ML19332A005
| ML19332A005 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/01/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19331E463 | List: |
| References | |
| NUDOCS 8009100300 | |
| Download: ML19332A005 (2) | |
See also: IR 05000364/1980024
Text
.,
.
4 i_ [
gm
/
UNITED STATES
h<,
8" )
't
NUCLEAR REGULATORY COMMISSION
Y
U
E
REGION 11
g[
101 MARIETTA sT
N.W.. sulTE 3100
Q
ATLANTA, GEORGI A 30303
AUG - 1 1980
- +
In Reply Refer To:
RII:TDG
50-364/80-24
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
'
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by T. D. Gibbons of this office on
July 8-11, 1980, of activities authorized by NRC CPPR-86 for the Farley facility,
and to the discussion of our findings held with J. A. Mooney at the conclusion
of the inspection.
Areas examine ^d during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
1
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
'
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
ShouM you have any questions concerning 1ais letter, we will be glad to discuss
them with you.
Sincerely,
>
/
C. E. Murphy,
hief
Reactor Constructi n and Engineering
Support Branch
Enclosure:
(See Page 2)
8 00910 0 M
---
-
- . .
.
.
. . . _
.
o
e
g,
g
7-
Alabama Power Company
-2
AUG - 1 pgg
Enclosure:
Inspection Report No. 50-364/80-24
cc w/ encl:
A. R. Barton,. Executive Vice President
'
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr. , Senior Vice President
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
W. G. Hairston, III, Plant Manager
R. E. Hollands, Jr., QA Supervisor
O. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
.
4
.
d
.
- - - - , , - ,
,
,