ML19332A664

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/80-15 on 800501-31 & Notice of Violation
ML19332A664
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/07/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19332A660 List:
References
NUDOCS 8009160637
Download: ML19332A664 (2)


See also: IR 05000395/1980015

Text

F.

.

,

[on at:g%

,i

>

UNITED STATES

I

i,

NUCLEAR REGULATORY COMMISSION

!.

I

E

REGION 11

9

101 MARIETTA ST., N.W., SUITE 310o

o

ATLANTA, GEORGIA 30303

"***

JUL 0 71980

In Reply Refer To:

RII:JLS

50-395/80-15

,

South Carolina Electric and Gas Company

ATTN:

T. C. Nichols, Vice President

Power Production and Systems Operations

P. O. Box 764

Columbia, SC 29218

Gentlemen:

This refers to the inspection conducted by J. L. Skolds of this office on May 1

through 31, 1980 of activities authorized by NRC Construction Permit No. CPPR-94

for the V. C. Summer facility, and to the discussion of our findings held with

0. S. Bradham at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to-be in noncompliance with NRC requirementt.. These items and references

to pertinent re,quirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you purnant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statem'ent of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application . is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

.

8009160 h f

- - - - .

e-

.

.

South ~ Carolina Electric and

JUL 0 71980

Gas Company

-2-

0

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

K. c.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-395/80-15

cc w/ enc 1:

T. B. Conners, Jr.

A. A. Smith

0. S. .Bradham, Manager

Nuclear Operations

,

L__