O' OPERATING DATA REPORT
,s TE COMPLETED BY P. R. Underwood TELEPHONE 912-36/-//d1 i
OPERATING STATUS
\\
- 1. Unit Name:
Hatch 1 Notes
- 2. Reporting Period:
'R-RO
- 3. Licensed Thermal Power (MWt):
2436
- 4. Nameplate Rating (Gross MWe):
R04.3 S. Design Eectrical Rsting (Net MWei:
777.3
- 6. Maximum Dependable Capacity (Gross MWe):
746.3
- 7. Maximum Dependable Capacity (Net MWel:
764.3 i
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. lf Any (Net MWe):
- 10. Ressans For Restrictions,if Any:
This Month Yr.-to Date Cumuistive II. Hours In Repdrting Period 744 5855 4091P
- 12. Number Of Hours Reactor Was critical 722.9 4889.8 30687.8
- 13. Reactor Reserve Shutdowit Hours 0.0 0.0 0.0 4
- 14. Hours Generator On.Line 708.2 4460.1 28728.5 l
IS. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1587689 10012853 60365888 1
- 17. Gross Electrical Energy Generated (MWH) 507230 3275770 19546710
- 18. Net Eectrical Energy Genersted (MWH) 484603 3119762 18581695
- 19. Unit Service Factor 95.2 76.2 70.2
- 20. Unit Availability Factor 95.2 76.2 70.2
- 21. Unit Capacity Factor IUsing MDC Net) -
85.2 69.7 59.4
- 22. Unit Capacity Factor (Uning DER Net) 83.8 68.5 58.4
- 23. Unit Forced Outs;e Rste 4.8 23.8 21.2
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.snd Duration of Each):
l l
- 25. If Shut Duwn At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test $tstus IPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMilERCl % L OPER A TION
....... _ ggj77 3 8009180 $7
AY1 RAGE DAILY UNITPOWER LEVEL DOCKET NO.90-171 UNIT H A f f*h DATE 9-10-80 COMPLETED BY P. R. Underwood TELEPHONE 912-367-7781 s
MONTH R-Rn
~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
~ (MWe-Net) 1 714 17 723 2
690 33 729 3
9"A 19 751 4
494 20 754 5
143 21 715 6
320 22 650 7
590 23 645 3
729' 24 754 9
719 23 75g 10
-
- 6 7' 26 758
"~
11 754 27 754 12 771 23 752 13 77 29 749 14 594 30 748 15 773 3l-748 16 AAR INSTRUCTIONS On this format. list the aver 1ge daily unit power level in MWe. Net for each day in the r the nearest whole megawatt.
put 7y G
~ _ _ _ -
gl sa
- ' i D
D O
e
~
DOCKET NO.
- 50-32M UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Hatch
'Q DATE 9-10-mi d
~ ~ -
P R. t nderwnnd
,Q REPORT MONT11 _fcf" COMPLETED BY [g2-36)-7781 TELEP110NE 8Fe@
i c
n 3
Licensee Ev,,
k Cause & Corfective M
,Iy
}.]
,N.
Date k
g*
- !i oc Event u3 Act6onle od j gy, g Repost #
'E L8 Psevent Recussence 6:9 cd.
W o
\\
,D
- r R8 CONROD Reduce load in order to perform rod b
80-34 800802 F
20.75 0
5
.NA pattern adjustment
' ' ~ ~
80-35 800804 F
18.73 G
3 NA EC INSTRU Operator inadvertently repipced a
~
6-watt 145 volt indicating light 1,n j
l the control panel with a 6 watt 6 volt indicating light-thus causing a 3-amp fuse in EllC cabinet to blow.
i 4
80-36 800805 F
4.38 D
5 NA EC INSTRU Unit ort startup ramp from above shut-i down 180-35
)
80-37 800805 F
26.05 D
5 NA,
HC HTEXCH Reduced load to increase' condenser l
vacuum 80-38 800806~
F 18.83 D
5
'NA IIC llTEXCH Reduced power to swap out SJAEs l
80-39 800809 F
9.5 D
5 NA RB CONROD Reduce load in order to perform rod N
i 1
F: Forced Reason:
Method:
4 3
I 2
Enk: bit G-Insieuctions S: Scheduled A Equipmens Failure (Emplain) l-Manual f. Psepasation of Dasa D Maintenance or Test 2 Manual Scraen.
Enity Sheels for Licensee C Refueling 3 Auton.dic Screen.
Event Repost (l.ER) File (NUREG-D Regulatory Restricilon
.40shcrtlFxphein) 0161)
E-Opesator Training & License Emandnation
- 4. continuation i
F Administrative
- 5. Load Reduction 5
Exhibit 5 Same Simace G-Ope 4tional Esmr (Explain) 7*other (9/77) llother (Explain) 1,
s.
.m
.^
R F
~
y C-.d K
UNIT SilU1 DOWNS AND POWER REDUCTIONS IT N E
Ha h1 DATE 9-10-RO I
COM2 LETED Sy P. R. Ilnderunnd I
REPORT MONTil 8-RO TELErilONE 917-367-77R1
(,
g 4
N
%S i
1 y
w a
g l
Lkensee Ev g
Cause & Cuenecalve 3.y Ug!
Event Eg (i
^ "
sli jdi Report #
mu Eu y,,,,,',g,c.,,,,c, M
'N..
