Forwards IE Insp Rept 50-267/80-12 on 800601-30 & Notice of Violation
ML19331E338
Person / Time
Site: Fort Saint Vrain 
Issue date: 07/16/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen G
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML19331E339 List:
References
NUDOCS 8009100033
Download: ML19331E338 (2)


See also: IR 05000267/1980012

Text

//C_

.

M C'%cIo,

'

UNITED STATES

NUCLEAR REGULATORY COMMISSION

j

8~

$

REGloN IV

'

I

  • I

U '

[

ARLINGTON, TEXAS 76012

o

611 RYAN PLAZA oRIVE, SulTE 1000

7

a

g

\\v*... /

July 16,1980

,

In Reply Refer To-

Docket No. 50-267/80-12

Public Service Company of Colorado

Acts:

Mr. C. K. Millen

Senior Vice President

P.O. Box S40

Denver, Colorado

80201

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Messrs. M. W. Dickerson, R. E. Collins, S. R. Dean and J. P. Jaudon of this

office during the period June 1-30, 1980, of activities authorized by NRC

Operating License DPR-34, and to chair discussions of the findings with members

of your staff at the conclusion of the inspection.

Areas examined during this inspection-are described in our report, which is

'

enclosed with this letter.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

During this inspection it was found that certain of your activities were not

conducted in full compliance with NRC requirements, as set forth in the Notice

of Violation enclosed herewith as Enclosure (1). This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to

submit to this office, within 20 days of your receipt of this notice, a

written statement or explanation in reply including:

(1) corrective steps

which have been taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further noncompliance; and (3) the date when full

compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Tile 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you or your contractors believe to be

proprietary, it is necessary that you make a written application within

i

l

l

!

1

80 0 910 n D E3,

,

_

_

.

-

.

-

. --

.

.

Public Service Company of Colorado

-2-

July 16, 1980

20 days of this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information identified in the application

is contained in a separate part of the document.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

hb YO

G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

-

Enclosures:

'

1.

Notice of Violation

2.

IE Inspection Report No. 50-267/80-12

cc w/ enclosures:

D. W. Warembourg, Nuclear Production Manager

Fort St. Vrain Nuclear Station

P. O. Box 368

Plattcville, Colorado

80601

L. Brey, Quality Assurance

(Same Address)

,.