ML19332C060
| ML19332C060 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/16/1989 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML19332C061 | List: |
| References | |
| NUDOCS 8911220261 | |
| Download: ML19332C060 (3) | |
See also: IR 05000424/1989029
Text
?
.
y
i .'D_ , ;
"
'
' C ",
.,f
,
.
November 16, 1989
Docket Nos. 50-424,:50-425
, License Nos._NPF-68, NPF-81:
- Georgia Power Company
ATTN:
Mr..W. G. Hairston, III
-Senior Vice: President -
Nuclear Operations
=P; 0. Box 1295
-Birmingham, AL 35201-
Gentlemen:
iSUBJECT:--NRC' INSPECTION REPORT NOS. 50-424/89-29 AND 50-425/89-33
'This refers to the Nuclear' Regulatory Commission (NRC) inspection conducted by
P. T. Burnett: on October. 16-20,,1989.
The inspection included a review of
activities : authorized for your Yogtle facility. ' At the conclusion of the-
inspection, the findings were _ discussed with those members of your staff
-identified in the enclosed Inspection Report.
Areas - examined during the inspection are identified in the report.
Within
these areas.. the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in-progress.
Within - the' scope of the inspection, no violations or deviations were
identified.
In accordance with Section 2.790 ; of the NRC's " Rules of Practice," Part 2,
LTitle-10, . Code _ of- Federal- Regulations, a copy of this letter- and its enclosure
will be placed in the NRC Public Document Room.
.Should you have any questions concerning this letter, please contact us.
Sin:erely,
original signed by
Caudie A. Julian
Caudie A. Julian, Chief
Engineering Branch
Division of Reactor Safety
' Enclosure:
NRC-~1nspection Report
cc w/ encl:
(See page 2)
8911220261 891116
ADOCK 05000424
O
pe /
_ . . . . . . . _ . . .
_
-
r
m:m
.-
<:1
4
- ) , ;*
.
t,
.. Georgia - Power Company '
~2
_
November 16, 1.989
' '
'
cc w/ enc 1:
"
R. P. Mcdonald
'
-Executive Vice President-Nuclear
"
.. Operations
Georgia Power Company-
P. 0.' Box 1295
[
,
Birmingham,: At. 35201-
.
C'.
Ki McCoy
Vice President-Nuclear
ft
Georgia Power Company
P. 0. 1295-
L
Birmingham, AL.
35201
G. Bockhold, Jr.
General Manager, Nuclear Operations
Georgia Power Company .
P. O.;1600'
'Waynesboro,'GA -30830-
J.'A'. Bailey
Manager-Licensing -
Georgia Power Company
P.:0. Box 1295
. Birmingham,,AL 35201
B..W.~ Churchill. Esquire
~ Shaw,' Pittman, -Potts, and Trowbridge
'2300 N Street, NW
D.'
C.
20037
-
J.~E._ Joiner, Esquire
Troutman, Sanders, Lockerman, and
Ashmore-
1400-Candler Building
127.Peachtree Street, NE
Atlanta, GA 30303
0. Kirkland, III, Counsel
-
Office'of the Consumer's
l
Ut111ty Council
j
JSuite 225, 32 Peachtree Street, NE
l
l
Atlanta, GA 30302
Office of Planning and Budget
Room 615B
270. Washington Street, SW
,
p
Atlanta, GA 30334
(cc w/ enc 1 cont'd - see page 3)
'
.
.
W:
,
f
I l,,
'l'j
'
.
-
t
=Georgie; Power Company
3
November 16,.1989
,
n
p
-
l(cc w/ enc 1 cont'd)' ~
L
- 0ffice'of.the County Commissioner.-
!
'
Burke County' Commission
-
Waynesboro,-GA 30830r
J..; Leonard Ledbetter, Director
. Environmental Protection Division
Department of Natural Resources
- 205 Butler- Street, SE, Suite 1252
- '
. Atlanta, GA;:30334
g
.. Attorney General
. Law Department:
!
-
b-
132 Judicial Building:
F
Atlanta,~ GA 30334
"
State of. Georgia
bec w/ encl:
~
E. Reis;-OGC
-J.
Hopkins,.NRR-
'K.-Brockman, RII-
J. Zeiler, RII
" Document Control Desk
NRC Resident Inspector'
"
U.S'. Nuclear Regulatory Commission
.
P. O. Box 572
{
Waynesboro, GA.-30830
,
P
RII:D
RII:DRS
RII
RII:
Jl
.
%-
.
PTBa
t:er
J iler
GA
isle
KB
an
llf
llYl0
fllN l 0
'
.j
.