENSE NO.'NPF-76 j
i
"! !39 C
Reviewed r:
General Supervisor Date
// I!N Reviewed By:'P$fi[ Engineering anager
'Date Approve'd By:
h\\h
' h\\\\\\ 71
\\
Plant'fianager
-\\
bade p
1 1
pm pr
-}
s u f, L,-
b ATTACHMENT /
.ST KLAE 7[ N Monthiv Sa=<rv.
PAnr 1 OE k~
STPEGS Unit' l was returned to service following refueling on 10/19/89 at.
'1106. ' The unit remained derated until 10/29/89 for reactor performance testing and low pressure turbine stationary blade stress monitoring.
On 10/30/89 the unit' was derated to ~95% reactor power to allow maintenance.
on a feedwater pump.
i
+
L k
l C
i f
f
u4 ATTACHMENT I
. ST.HL AE. 3 2 Y OPERATINC DATA REPORT
_.P l [.tl. g O f.I.
DOCKET NO.
50 498 UNIT 1 DATE Epv. 6. 1989-COMPLETED BY 'A.P.
Rent TELEPHONE 512/972-7786 OPERATING STATUS
'1.
REPORTING PERIOD: 10/01-10/31 GROSS HOURS IN REPORTING PERIOD:
745
- 2.
CURRENTLY AUTiiORIZED POWER LEVEL (MWt):
3800 MAX. DEPEND. CAPACITY (MWe Net):
1250.6 DESIGN ELECTRICAL RATING-(MWe-Net):
1250.6 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None
'4.
REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE l
S.
NUMBER OF HOURS REACTOR WAS CRITICAL.....
407.1 4501.3 6998.2 6.
REACTOR RESERVE SHUTDOWN HOURS...........
0 0
0
-(
7.
HOURS GENERATOR ON LINE..................
311.4 4332.9 6738.9_
-8.
UNIT RESERVE SHUTDOWN HOURS..............
0 0
0 l'
9.
GROSS THERMAL ENERGY GENERATED-(MWt)..... 783890 15374296
'24188817 4
10.
GROSS ELECTRICAL ENERGY GENERATED (MWH)., 252630 5216370 8208600 11.~
NET ELECTRICAL ENERGY GENERATED (MWH).... 219398 4890335 7681827 12.
REACTOR SERVICE FACTOR...................
54.6%
61.7%
67.3%
l 13.
REACTOR AVAILABILITY FACTOR..............
54.6%
61.7%
67.3%
14.
UNIT SERVICC FACT 0R.....................
41.8%
59.4%
64.8%
l 15.
UNIT AVAILABILITY FACTOR...........
41.8%
59.4%
64.8%
16.
UNIT CAPACITY FACTOR (Using MDC).........
23.6%
53.6%
59.1%
17.
UNIT CAPACITY FACTOR (Using Design MWe)..
23.6%
53.6%
59.1%
18.
UNIT FORCED OUTAGE RATE..
0%
4.9%
7.3%
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 55 day refueling outage to begin April 7, 1990.
20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
e 4'
i.
Hi
- ATTACHMENT I ST-HL AE 11.1/
i
- 3. ;.
PArJ + OF_(_..
j I
AVERAGE DAILY UNIT POWER LEVEL
.i'
)..
5 DOCKET NO, 50-498 UNIT 1 DATE Nov. 6. 1989
- 3 COMPLETED BY A.P. Kent-
-TELEPHONE ' 512/972-7786
.c ;ITH _ OCTOEER r
i DAY
" AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1 0
17 0
2 0
18 2
3 0
19 14 l
'4 0
20 190 l:
5 0
21
' 245-6.
0 22 367 7
0 23 492 l
L 8
0 24 754
~9~
0 25 916 10.
0 26 942 l
11 0
27 974 1
' 12 '
0 28 1118 1
~13 0
29 1222 14; O
30 1219 15 0
31 1201 16 0
~.
3.
