ML19332A885

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amends 49,44,58 & 53 to Licenses DPR-19,DPR-25,DPR-29 & DPR-30,respectively
ML19332A885
Person / Time
Site: Dresden, Quad Cities  
Issue date: 09/08/1980
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19332A872 List:
References
NUDOCS 8009180526
Download: ML19332A885 (2)


Text

c].

o 7590-01 UNITED STATES NUCLEAR REGULA10RY COMMISSION DOCKET NOS. 50-237, 50-249, 50-254 AND 50 2_65 COMMONWEALTH EDISON C0f1PANY AND IOWA-ILLINOIS GAS AND ELECTRIC COMPANY NOTICE OF ESSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 49 to Provisional Operating License No. OPR-19, and Amendment No. 44 to Facility Operating License No. DPR-25, issued to Conmonwealth Edison Company, which revised the Technical Specifications for operation of the Dresden Nuclear Power Station, Unit Hos. 2 and 3, located in Grundy County, Illinois.

The Commission t s also issued Amendment No. 58 to Facility Operating License No. DPR-29, and Amendment No. 53 to Facility Operating License No. DPR-30, issued to Commonwealth Edison Company and Iowa-Illinois Gas and Electric Company, which revised the Technical Spec-ifications for operation of the Quad Cities Nuclear Power Station, Unit Nos. I and 2, located in Rock Island County, Illinois. The amendments are effective as of the date of issuance.

The amendments revise the Technical Specifications to allow the count rate on the Source Range Monitor (SRM) channels to#go below three (3) counts per second when there are two or less fuel assemblies in a quadrant and they are positioned adjacent to the SR" in that quadrant.

The applicatien for the anendments complies with the standards and f

requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulatior, in 10 CFR Chapter I, which are set forth in the license amendments.

Prior

[2s

~4"d9100 L

7590-01 !

public notice of these amendments was not requ wed since the amendments de not involve a significant hazards consideration.

The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR Section 51.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of these amendments, for further details with respect to this action, see (1) the application for amendaents dated May 15, 1980, as supplemented September 3, 1980, (2) Amendment No. 49 to License No. DPR-19, Amendment No. 44 to License No.

DPR-25, Amendment No. 58 to License No. DPR-29, and Amendment No. 53 to License No. DPR-30, and (3) the Comission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W., Washington, D. C., and at the Morris Public Library, 604 Liberty Street, Morris, Illinois, for Dresden 2 and 3 and at the Moline Public Library, 504 - 17th Street, Moline, Illinois, for Quad Ci:1es 1 and 2.

A copy of itens (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, f

D. C.

20555, Attention: Director Division of Licensing.

Dated at Bethesda, Maryland this 8th day of September 1980.

FOR THE NUCLEAR REGULATORY C0lHISSION Thomas

. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing 4

E