Supplemental Info to Effluent & Waste Disposal Semiannual Rept,For 791015-1231 Re EPICOR-II
ML19332A255
Person / Time
Site: Crane  
Issue date: 09/05/1980
From:
METROPOLITAN EDISON CO.
To:
Shared Package
ML19332A231 List:
References
NUDOCS 8009110344
Download: ML19332A255 (8)


Text

-

EFFLUENT AND WASTE DISPOSAL SEMI ANNUAL REPORT octob er 15, 1979 - December 31, 1979 SUPPLEMENTAL INFORMATION DPR-73-320 FACILITY T!I Unit II, Epicor II LICENSEE 1.

Regulatory Limits a.

Fission and activation gases:

Tech Specs, c.

ates, half-lives > 8 days:

rt 3

d.

Liquid effluents:

2.

Maximum Permissible Concentrations Provide the MPCs used in determining allowable release rates or concentrations, a,

Fission and activation gases:

0 m, Part 20, Appendix B cl art cu ates, half-lives 8 days:

d.

Liquid effluents:

3.

Average Energy Provide the average energy (E) of the radiont.clide mixture in releases of fission and activation gases, if applicable-0.253 MeV 4.

Measurements and Approxications of Total Radioactivity Provide the methods used to measure or approximate the total radioactivity in effluents and the methods used to determine radionuclide composition.

Fission and activation gases: Ge(Li) Spectrometry, Liquid Scintillation a.

b.

Iodines: Ge(Li) Spectrometry c.

Particulates: Ge(Li) Spectrometry, Gas Flow Proportional d.

Liquid effluents: Ge(Li) Spectrometry, Liquid Scintillation 5.

Batch Releases c

Provide the following information relating to batch releases of radioactive materials in liquid and gaseous effluents.

l A.

Liquid No Batch Releases in 1979 1

l 1.

Number of batch releases:

2.

Total time period for batch release:

3.

Maximum time period for a batch' release:

4.

Average time period for batch releases:

1 5.

Minimum time period for a batch release:

6.

Average stream flow during periods of release of effluent into flowing stream:

l f,

.8009110* g

5.

Batch Releases (cont.)

B.

Caseous No Batch Releases in 1979 1.

Number of batch releases:

2.

Total time period for batch releases:

3.

Maximum time period for a batch release:

4.

Average time period for batch release:

5.

Minimum time period for a batch release:

6.

Abnormal Releases None A.

Liquid 1.

Number of releases:

2.

Total activity released:

B.

Gaseous 1.

Number of releases:

2.

Total activity released:

f

- - - - - ~,,-,

l TABLE 1A EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT CASEOUS EFFLUENTS-SUMMATION OF ALL RELEASES UNIT 3rd 4th EST. TOTAL UARTER QUARTER ERROR, %

Epicor II A.

Fission & activation gases 2.6E-1 2.5El

1. Total release Ci
2. Average release rate for period uCi/sec.

N/A 3.30E-2 Tech Spec Limit =

20 o

3. Percent of Tech Spec limit N/A 2.29E-3

.8E3 m se

= 1.44E3 pCi/sec B.

Iodines for Kr-85 a

1. Total Iodine-131 uCi/cc

<1E-13 2.5El

2. Average release rate for period UCi/sec.

N/A N/A Tech Spec Limit =

20% of 0.024 pCi/sec

3. Percent of Tech Spec limit N/A N/A

= 0.0048 pCi/sec C.

Particulates

1. Particulates with half-lives
  • > 8 Days Ci 2.64E-5 2.5El
2. Average release rate for period uCi/sec.

N/A 3.35E-6 Tech Spec Limit =

20% of 0.024 pCi/sec

3. Percent of Tech Spec limit N/A N/A

= 0.0048 pCi/sec

4. Gross alpha radioactivity Ci 4.1E-9 D.

Tritium

1. Total release u Ci/cc

<1E-6 2.5El

2. Average release rate for period 11Ci/sec.

N/A N/A Tech Spac Limit =

3 I

20% c~ 9.4E4 m /sec

3. Percent of Tech Spec limit N/A N/A

= 4. u

'sec

= 1.44E.oi/sec for Kr-85

    • Epicor II started operation in October,1979; therefore, there were no releases in the third quarter of 1979.

Note (1) - all less than (<) numbers are the LLD concentration in units of pCi/cc.

TABLE IB EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT CASE 0US EFFLUENTS-GROUND LEVEL RELEASE Continuous Mode Batch Mode 1

3rd 4th 3rd 4th j

Nuclides UNIT Released Epicor II QUARTER QUARTER QUARTER QUARTER No Batch Releases 1.