.... 3 IN-
- UNIT SHUTDOWNSTAND POWER REDUCTIONS' A~
Y DOCKET NO.
50-498 UNIT 1 DATE' Nov. 6.'1989 COMPLETED.BYiA.P! Kent TELEPHONE 512/972-7786
. REPORT MONTH OCTOBER 1
'2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component "Cause & Corrective Action to (Hours)
Shutting' Event Code Code Prevent Recurrence Down Raport #
Reactor 89-10 890805 S
410.2 C
4 N/A' N/A
.N/A Manual shutdown for refueling and scheduled maintenance.
89-11 891018 S
10.7
.B 1
N/A TA ~
.TRB Manual turbine trip due-to indications of water intrusion.
It was determined that'the cause was faulty instrumentation and no intrusion occurred. (Reactor Critical)'
89-12 891018 S
12.7 B
9 N/A TA TRB Turbine Overspeed Test. (Reactor Critical) 1 1
2 S
F: Forced Reason:
Method:
IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure-(Explain) 1-Manual B-Maintenance or Test 2-Manual' Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction
'4-Cont. of Existing E-Operator Training 6. License Exam
-Outage'
._ ATTACHMENT \\
F-Administrative 5-Reduction G-Operational Error (Explain)'
9-Other.
. ST.HL-AE-72 9 4 -
H-Other (Explain)-
PAGE S OF f i
n-____.
a
8 1
=
b, 9
n'.
ATTACHMENT /
l ST-HL AE. 72 9/ '
PORVs and Safety Valves Si ry:
pggg g gp g-
- NO PORVs or-, Safety Valves were challenged during this. reporting period.-
r F
'I i b
i t
s i
1 li
[
T I
t
/
-e w
w.
.t, h:
ATTACHMENT 2.-
T:
. ST.HL-hE 311' PAGE I OF (
L SOUTH TEXAS PROJECT t_ '
ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT OCTOBER 1989 HOUSTON LIGHTING AND POWER CO, NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Reviewed B Md b General Supervisor Datu
' Reviewed By:
//
87 l
Pl[rfdEngineering(tanager
'Da'te l
Appr'oved By:
11 D h\\85 Plant Manager-T bale #
I
'l
!^
s, l
g
g.-
c
.e 9
E.
ATTACHMENT 2.,
Monthly Su===ry
. ST-HL AE J 2. W PAGE 1 OF (
STPECS Unit 2 began the reporting period at 100% reactor power.
Reactor power was reduced to ~58% on 10/05/89 due to indications of high winding temperatures on_Open Loop Auxiliary Cooling Water pump motors. The unit returned to full power at 0140 on 10/06/89.
On 10/13/89 at 1745 a reactor / turbine trip occurred from a high neutron flux negative rate detection on two of four power range neutron monitoring channels.
The unit went back on line at 0115 on 10/16/89.-
4 t-A Notice of Unusual Event (NOUE) was declared on 10/18/89 at 1208 when a-Feedwater Isolation Valve's Nitrogen pressure was below its technical specifi-cation value. - The NOUE was terminated at 1211 on 10/18/89 when Nitrogen pressure was restored to the' valve.
.The unit concluded the report period at 100% reactor power.
l I
I e
I t
l'.
I l
'l
m+
bt L
m L '~ ATTACHMENT 2 ~~ ST HL AE J11( ,? OPERATING DATA REPORT PAGE 3 OF ( - j. DOCKET No. 50-499 UNIT 2 DATE Nov. 3. 1989 COMPLETED BY A.P. Kent 4 TELEPHONE 512/972-7786 OPERATING-STATUS 1. REPORTING PERIOD: 10/01-10/31 GROSS HOURS IN REPORTING PERIOD: 745 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800-MAX. DEPEND. CAPACITY (MWe-Net); 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None .4. REASONS FOR RESTRICTION (IF.ANY): N/A THIS MONTH. YR-TO DATE CUMULATIVE-5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 695.2 2900.8 2900.8 6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 0 7.. HOURS GENERATOR ON LINE.................. 689.5 2771.7 2771.7 8. _ UNIT R.' SERVE SHUTDOWN HOURS...-............ 0 0 0 9. CROSS THERMAL ENERGY CENERATED (MWt).... 2579773 9258454 9258454
- 10.