Daic k
'ii 8 g
H b
80-40 800812 F
17.07 A
3
.NA -
'1 PUMPXX Low Rx water level because of loss of. feed pump
~ ~ "
80-4 1 800813 F
20.9,8 D
5 NA CH PUMPXX Unit.,on startup rarrip from above shut-l down #80-40 I
80 12 800816 F
5.62 0
5 NA RB CONROD Reduce load in order to' perform rod pattern,adjustrant 3
i lEO-43 800818 F
3.5 A
5 NA WA VALVEX PSW t'o'H2 cooler 4-way valve was not l
~
~
properly aligned to allow total PSW to pass through cooler l
80-44 800821
,F 6
D 5
NA PC HTEXCH Reduced load to increase condenser 4
vacuum. Loss vacuum because of vhlve j
l N62rF038 stuck c!6 sed i
~
i j
l 3
4 I
I 2
Meshod:
Exhible G. Instructions F: Forced Reason:
1-Manual forP wation of Data i
S: Scheduled A Equipment Failure (Emplain)
R. Maintenance of Test 2 Manual Scrain.
Entry heets for Lkensee
- 3. Automatic Scrain.
Event Repunt (LER) File (NUREG-d C Hefueling D Regulatory Restektion
- 0elsest6aptabe)oc 0161)
E Operator Training & License Enamination
- 4. continuation i
F Admintsisative
- 5. Load Reduction
-I Exhible 1.Same Sousee G. Operational Ensut (Empiale) 7.0ther I
(9/77) 11 Othes (Emplain)
h 9
M e
m L3
.g CD) 50-3?!
DOCKET NO.
M UNIT SiluTDOWNS AND POWER REDUCTIONS UNIT NAME flatch 1 DATE 9-10-N1 COMPLETED BYP. R. Underwnnd 6
9 REPORT MONTil. 8-80 TELErtlONE 912 t67 7791 g
6J W
"t.
Licensee Eg k
Cause & Cur,sessive
.I g i
If Action io b
N..
paic gg
.g
, g a:
Event u3 a
A g s, e Rego,i,
eu u
r, event Rec.,,e.e e
o g
80-45 800822 F
11.75 A
5 80-103 WA FILTER Loss of PSW because of sheared key-way in division II. strainers.
Key-
.way. sheared because of debris.
i l
l e
j 4,
l i
i A
g i
y s
3 4
Method:
Emidbit G. insieuctions 1
3 F: Forced Reason:
- 1. Manual for Pseparation of Data I
S: Scheduled A E.tuipment Failure (Esplain)
Il Maintenance ct Test 2-Manual Scrass.
Entry Sheets for 1.icensee
' Automatic Scrain.
Event Repust (LER) File (NUREG.
C.itefueling D Itegulaimy Restelcilon A.Oths 4Esphh$c 0161)
E Opesaint Training & License Emaininsolun 4.contlnuation 3
F.Administ rative
- 5. Load Reduction Eshible 1.Sanw Souece G Operational Essur (Emplain) 7*Otl'"#
(9/77)
II Other (Emplain) l i.
1 NARRATIVE REPORT UNIT 1 August 2nd At 2030 reduced load in order to perform a rod pattern adjustuent August 4th At 17:0'O Rx auto scram on loss of EHC DC input power.
Loss of DC power was due to a blows 3-amp fuse in EHC cabinet.
Fuse blev because of overload caused by improper indicating light being placed in control panel August 5th Startup from above scram.
Rx critical at 04:33 and generator on line at 11:44 August 5th Reduction due to increased condenser vacuum August 6th At 18:10 reduced load to swap SJAEs August 9th Reduced load in order to perform a rod pattern adjustment August 12th At 23:03 Rx auto scram on low wt.'er level because of loss of feedpump.
Generator off line at 22:57 August 13th Startup from above scram.
Rx critical at 08:36 and generator on line at 16:01 August 16th At 20:30 reduced load to perform a rod pattern adjustment August 18Ih Reduced load in order to properly align 4-way valve in PSW to H2 cooler.
Valve was not properly aligned to allow total PSW flow to pass through H2 cooler August 21st At 2000 reduced load because of loss of vacuum because valve N62-F003B had stuck in closed position August 22nd At 2000 reduced load because of loss of PSW.
Loss PSW because of sheared keyway in Division II strainers.
Keyway sheared due to debris accumulation on strainer There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual values during August of 1980.
9
HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR AUGUST 1980 NUMBER DATE COMPLETED DESCRIPTION 50-3449 8-13-80 Replaced Yarway Rx level instru-ment and calibrated.
Mater was hanging up.
80-4191 8-12-80 Replaced motor on RER inboard injection valve.
Motor was found to be burnt up. Ref. DCR 80-274 80-3897 7-29-80 Replaced breaker on RHR d/w spray MOV.
Breaker would not lock in closed position 80-3700 8-11-80 Relay C71-81-3F was found to be chattering.
This chattering w s.s caused by a faulty under frequen-cy monitor.
Replaced and calib-rated under frequency relay 80-3905 7-28-80 Modified anchors on E51-RCICH-23 to provide adequate seismic support per DCR 80-259 80-3081 8-4-80 Replaced CRD HCU pressure switch isolation valve.
Valve was leaking when switch was isolated.
80-35b4 8-5-80 Installed limiter in HPCI controller per DCR 80-218 80-3948 8-1-80 Inspected and repaired woodward governor drive gears and speed pickup gears on HPCI 80-4130 8-22-80 Cleaned top isolation valve stem treads for Ell-N040.
Replaced valve stem
- guide, locknut, and handwheel 80-2938 8-18-80 Replaced seismic snubber MSVA-1 with seismic snubber PSA-1 80-2841 6-8-80 Replaced s nubbe r MS*/A-1-B21-10 9-5 5
.~
~
.-