Responds to NRC Re Violations Noted in IE Insp Repts 50-352/80-05 & 50-353/80-05.Corrective Actions:Weld Cavity Repaired for Pipe Restraint
ML19331E334
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/17/1980
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19331E332 List:
References
NUDOCS 8009100026
Download: ML19331E334 (3)


Text

n f

'e PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 JUI.171980

'2's> = 45o2

,o m.....

V0CE-MIESIDENT twismasnema ano massanta Mr. Boyce Grier, Director United States Nuclear Regulatory Commission Office of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406

Subject:

USNRC IE Region I Letter dated June 19, 1980 RE: Site and Office Inspection of March 26-April 30,1980 Inspection Report No. 50-352/80-05 and 50-353/80-05 Limerick Generating Station - Units 1 and 2 File: QUAL 1-2-2 (352/80-05 and 353/80-05)

Dear Mr. Grier:

In response to the subject letter regarding items identified during the subject inspection of construction activities authorized by NRC License Nos.

CPPR-106 and -107, we transmit herewith the following:

Attachment I - Response to Appendix A Should you have any questions concerning these items, we would be pleased to discuss them with you.

Sincerely, J. S. Kemper JMC/mmk Attachment l

A0 0 g y gg Q2G,

4 t

ATTACHMENT I Response to Appendix A Item of Non Complicance Infraction Appendix B of 10CFR50, Criterion V, states in part:

" Activities affecting quality shall be accomplished in accordance with these instructions, procedures or drawings...."

The Limerick PSAR, Appendix D, Quality Assurance Program, Paragraph D.6.4 states, in part, that:

Bechtel Construction Department is responsible for construction of the plant to approved engineering specifications, drawings, and procedures...."

Bechtel's welding procedure GWS-(structural) Section 4.4.2.2 states in part that the repair cavity shall be reasonably smooth, free from excessiva notches or harmful irregularities which could trap slag or cause lack of fusion.

Contrary to the above, on April 29, 1980, welding had commenced on a repair area of pipe restraint No. 215 where the prepared cavity had areas which were very narrow (notch-like) and irregular; which could trap slag or cause lack of fusion.

Response to Infraction As stated in NRC - IE Inspection Report 50-352/80-05 and 50-353/80-05 paragraph 10.a, immediate corrective action was taken.

PECO QA issued a stop work order and investigated the cause of the infraction.

The investigation revealed that during the preparation of the weld bevel on pipe restraint #215, grinding operations uncovered several areas of slag and porosity.

In-process rework notice #W450 was issued and the rework notice instructed field personnel to grind as necessary to remove enough slag to allow an adequate seal weld, and then proceed with design welding.

This disposition on the rework notice failed to consider the effect of weld joint configuration on rework grinding and that the rework grinding would naturally result in the removal of base material required for the design weld.

. Rework Notice #W450 should have required a weld repair and not a seal weld in the base material.

I 1/2 50-352/80-05 50-353/80-05

F e

-P Response to Infraction (Continued)

The welder and foreman were interviewed and both were familiar with the requirements for preparing a weld repair cavity.

The infraction occurred because they attempted to follow the instructions on the Rework Notice.

An interview with Field Engineer who prepared Rework Notice

  1. W450 determined that he did not consider the possibility of over-grinding into the base material due to weld joint configuration.

The Field Engineer was instructed on April 30, 1980 that on future Rework Notices, the instructions should be more explicit when complex joint configurations are to be reworked.

A second Rework Notice (#W456) was' issued on April 30, 1980 to properly instruct the welder to perform the rework and repairs on this weld joint.

PECO QA released the stop work order upon the completion of the interviews and issuance of Rework Notice #W456.

The repair was completed on April 30, 1980.

I 2/2 50-352/80-05 50-353/80-05

-.