CROSS ELECTRICAL ENERGY GENERATED (MWH).. 873300 3124030 3124030 11. NET ELECTRICAL ENERGY GENERATED (MWH).... 832187 2946843 2946843 12. REACTOR SERVICE FACTOR................... 93.3% 89.5% 89 5% 13. _ REACTOR AVAILABILITY FACTOR.............. 93.3% 89.5% 89.5% 14. UNIT SERVICE FACT 0R...................... 92.6% 85.5% 85.5% 15. UNIT AVAILABILITY FACTOR............... 92.6% 85.5% 85.5% 16. -UNIT CAPACITY FACTOR (Using MDC)......... 89 3% 72.7% 72.7%- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 89.3% 72621 72.7% 18. UNIT FORCED OUTAGE RATE,................. 7.4% 13.0% 13.0% ,19. SHUTDOWNS SCHEDULED OVER NEX16 MONTHS (TYPE, DATE, AND DURATION OF EACH): Scheduled 44 day outage to begin November 4, 1989 for Bottom Mounted Instrumentation Inspection and Turbine Inspections. 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
7a y ,. y ATTACHMENT 1 c HA Tg OF ( AVERAGE DAILY UNIT POWER' LEVEL f DOCKET NO. -50'499 ~ UNIT '2 DATE Eov.-3. 1989 COMPLETED BY A.P. Kent TELEPHONE 512/972 7786 MONTH October 1 3 -DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)- (MWe Net) ^ ' 1-1108 17 1233 2 1237 .18 1240 -l 3 1194 -19 '1239 4 1238 20 1216 5 -. 1112 21 1243 6-1239 22 1242-7- 1242 23 1243 8 124." 24 1244 9 1247 25 1235 i 10' '1247 26-1247 ' 11' 1238 27 1246 12 1232 28 1245 3 1 13~ 901-29 1243 14 0 30 1244 i l l l ' 15 0 31 1242 16- ~S58 m..&
UNIT SHIT 1 DOWNS AND POWER REDUCTIONS ~ c DOCKET NO. 50-499 UNIT '2' DATE Nov. 3. 1989-COMPLETED BY A.P. Kent . TELEPHONE 512/972-7786 REPORT MONTH OCTOBER 1 No. Date Type Duretion Reason Method of Licensee System Comporent Cause 6 Corrective Action to (Hcurs) Shutting Event Code Code-Prevent Recurrence Down Report # Reactor 89-09 891005 F 0.0 A 5-N/A KV FLT Reactor power was reduced to ~58% due to indications of high winding temperatures on Open Loop Auxiliary Cooling Water Pump Motors. After the air filters on the motors were cleaned reactor power was increased. 89-10 891013 F 55.5 A 3 2-89-026 JC IB Reactor / Turbine trip occurred frt,m a high neutron flux negative rate detection on two of four power range neutron moni-toring channels. The exact cause of the detected negative rate could not be deter-mined, but has been attributed to a Control Rod dropping due to an intermit-tent high resistance connection in its stationary gripper circuit diode. The faulty diode was replaced. The root cause of the event is under investigation. 1F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explsin) ,1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage ~ATT/sCHMENT 1 F-Administ.rative 5-Reduction ST-HL-AE-12. # G-Operational Errot (Explain) 9-Other PAGE y ()F 6 H-Other (Explain)
.g ? A ?.g p - If-.. .' 4 i - ATTACHMENT
- 2. -
. ST-HL AE flid u
- PAGE 6 0F #
PORVs and Safety Valves Sn-ry i y .No PORVs or: Safety Valves were challenged during this reporting period. n s f h. k b m h l l l l - l l-e.. ,s i [ -}}