Fission gases - Note (1) in 1979 i-2,6 E-l krypton-85 Ci

<4E-8 krypton-85m UCi/cc krypton-87 VCi[cc

<4E-8

<2E-7 krypton-88 VC1/cc xenon-133 uC1/cc

<1E-7

<3E-8 xenon-135 VCi/cc xenon-135m pCi/cc

<4E-8

<5E-8

~

xenon-138 UCi/cc Others (specify)

C1 Ci Ci C1 Ci

~

Unidentified Ci Y

4 2.6E-1 Total for period Ci 2.

Iodines iodine-131 p Ci/cc

<1E-13 iodine-133 VCi cc

< IE-13

/

iodine-135 uCi/cc

<1E-12 I

V VCi/cc Total for period Epicor II started operation in October 1979. Therefore, there were no

'Ph" TEi7I releases in the third quarter of 1979, a_~..,

t, O ___

TABLE IB (cont.)

EFFLUENT AND k*ASTE DISPOSAL SEMIANNUAL REPORT GASEOUS EFFLUENTS-GROUND LEVEL RELEASES,

Continuous Mode Batch Mode Nuclides UNIT 3rd 4th 3rd 4th Released Epicor II QUARTER QUARTER QUARTER QUARTER 3

Particulates - Note (1) gf9 1.71E-7 strontium-89 Ci 1.75E-8 strontium-90 Ci cesium-134 pCi/cc

<1E-16 cesium-137 pCi/cc

<1E-16 barium-lanthanum-140

  1. Ci/cc

<1E-15 Others (specify)

Unidentified 2.62E-5

  • Epicor II started operation in October 1979. Therefore, there were no releases in the third quarter of 1979.

1 1

1 l

~j TABLE 2A EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT LIQUID EFFLUENTS-SUMMATION OF ALL RELEASES There were no Liquid releases in 1975 UNIT EST. TOTAL

~~

Epicor II QUARTER QUARTER ERROR %

A.

Fission and activation products

1. Total releases (not including tritiitm, gases, alpha)

Ci

2. Average diluted concentration pCi/ml durine variod
3. Percent of applicable limit B.

Tritium

1. Total release C1
2. Average diluted concentration dtring period UCi/ml
3. Percent of applicable limit C.

Dissolved and entrained gases

1. Total release C1
2. Average diluted concentration durine period uCi/ml
3. Percent of applicable limit D.

Cross alpha radioactivity

1. Total release Ci E. Volume of waste released liters (prior to dilution)

F. Volume of dilution water used liters durinc period m l

]

TABLE 2B EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT LIQUID EFFLUENTS There were no releases of Liquid from Epicor II in 1979 Continuous Mode Batch Mode N'uclides UNIT Released Epicor II QUARTER QUARTER QUARTER QUARTER strontium-89 Ci strontium-90 C1 cesium-134 Ci cesium-137 Ci iodine-131 c4 cobalt-58 C1 cobalt-60 Ci iron-59 Ci zine-65 Ci managanese-54 C1 chromium-51 Ci zirconium-niobium-95 Ci T

molybdenum-99 Ci technetium-99m Ci barium-lanthanum-140 Ci cerium-141 Ci l

Other (specify)

C1 Ci Ci l

Ci i

l C1 Ci ci Unidentified Ci l

Total for period Ci xenon-133 Ci l

xenon-135 Ci I

d,,,,_-- t-

}__

I f

(-

.._ _ _ _ _ _ i bi, __ s (,M R

I.

s 4

i.

i-l l 1

-l TABLE 3A EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT SOLID WASTE AND IRRADIATED FUEL SHIPMENTS There were no shipments of radioactive material from Epicor II in 1979 A.

Solid waste shipped off-site for burial or disposal (not irradiated fuel)

E

1. Type of waste 1;'i1IEpicor II TgTAL 6

h 3e

a. Spent resins, tilter sludges, m

evaporator bottoms, etc.

Ci 3

b. Dry coc:pressible waste, contaminated n

equioment, etc.

c4 3

c. Irradiated components, control m

rods, etc.

Ci ms

d. Other (describe)

Ci

2. Estimate of major nuclide composition (by type of waste) a.

t b.

y Y

^%

c.

g d.

g

3. Solid Waste Disposition Number of Shipments.

Mode of Transportation Destination l

B.

Irradiated Fuel Shipments (Disposition)

Number of Shipments Mode of Transportation Destination I

t

_