Docket No. 50-295
t/0V 151983
Docket No. 50-304
Commonwealth Edison Company
ATTN: -Mr. Cordell Reed
Senior Vice President
Post Office Box 767
- Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. I. T. Yin and
Ms. V. P. Lougheed:of.this office on September 11 through October 18, 1989, of
' activities at the Zion Nuclear Power Station, authorized by NRC Operating
Licenses _No. DPR-39 and No. DPR-48, and to the discussion of our findings with
Mr.: T. Reick and others-of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report documents our evaluation of your
- corrective actions conducted.for-the findings documented in'the Region III
Safety Systems Outage Modification Inspection (SSOMI) Report No. 50-295/88003.
The: inspection consisted of a-selective examination of procedures and
representative records, observations, and: interviews with personnel. The
intent of this' inspection was to follow-up on.your corrective: actions to the
findings from;the SSOMI,~especially those related to the' handling of temporary
c
- alterations to the facility and the concerns with installed wiring in the-ceble
trays.
-'Your handling of the temporary modification program showed some improvement.
- Safety evaluations, when performed, had significantly improved. However.
- safety evaluati'ons were still not always being performed when required. Some
steps were taken to help identify when safety evaluations were needed, most-
notably the development of a preliminary safety review form, but implementation
has been inadequate in many instances. We are. concerned that many station
!
-
personnel do.not understand the requirement.nor the intent behind the
requirements of 10 CFR 50.59. From the Zion. Management Meeting of November 14,
1989, at the Region III office, we understand you are'taking. steps to revise
p'
your procedures regarding 10 CFR 50.59 implementation.
In the interim, close
';
L-
management attention to this issue is warranted.
L
During this inspection, certain of your activities anpeared to be in violation
- ~
of NRC requi?ements, as stated in the enclosed Notice. A written response is
required.' The response to the violation of 10 CFR 50.59 should address why
these examples are not indicative of a more generic problem in regard to
. performance Of 10 CFR 50.59 evaluations.
l
.
e
{E01
1
r
.
,
,
,
.
.
.-
-4
Commonwealth Edison Company
2
NOV 151989
.
The responses directed by this letter and the accompanying Notice are not
'
subject to the clearance procedures of the Office of Management and Budget
as required by the Paporwork Reduction Act of 1980, PL 96-511.
In accordance with 2.790 of the Commission's regulations, a copy of this letter,
the enclosure, and your response to this letter will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
CRIGINAL SIGNED Bf HUBERI J. MILLER
Hubert J. Miller, Director
Division of Reactor Safety
Enclosures:
1.
2.
Inspection Report
No. 50-295/89030(DRS);
'No. 50-304/89030(DRS)
cc w/ enclosures:
T. J. Maiman,'Vice President,
PWR Operations
T. Kovach, Nuclear
Licensing Manager
T. Joyce, Station Manager
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII-
Richard Hubbard
J..W. McCaffrey.. Chief, Public
Utilities Division'
Mayor, City of Zion
Chandu Patel, Project
Manager, NRR
i
I h
III
QF
.
I
I
RI
111ps flr g[ /89
Yn g/jk
ougheed
Martin
ii ler
11////89
11/
11//y/89 11//$ /89
3
11/13/89
11/4/89 11hA /89