Forwards Insp Rept 50-312/89-17 on 890927-29.No Violations Noted.Insp Determined That Previous Commitment Dates to Upgrade Fire Protection Program Have Not Been Met.Nrc Understands That Corrections Will Be Submitted by 891130
ML19332C127
Person / Time
Site: Rancho Seco
Issue date: 11/07/1989
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Keuter D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML19332C128 List:
References
NUDOCS 8911220343
Download: ML19332C127 (2)


See also: IR 05000312/1989017

Text

ym

-

-

L

c.>

,

jx

-

i

'

NOV - 7 1989

Docket No. 50-312

i

Rancho Seco Nuclear Generating Station

i

,

Sacramento Municipal. Utility District

'

14440 Twin Cities Road

S'

.

"

~

Attention:.

Mr. Dan R. Keuter'

e

' Assistant General Manager

'

Nuclear

'

Subject:

NRC Inspection'of Rancho Seco

l )

.

This refers to the special inspection conducted by Mr. C. Ramsey, of this

.'

office during the period September 27-29. 1989, of the activities authorized

-

' by NRC License No. OPR-54, and to the discussion of findings by the inspector -

with members of your staff at the conclusion of the inspection. This

inspection also included a review of completed fire protection surveillances,

required by plant Technical Specifications, which were provided to the

I

inspector on October 16, 1989.

-

"

The inspection.was performed to confirm the adequacy of fire protection

,

program implementation being maintained during the current Rancho Seco

,-

shutdown mode. Areas. examined during this inspection are described in the

!

,'

enclosed inspection report. Within these areas.-the inspection consisted of

selective examination of procedures and representative records, interviews

'

,

with personnel, and observations by the inspector. The inspection determined

1

that previous commitment dates to upgrade the fire protection program have not

been met and that staffing levels and management emphasis regarding the

integrity of.the program have been reduced.

'

.We_ understand that you' intend to make a written submittal to Region V by-

November 30, 1989, advising'the NRC of the specific actions you are taking to

complete implementation of previous fire protection program commitments, as

well as providing similar information on other commitments which are being

modified.:

-

,

No violations.of NRC requirements were identified within the scope of this

'

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

.

will be placed in the NRC Public Document Room.-

Should you have any questions concerning this inspection, we will be glad to

"

discuss them with you.

Sincerely,

'

LO110 M M m L

D.F.Kibach, Chief

Reactor Safety Branch

[

g 1 2 %' M $9 '6b y 2

.

1 V;I

5

Lk

-

o

'

.

-

f

  1. -

. . .

...:

L

3. .

I

liDV - 7 19i!9

,

2-

Enclosure:

Inspection Report Nos. 50-312/89-17

,

cc w/ enclosure:

Mr. P. Bender, SMUD

Mr. S. L. Crunk, SMUD

Ms. J. Schori, SMUD .

State of CA

bec w/ enclosure:

Project Inspector

Resident Inspector

docket file

R. Nease, NRR

G. Cook

B. Faulkenberry

J. Martin

bec w/o enclosure:

J. Zo111 coffer

M. Smith

,

N. Western

l

REGION V

CRamsey/ dot

kHuey

SRichards

irsch

11/A/89

11/$/89

11/'//89

11/ 4 89

Cn-

/

m

EST COPY ]

EST COPY.d 4EQUEST COPY '.

STCOPY1.

YES / NO

ES// NO (] YES )/ NO

/

E

/ NO

]

tv

v

-

TO PDR ]

'ES / NO

]

i

l

..

i