Lists Issues to Be Addressed Re Restart of Unit.Items Identified Should Be Resolved Prior to Cycle 2 Operation & Do Not Include Anticipated Submittals of Tech Spec Changes. Requests Response Advising of Submittal Date for Each Item
ML19332A722
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/26/1980
From: Verrelli D
Office of Nuclear Reactor Regulation
To: Randy Baker
Georgia Power Co
References
NUDOCS 8009180163
Download: ML19332A722 (3)


Text

.

F-

~TER A

~

}

/

\\

UNITED STATES j

y i

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 i

August 26, 1980

i Docket No. 50-366

=

l

}

Mr. Ray Baker i

Georgia Power Company 1

P. O. Box 4545 Atlanta, GA 30302

Dear Mr. Baker:

We are fast approaching the first refueling outage for Hatch Unit No. 2, scheduled to becin approximately November 15, 1980. As you are aware, there are a number of outstanding issues on Hatch 2 that could impact the timely restart of the Unit.

I believe it prudent for me to itemize taese for your information.

I number of issues are leoally binding, i.e., License Conditions, that I must explicitally address in the Safety 7.

+

Evaluation supporting restart. Others, although not conditions for n? restart, should be resolved. My expectation of your submittals are summarized below:

(a) Cycle 2 Operation (Reload Submittal) - A plant specific reload fuel application will be necessary. Your submittals for Cycle 2 operation will substantiate operation within the limits set forth in NEDE 24011, as amended and approved by the NRC Staff.

(b) Fuel Performance - License Condition 2.C.(3)(a) requires that start-up for "that cycle in which burnups greater than 20,000 MWD /T are expected," a GEGAP-III analysis must be submitted and approved by the staff. You should explicitally address the applicability of this issue to Cycle 2 operation.

(c) Fire Protection - This is a License Condition (2.C.(3)(b)).

I consider your submittal of May 29, 1979 to have satisfied the requirement for submitting T. Specs.

However, please be advised that modifications must be completed before restart.

(d) ODYN Code Calculations for MCPR Limits - License Condition 2.C.(3)(c) requires this analysis. Your submittal for cycle 2 operation -

see (a) above - should explicitally state that this has been satisfied.

.(e) Boiling Transition - License Condition 2.C.(3)(d) requires submittal for cur approval, the use of the GEXL correbcion for S x 3 R fuel bundles for Cycle 2.

Your submittal should address this issue.

8 0091ge llo3,

k

U 3,

i N' i

t 3

(f) RPS Power Supply - License Condition 2.C.(3)(c) requires modifications such as we have previously reviewed on Hatch 1 (Ref. Amend. No. 70,

(

August 14,1979). We will need a submittal-on this issue.

i (g) Static Exciter Cabinets - As stated in our SE supporting issuance i

of the Operating License (NUREG-0411, P. 3-23) we requested 5

qualification of this cabinet. We have had discussions of this j

issue; however, you need to indicate the resolution, i.e.,

i qualification or replacement of the cabinet.

(h)

Isolation Actuation Instrumentation Setpoints - The initial issuance of T.S. for HNP 2 (See table 3.3.2-3) contained a number of initial setpoints which are to be determined (revised) during startup testing.

I believe we should finalize these values.

I i

(i) Settlement of Category I Structures - The initial T.S. for HNP 2 5

indicated that we would establish LC0's on differential settlement I

of Class I structures. We have not yet received a response to T

our letter of November 27, 1979.

I believe this issue needs i

reinforced attention.

=

E The items identified above are limited to those which I currently envision

}

are in need of resolution prior to HNP-2 Cycle 2 operation. They do not include anticipated submittals of other T.S. changes that-you may desire (e.g. Primary Containment Airlocks, Single Loop Operation).

In view of the vast number of outstanding issues that could impact the restart of HNP-2 you and your staff may wish to meet with the NRC staff representatives to expedite these actions. Such a meeting could be held 3.

in Bethesda, Atlanta, or Baxley as ' appropriate.

In any event, please, advise me of your planned submittal dates for each of the items discussed above.

r Sincerely, i'

,/

Q-W Dapid M. " rrelli, Project Manager Operatin Reactors Branch #4 Divisio of Licensing cc: See next page

4

~

Hatch 1/2 50-321/366 f

Georgia Power Company E

cc w/ enclosure (s):

h G. F. Trowbridge, Esq.

Director, Technical Assessment 4

Shaw, Pittman, Potts and Trowbridge Division w

1800 M Street, N.W.

Office of Radiation Programs Washington, D. C.

20036 (AW-459) g U. S. Environmental Protection Agency g

Ruble A. Thomas Crystal Mall #2 i

Vice President Arlington, Virginia 20460 i

P. O. Box 2625 2

Southern Services, Inc.

Birmingham, Alabama 35202

=

. f Ozen Batum Charles H. Badger P. O. Box 2625 Office of Planning and Budget

=

-if Southern Services, Inc.

Room 610 Birmingham, Alabama 35202 270 Was ongton Street, S.W.

Mr. H. B. Lee, Chairman Appling County Commissioners

=

Fi.

County Courthouse i

Baxley, Georgia 31513 i

i.~

Mr. L. T. Gucwa Georgia Power Company Engineering Department P. O. Box 4545 Atlanta, Georgia 30302 Mr.-Max Manry Georgia Power Company Edwin I. Hatch Plant P. O. Box 442 Baxley, Georgia 31513 U. S. Eny'ronmental Protection Agency Region IV Office ATTN: EIS COORDINATOR 345 Courtland Street, N.E.

Atlanta, Georgia 30308 Appling County Public Library Parker Street Baxley, Georgia 31513-

}

Mr. R. F. Rodgers U.S. Nuclear Reculatory Commission